<rss version="2.0" xml:base="https://trust.zscaler.com/rss-feed/maintenance" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <channel>
    <title>Trust</title>
    <link>https://trust.zscaler.com/rss-feed/maintenance</link>
    <description>Trust Post Feeds.</description>
        <generator>trust.zscaler.com</generator>
    <language>en-us</language>
    <atom:link href="https://trust.zscaler.com/rss-feed/maintenance" rel="self" type="application/rss+xml"/>
              <item>
        <title>Scheduled Maintenance - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/29681</link>
                                <description>&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing a scheduled maintenance on zscalertwo.net cloud. This maintenance is scheduled for Saturday at 06:00 AM Pacific Time on May 23, 2026 (Saturday, May 23, 2026 01:00 PM UTC), and can take up to 4 hours to complete.&lt;/p&gt;&lt;p&gt;During maintenance, which includes the control plane, the Admin Portal might be temporarily placed into read-only mode, making the following unavailable: configuration changes, new user provisioning, and existing user updates through SCIM, LDAP, and SAML. A brief impact to new user authentication might occur. However, all the logs that are collected during this period will be available after the maintenance ends.&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 20 May 2026 20:43:04 GMT</pubDate>
                                                            <startTime>Sat, 23 May 2026 13:00:00 GMT</startTime>
            <endTime>Sat, 23 May 2026 17:00:00 GMT</endTime>
                                                                                            <Status>Upcoming</Status>
                                                <guid isPermaLink="false">29681 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Vienna I Datacenter Scheduled Maintenance - Service Expansion  - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/29671</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Vienna I (VIE1) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 21, 9:00 am PDT (May 21, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 21, 2:00 pm PDT (May 21, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Wed, 20 May 2026 16:01:56 GMT</pubDate>
                                                            <startTime>Thu, 21 May 2026 16:00:00 GMT</startTime>
            <endTime>Thu, 21 May 2026 21:00:00 GMT</endTime>
                                                                                            <Status>Upcoming</Status>
                                                <guid isPermaLink="false">29671 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance Extended - CHI - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29661</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance for CHI DCs by two hours. As part of our standard maintenance process, all logs will be collected and available after maintenance has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;p&gt;&lt;br&gt;&amp;nbsp;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;latest-update&quot;&gt;&lt;p class=&quot;zs-update-latest zs-update&quot; id=&quot;resolved-update&quot;&gt;&lt;strong&gt;Latest Update - &lt;/strong&gt;&lt;span class=&quot;report-time&quot;&gt;Wed, 20 May 2026 06:41:30 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;div class=&quot;update-list update-1&quot;&gt;&lt;p class=&quot;zs-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 20 May 2026 05:03:49 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;The team will be extending the scheduled maintenance for CHI DCs by one hour.&lt;/p&gt;&lt;/div&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 20 May 2026 06:41:30 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 20 May 2026 04:01:06 GMT</pubDate>
                                                            <startTime>Wed, 20 May 2026 04:00:59 GMT</startTime>
            <endTime>Wed, 20 May 2026 07:00:59 GMT</endTime>
                                    <ResolvedDate>Wed, 20 May 2026 06:47:01 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29661 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/29656</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on zscalertwo.net cloud. This maintenance is scheduled for Tuesday at 6:00 PM Pacific Time on May 19, 2026 (Wednesday, May 20, 2026 01:00 AM UTC), and can take up to 30 minutes to complete. During the maintenance, the ZIA Admin Portal, and access to policy management will not be available. A brief impact to new user authentication might occur. However, all the logs that are collected during this period will be available after the maintenance ends. Please contact Zscaler Support if you have additional questions.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 20 May 2026 01:39:43 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 20 May 2026 00:02:20 GMT</pubDate>
                                                            <startTime>Wed, 20 May 2026 01:00:00 GMT</startTime>
            <endTime>Wed, 20 May 2026 01:30:00 GMT</endTime>
                                    <ResolvedDate>Wed, 20 May 2026 01:40:05 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29656 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance Extended - LON, HKG - zscalertwo.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29651</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance for LON and HKG DCs by an hour. As part of our standard maintenance process, all logs will be collected and available after maintenance has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&amp;nbsp;&lt;/div&gt;&lt;p&gt;&lt;br&gt;&amp;nbsp;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 19 May 2026 23:13:07 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 19 May 2026 22:21:45 GMT</pubDate>
                                                            <startTime>Tue, 19 May 2026 22:16:04 GMT</startTime>
            <endTime>Tue, 19 May 2026 22:16:04 GMT</endTime>
                                    <ResolvedDate>Tue, 19 May 2026 23:13:17 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29651 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Tokyo V (TYO5) Datacenter Network Maintenance - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29641</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in Tokyo V (TYO5) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window:&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-05-20 11:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp;2026-05-20 14:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-05-20 20:00 - 2026-05-20 23:00 JST)&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 20 May 2026 12:48:09 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 19 May 2026 10:53:27 GMT</pubDate>
                                                            <startTime>Wed, 20 May 2026 11:00:00 GMT</startTime>
            <endTime>Wed, 20 May 2026 14:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 20 May 2026 13:01:31 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">29641 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Upcoming New Data Centers and Expansions - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/29631</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and per email notification sent on&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/zscaler-support-notification-new-data-centers.html?version=0&quot;&gt;&lt;span&gt;May 15, 2026&lt;/span&gt;&lt;/a&gt;&lt;span&gt;, we would like to notify you of the upcoming new data centers and expansions at the locations listed below. These would be available anytime on or after July 14, 2026; 60 days or more from the date the first email notification is sent.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists (ACLs) to allow the new IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;CIDR&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Toronto III&lt;/td&gt;&lt;td&gt;137.31.56.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Honolulu I&lt;/td&gt;&lt;td&gt;137.31.80.0/21&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Honolulu I&lt;/td&gt;&lt;td&gt;137.31.88.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Honolulu I&lt;/td&gt;&lt;td&gt;2605:4300:3d00::/40&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Beijing III&lt;/td&gt;&lt;td&gt;220.243.158.0/24&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Tokyo VI&lt;/td&gt;&lt;td&gt;137.31.64.0/20&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Tokyo VI&lt;/td&gt;&lt;td&gt;2400:7aa0:2f00::/40&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;span&gt;We recommend that you add the IP address ranges listed in the ‘Zscaler Aggregate IP Address Ranges’ section of the CENR pages (refer applicable links below) to your access lists, firewalls, and application allow lists to avoid service disruption. The IPs from these ranges can be put in use by Zscaler for Web and Internet Application communication and dynamic service resolution.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zpatwo.net/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 19 May 2026 04:32:17 GMT</pubDate>
                                                            <startTime>Tue, 14 Jul 2026 00:00:00 GMT</startTime>
            <endTime>Tue, 14 Jul 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 19 May 2026 04:28:30 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29631 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Miami IV Data Center online - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29626</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;You are receiving this notice in accordance with the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://help.zscaler.com/zia/zscaler-service-continuity-customer-notification-protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt;.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;As part of our effort to enhance our Security Cloud’s robustness and performance, Zscaler will be bringing online a new Miami IV (MIA4) data center. This facility will be added to the public resolution service (Auto Geo Proximity) on May 19, 2026&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;What if I have more questions?&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Contact Zscaler Support via the “Support” link at the top-right of the Zscaler Administration U.I page.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll-Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 20 May 2026 02:43:11 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 18 May 2026 21:23:18 GMT</pubDate>
                                                            <startTime>Tue, 19 May 2026 22:00:00 GMT</startTime>
            <endTime>Wed, 20 May 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 20 May 2026 02:43:32 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29626 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Reminder Notification for Upcoming New DCs and Expansions - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/29621</link>
                                <description>&lt;p&gt;&lt;span&gt;Dear Customer,&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and as previously announced via&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/zscaler-data-centers.html?version=0&quot;&gt;&lt;span&gt;email notification&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://trust.zscaler.com/zscaler.net/posts/28801&quot;&gt;&lt;span&gt;Trust&amp;nbsp;&lt;/span&gt;&lt;/a&gt;&lt;span&gt;on April 1st, 2026, we would like to remind you of the upcoming New DCs and expansions at the locations listed below. These would be available anytime on or after May 31, 2026&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream access lists to allow the new IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;CIDR&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Montreal I&lt;/td&gt;&lt;td&gt;198.14.104.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Seattle&lt;/td&gt;&lt;td&gt;198.14.106.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Vancouver I&lt;/td&gt;&lt;td&gt;137.31.24.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Vancouver I&lt;/td&gt;&lt;td&gt;137.31.26.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Amsterdam Il&lt;/td&gt;&lt;td&gt;137.31.28.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Amsterdam Il&lt;/td&gt;&lt;td&gt;137.31.30.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Zurich&lt;/td&gt;&lt;td&gt;137.31.20.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Zurich&lt;/td&gt;&lt;td&gt;137.31.22.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Jakarta I&lt;/td&gt;&lt;td&gt;122.10.149.0/24&lt;/td&gt;&lt;td&gt;New RS* data center&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;em&gt;*RS - Regional Surcharge (An additional subscription is required&amp;nbsp; to use these data centers)&lt;/em&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;We recommend that you add the IP address ranges listed in the ‘Zscaler Aggregate IP Address Ranges’ section of the CENR page to your access lists, firewalls, and application allowlists to avoid service disruption.&amp;nbsp; The IPs from these ranges can be put in use by Zscaler for Web and Internet Application communication and dynamic service resolution.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Mon, 18 May 2026 18:47:47 GMT</pubDate>
                                                            <startTime>Mon, 18 May 2026 00:00:00 GMT</startTime>
            <endTime>Sun, 31 May 2026 00:00:00 GMT</endTime>
                                                                                            <Status>Upcoming</Status>
                                                <guid isPermaLink="false">29621 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Melbourne II Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29616</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Melbourne II (MEL2) Data Center.&amp;nbsp; During the maintenance window the services through MEL2 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 21, 7:00 am PDT (May 21, 14:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 21, 2:00 pm PDT (May 21, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Mon, 18 May 2026 16:48:53 GMT</pubDate>
                                                            <startTime>Thu, 21 May 2026 02:00:00 GMT</startTime>
            <endTime>Thu, 21 May 2026 09:00:00 GMT</endTime>
                                                                                            <Status>Upcoming</Status>
                                                <guid isPermaLink="false">29616 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Warsaw II Datacenter Scheduled Maintenance - Service Expansion  - zscaler.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29611</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Warsaw II (WAW2) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 20, 9:00 am PDT (May 20, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 20, 5:00 pm PDT (May 21, 00:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li data-list-item-id=&quot;e814e995031602224196c25bb44ce7eb6&quot;&gt;&lt;span&gt;Update 5/20: Extending Maintenance&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 21 May 2026 05:29:54 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 18 May 2026 16:39:05 GMT</pubDate>
                                                            <startTime>Wed, 20 May 2026 16:00:00 GMT</startTime>
            <endTime>Thu, 21 May 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 21 May 2026 05:30:02 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29611 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Madrid IV (MAD4) Datacenter Network Maintenance - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/29606</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in Madrid IV (MAD4) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window:&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-05-19 18:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp;2026-05-19 21:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-05-19 20:00 - 2026-05-19 23:00 CEST)&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 19 May 2026 21:01:52 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 18 May 2026 14:59:14 GMT</pubDate>
                                                            <startTime>Tue, 19 May 2026 18:00:00 GMT</startTime>
            <endTime>Tue, 19 May 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 19 May 2026 21:01:58 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">29606 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Madrid IV (MAD4) Datacenter Network Maintenance - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29601</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Madrid IV (MAD4) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-05-19 16:00 UTC&lt;br&gt;End: &amp;nbsp;2026-05-19 19:00 UTC&lt;br&gt;(i.e. 2026-05-19 18:00 - 21:00 Local Time)&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 19 May 2026 18:49:58 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 18 May 2026 07:11:59 GMT</pubDate>
                                                            <startTime>Tue, 19 May 2026 16:00:00 GMT</startTime>
            <endTime>Tue, 19 May 2026 19:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 19 May 2026 20:10:22 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter. However, intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">29601 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/29596</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler SRE team will be performing an urgent maintenance on the zdxcloud.net cloud. This maintenance is scheduled for Sunday at 03:15 AM UTC on 17th May, 2026, and can take up to 2 Hours to complete. During this maintenance window the ZDX Admin Portal, including policy management, reporting access, and authentication of new users will not be available. As part of our standard maintenance process all logs will be collected and available after maintenance has completed.&lt;br&gt;&lt;br&gt;We will continue to provide updates here as the investigation progresses. For detailed updates, please check the Service Status section in your &lt;a href=&quot;https://community.zscaler.com/zenith/s/Guides/aSoPJ0000005aMD0AY/how-to-access-customer-support-portal-csp-and-view-the-service-status-section&quot;&gt;Zscaler customer support portal (CSP).&lt;/a&gt; Status changes and additional details will be posted there as they become available.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 17 May 2026 04:07:31 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sun, 17 May 2026 03:00:03 GMT</pubDate>
                                                            <startTime>Sun, 17 May 2026 03:15:00 GMT</startTime>
            <endTime>Sun, 17 May 2026 05:15:00 GMT</endTime>
                                    <ResolvedDate>Sun, 17 May 2026 04:07:36 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29596 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on AMER Region - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/29591</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on AMER Region on the zscaler.net cloud. This maintenance can take up to 3 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete.&amp;nbsp;&lt;br&gt;&lt;br&gt;We will continue to provide updates here as the investigation progresses. For detailed updates, please check the Service Status section in your &lt;a href=&quot;https://community.zscaler.com/zenith/s/Guides/aSoPJ0000005aMD0AY/how-to-access-customer-support-portal-csp-and-view-the-service-status-section&quot;&gt;Zscaler customer support portal (CSP).&lt;/a&gt; Status changes and additional details will be posted there as they become available.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 16 May 2026 09:09:25 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 16 May 2026 05:48:01 GMT</pubDate>
                                                            <startTime>Sat, 16 May 2026 06:00:00 GMT</startTime>
            <endTime>Sat, 16 May 2026 09:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 16 May 2026 09:09:40 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29591 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/29581</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler SRE team will be performing an urgent maintenance on the zdxcloud.net cloud. This maintenance is scheduled for Saturday at 04:40 AM UTC on 16th May, 2026, and can take up to 2 Hours to complete. During this maintenance window the ZDX Admin Portal, including policy management, reporting access, and authentication of new users will not be available. As part of our standard maintenance process all logs will be collected and available after maintenance has completed.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 16 May 2026 05:56:10 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 16 May 2026 04:39:28 GMT</pubDate>
                                                            <startTime>Sat, 16 May 2026 04:40:00 GMT</startTime>
            <endTime>Sat, 16 May 2026 06:40:00 GMT</endTime>
                                    <ResolvedDate>Sat, 16 May 2026 05:56:27 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29581 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Helsinki I Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29576</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Helsinki I (HEL1) Data Center.&amp;nbsp; During the maintenance window the services through HEL1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 22, 9:00 am PDT (May 22, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 22, 2:00 pm PDT (May 22, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Fri, 15 May 2026 18:56:06 GMT</pubDate>
                                                            <startTime>Fri, 22 May 2026 16:00:00 GMT</startTime>
            <endTime>Fri, 22 May 2026 21:00:00 GMT</endTime>
                                                                                            <Status>Upcoming</Status>
                                                <guid isPermaLink="false">29576 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Helsinki I Datacenter Scheduled Maintenance - Service Expansion  - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29571</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Helsinki I (HEL1) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 22, 9:00 am PDT (May 22, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 22, 2:00 pm PDT (May 22, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Fri, 15 May 2026 18:54:27 GMT</pubDate>
                                                            <startTime>Fri, 22 May 2026 16:00:00 GMT</startTime>
            <endTime>Fri, 22 May 2026 21:00:00 GMT</endTime>
                                                                                            <Status>Upcoming</Status>
                                                <guid isPermaLink="false">29571 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Hong Kong III Datacenter Scheduled Maintenance – IPv6 Enablement - zscaler.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29566</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will perform scheduled maintenance at our Hong Kong III (HKG3) Data Center to complete preparatory work for future IPv6 enablement.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;During the maintenance window, services through the HKG3 Data Center may be restarted in phases to minimize impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 20, 9:00 am PDT (May 20, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 20, 4:00 pm PDT (May 20, 23:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 20 May 2026 21:19:17 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 15 May 2026 18:39:20 GMT</pubDate>
                                                            <startTime>Wed, 20 May 2026 16:00:00 GMT</startTime>
            <endTime>Wed, 20 May 2026 23:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 20 May 2026 21:19:29 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29566 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Capetown IV Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29561</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Capetown IV (CPT4) Data Center.&amp;nbsp; During the maintenance window the services through CPT4 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 19, 9:00 am PDT (May 19, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 19, 6:00 pm PDT (May 20, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li data-list-item-id=&quot;ec1fc88a49cd3283428e1005a49d777d0&quot;&gt;&lt;span&gt;Update 5/19: Extending Maintenance&lt;/span&gt;&lt;/li&gt;&lt;li data-list-item-id=&quot;e9ce130b6366f249100c86d88f4191bc5&quot;&gt;&lt;span&gt;Update 5/19: Correcting time&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 20 May 2026 01:08:59 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 15 May 2026 18:10:32 GMT</pubDate>
                                                            <startTime>Tue, 19 May 2026 16:00:00 GMT</startTime>
            <endTime>Wed, 20 May 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 20 May 2026 01:09:11 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29561 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Mexico City I Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29556</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Mexico City I (MEX1) Data Center.&amp;nbsp; During the maintenance window the services through MEX1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 18, 6:00 pm PDT (May 19, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 18, 11:00 pm PDT (May 19, 6:00 UTC)&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Fri, 15 May 2026 17:52:49 GMT</pubDate>
                                                            <startTime>Tue, 19 May 2026 01:00:00 GMT</startTime>
            <endTime>Tue, 19 May 2026 06:00:00 GMT</endTime>
                                                                                            <Status>Postponed</Status>
                                                <guid isPermaLink="false">29556 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance Extended - EMEA Region - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29541</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance of the EMEA region&#039;s datacenters on zscloud.net cloud by 3 hours. During this extended maintenance window the ZIA Admin Portal, including policy management and reporting access, and new user authentication should be successful. As part of our standard maintenance process, all logs will be collected and available after maintenance has been completed.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 15 May 2026 01:25:55 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 14 May 2026 22:53:36 GMT</pubDate>
                                                            <startTime>Thu, 14 May 2026 23:00:00 GMT</startTime>
            <endTime>Fri, 15 May 2026 02:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 15 May 2026 01:26:20 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29541 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zscalerone.net</title>
                <link>https://trust.zscaler.com/posts/29536</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on zscalerone.net cloud. This maintenance is scheduled for Friday at 01:00 AM Pacific Time on May 15, 2026 (Friday, May 15, 2026 08:00 AM UTC), and can take up to 4 hours to complete.&lt;/p&gt;&lt;p&gt;During maintenance, which includes the control plane, the Admin Portal might be temporarily placed into read-only mode, making the following unavailable: configuration changes, new user provisioning, and existing user updates through SCIM, LDAP, and SAML. A brief impact to new user authentication might occur. However, all the logs that are collected during this period will be available after the maintenance ends.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 15 May 2026 10:12:19 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 14 May 2026 19:34:53 GMT</pubDate>
                                                            <startTime>Fri, 15 May 2026 08:00:00 GMT</startTime>
            <endTime>Fri, 15 May 2026 12:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 15 May 2026 10:17:36 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29536 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Chicago I (CHI1) Datacenter Network Maintenance - zscaler.net, zscalerone.net, zscalertwo.net, zscalerthree.net, zpabeta.net</title>
                <link>https://trust.zscaler.com/posts/29521</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in Chicago I (CHI1) Datacenter Datacenter.&lt;/p&gt;&lt;p&gt;Scheduled Maintenance window,&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-05-15 23:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp;2026-05-16 01:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-05-15 18:00 - 2026-05-15 20:00)&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 18 May 2026 05:49:04 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 14 May 2026 05:06:33 GMT</pubDate>
                                                            <startTime>Fri, 15 May 2026 23:00:00 GMT</startTime>
            <endTime>Sat, 16 May 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 18 May 2026 05:49:17 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29521 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/29516</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler SRE team will be performing an urgent maintenance on the zdxcloud.net cloud. This maintenance is scheduled for Thursday at 03:00 AM UTC on 14th May, 2026, and can take up to 2 hour to complete. During this maintenance window the ZDX Admin Portal, including policy management, reporting access, and authentication of new users will not be available. As part of our standard maintenance process all logs will be collected and available after maintenance has completed.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 14 May 2026 04:02:26 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 14 May 2026 02:39:29 GMT</pubDate>
                                                            <startTime>Thu, 14 May 2026 03:00:00 GMT</startTime>
            <endTime>Thu, 14 May 2026 05:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 14 May 2026 04:03:01 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29516 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>London III (LON3) Datacenter Network Maintenance - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/29511</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the London III (LON3) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-05-14 20:30 BST&lt;br&gt;End: &amp;nbsp;2026-05-14 23:30 BST&lt;br&gt;(i.e. 2026-05-14 19:30 - 22:30 UTC)&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 14 May 2026 21:54:47 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 13 May 2026 02:29:28 GMT</pubDate>
                                                            <startTime>Thu, 14 May 2026 19:30:00 GMT</startTime>
            <endTime>Thu, 14 May 2026 22:30:00 GMT</endTime>
                                    <ResolvedDate>Thu, 14 May 2026 21:54:51 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter. However, intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">29511 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Datacenter Maintenance - private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/29506</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler is performing proactive emergency maintenance activity for data centers across Geo regions.&lt;br&gt;Users may observe very brief disconnect and reconnect to ZPA cloud during the maintenance activity.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&amp;nbsp;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 13 May 2026 14:50:30 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 13 May 2026 00:33:13 GMT</pubDate>
                                                            <startTime>Wed, 13 May 2026 00:35:00 GMT</startTime>
            <endTime>Wed, 13 May 2026 05:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 13 May 2026 14:50:39 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29506 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Singapore IV (SIN4) Datacenter Network Maintenance - zscloud.net, zscalerthree.net, zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/29491</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Singapore IV (SIN4) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-05-15 11:00 UTC&lt;br&gt;End: &amp;nbsp;2026-05-15 13:00 UTC&lt;br&gt;(Local Time 2026-05-15 19:00 - 21:00)&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 15 May 2026 11:43:33 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 12 May 2026 08:17:55 GMT</pubDate>
                                                            <startTime>Fri, 15 May 2026 11:00:00 GMT</startTime>
            <endTime>Fri, 15 May 2026 13:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 15 May 2026 11:43:46 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter. However, intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">29491 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Zurich I (ZRH1) Datacenter Network Maintenance - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/29486</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Zurich I (ZRH1) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-05-13 19:00 CEST&lt;br&gt;End: 2026-05-13 23:00 CEST&lt;br&gt;(i.e. 2026-05-13 17:00 - 21:00 UTC)&lt;/p&gt;&lt;p&gt;During this maintenance, traffic will failover to redundant devices in the same datacenter, and we expect no service impact.&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 13 May 2026 23:50:32 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 11 May 2026 19:38:15 GMT</pubDate>
                                                            <startTime>Wed, 13 May 2026 17:00:00 GMT</startTime>
            <endTime>Wed, 13 May 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 13 May 2026 23:50:50 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29486 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Copenhagen II Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29481</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Copenhagen II (CPH2) Data Center.&amp;nbsp; During the maintenance window the services through CPH2 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 15, 9:00 am PDT (May 15, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 15, 4:00 pm PDT (May 15, 23:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li data-list-item-id=&quot;e6ae77c1cbe2b65c27db31fb7d46e3f56&quot;&gt;&lt;span&gt;Update 5/15: Extending Maintenance&lt;/span&gt;&lt;/li&gt;&lt;li data-list-item-id=&quot;e96d0cbacbe5e92e0af034b451368372d&quot;&gt;&lt;span&gt;Update 5/15: Extending Maintenance&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 15 May 2026 22:48:52 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 11 May 2026 18:31:48 GMT</pubDate>
                                                            <startTime>Fri, 15 May 2026 16:00:00 GMT</startTime>
            <endTime>Fri, 15 May 2026 23:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 15 May 2026 22:49:01 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29481 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Dallas II Datacenter Scheduled Maintenance - IPv6 Enablement - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29476</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Dallas II (DFW2) Data Center.&amp;nbsp; During the maintenance window the services through DFW2 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 14, 6:00 pm PDT (May 15, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 14, 11:00 pm PDT (May 15, 6:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 15 May 2026 05:03:21 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 11 May 2026 18:19:06 GMT</pubDate>
                                                            <startTime>Fri, 15 May 2026 01:00:00 GMT</startTime>
            <endTime>Fri, 15 May 2026 06:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 15 May 2026 05:04:08 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29476 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Frankfurt IV Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29471</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Frankfurt IV (FRA4) Data Center.&amp;nbsp; During the maintenance window the services through FRA4 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 13, 9:00 am PDT (May 13, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 13, 4:00 pm PDT (May 13, 23:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 13 May 2026 23:19:31 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 11 May 2026 17:16:19 GMT</pubDate>
                                                            <startTime>Wed, 13 May 2026 16:00:00 GMT</startTime>
            <endTime>Wed, 13 May 2026 23:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 13 May 2026 23:20:34 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29471 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Dallas I Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29466</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Dallas I (DFW1) Data Center.&amp;nbsp; During the maintenance window the services through DFW1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 12, 6:00 pm PDT (May 13, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 12, 12:00 pm PDT (May 13, 7:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 13 May 2026 07:13:20 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 11 May 2026 17:00:59 GMT</pubDate>
                                                            <startTime>Wed, 13 May 2026 01:00:00 GMT</startTime>
            <endTime>Wed, 13 May 2026 07:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 13 May 2026 07:13:35 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29466 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Perth I (PER1) Datacenter Network Maintenance - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/29461</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in Perth I (PER1) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window:&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-05-12 12:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp;2026-05-12 15:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-05-12 20:00 - 2026-05-12 23:00 AWST)&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 12 May 2026 14:00:37 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 11 May 2026 12:09:12 GMT</pubDate>
                                                            <startTime>Tue, 12 May 2026 12:00:00 GMT</startTime>
            <endTime>Tue, 12 May 2026 15:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 12 May 2026 14:00:48 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">29461 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Atlanta III (ATL3) Datacenter Network Maintenance - zscalertwo.net, private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/29456</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be performing hardware maintenance in Atlanta III (ATL3) Datacenter.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;Scheduled Maintenance window,&lt;br&gt;&amp;nbsp; Start: 2026-05-14 02:00 UTC&lt;br&gt;&amp;nbsp; End: &amp;nbsp;2026-05-14 06:00 UTC&lt;br&gt;&amp;nbsp; (Local Time 2026-05-13 22:00 - 2026-05-14 02:00)&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 14 May 2026 04:59:14 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 11 May 2026 06:56:42 GMT</pubDate>
                                                            <startTime>Thu, 14 May 2026 02:00:00 GMT</startTime>
            <endTime>Thu, 14 May 2026 06:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 14 May 2026 04:59:20 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter. However, intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">29456 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>China Premium Access Plus Beijing Datacenter (Beijing V) Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29446</link>
                                <description>&lt;p&gt;&lt;span&gt;Beijing V DC network providers have advised maintenance work as below. During the maintenance window, China Premium Access Plus Services within these data centres may experience intermittent disconnections.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start Time: 2026-05-27 20:00:00 UTC&lt;/span&gt;&lt;br&gt;&lt;span&gt;End Time: 2026-05-27 21:00:00 UTC&lt;/span&gt;&lt;br&gt;&lt;strong&gt;(Datacenter Local Time&amp;nbsp; 2026-05-28 04:00 - 2026-05-28 05:00 China Standard Time (UTC+8:00))&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Reason of Maintenance: Provider advised maintenance.&lt;/span&gt;&lt;br&gt;&lt;span&gt;Impact During Maintenance: Intermittent connectivity might be observed during the maintenance period&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Mon, 11 May 2026 03:50:48 GMT</pubDate>
                                                            <startTime>Wed, 27 May 2026 20:00:00 GMT</startTime>
            <endTime>Wed, 27 May 2026 21:00:00 GMT</endTime>
                                                                                            <Status>Upcoming</Status>
                                                <guid isPermaLink="false">29446 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>China Premium Access Plus Beijing Datacenter (Beijing V) Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29441</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Beijing V DC network providers have advised maintenance work as below. During the maintenance window, China Premium Access Plus Services within these data centres may experience intermittent disconnections.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start Time: 2026-05-14 16:00:00 UTC&lt;/span&gt;&lt;br&gt;&lt;span&gt;End Time: 2026-05-14 17:00:00 UTC&lt;/span&gt;&lt;br&gt;&lt;strong&gt;(Datacenter Local Time&amp;nbsp; 2026-05-15 00:00 - 2026-05-15 01:00 China Standard Time (UTC+8:00))&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Reason of Maintenance: Provider advised maintenance.&lt;/span&gt;&lt;br&gt;&lt;span&gt;Impact During Maintenance: Intermittent connectivity might be observed during the maintenance period&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 14 May 2026 18:00:23 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 11 May 2026 03:48:12 GMT</pubDate>
                                                            <startTime>Thu, 14 May 2026 16:00:00 GMT</startTime>
            <endTime>Thu, 14 May 2026 17:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 14 May 2026 18:00:37 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29441 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/29436</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler SRE team will be performing an urgent maintenance on the zdxcloud.net cloud. This maintenance is scheduled for Sunday at 03:05 AM UTC on 10th May, 2026, and can take up to 1 hour to complete. During this maintenance window the ZDX Admin Portal, including policy management, reporting access, and authentication of new users will not be available. As part of our standard maintenance process all logs will be collected and available after maintenance has completed.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 10 May 2026 04:10:17 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sun, 10 May 2026 02:59:16 GMT</pubDate>
                                                            <startTime>Sun, 10 May 2026 03:05:00 GMT</startTime>
            <endTime>Sun, 10 May 2026 04:05:00 GMT</endTime>
                                    <ResolvedDate>Sun, 10 May 2026 04:10:28 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29436 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/29431</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;The Zscaler SRE team will be performing an urgent maintenance on the zdxcloud.net cloud. This maintenance is scheduled for Saturday at 03:30 AM UTC on 9th May, 2026, and can take up to 1 hour to complete. During this maintenance window the ZDX Admin Portal, including policy management, reporting access, and authentication of new users will not be available. As part of our standard maintenance process all logs will be collected and available after maintenance has completed.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 09 May 2026 04:51:15 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 09 May 2026 03:34:03 GMT</pubDate>
                                                            <startTime>Sat, 09 May 2026 03:30:00 GMT</startTime>
            <endTime>Sat, 09 May 2026 04:30:00 GMT</endTime>
                                    <ResolvedDate>Sat, 09 May 2026 04:51:33 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29431 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>London III (LON3) Datacenter Network Maintenance - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/29426</link>
                                <description>&lt;p&gt;Zscaler will be performing hardware maintenance in the London III (LON3) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-05-12 20:30 BST&lt;br&gt;End: 2026-05-12 23:30 BST&lt;br&gt;(i.e. 2026-05-12 19:30 - 22:30 UTC)&lt;/p&gt;&lt;p&gt;During the maintenance, traffic will failover to redundant devices in the same datacenter. However, intermittent connections and connection reestablishment may be observed.&lt;/p&gt;</description>
                <pubDate>Fri, 08 May 2026 22:46:50 GMT</pubDate>
                                                            <startTime>Tue, 12 May 2026 19:30:00 GMT</startTime>
            <endTime>Tue, 12 May 2026 22:30:00 GMT</endTime>
                                                                                            <Status>Cancelled</Status>
                                                <guid isPermaLink="false">29426 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Atlanta II (ATL2) Datacenter Network Maintenance - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/29421</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Atlanta II (ATL2) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-5-12 03:00 EDT&lt;br&gt;End: 2026-5-12 07:00 EDT&lt;br&gt;(i.e. 2026-5-12 07:00 - 11:00 UTC)&lt;/p&gt;&lt;p&gt;During this maintenance, traffic will failover to redundant devices in the same datacenter, and we expect no service impact.&amp;nbsp;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 12 May 2026 09:33:01 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 08 May 2026 18:56:05 GMT</pubDate>
                                                            <startTime>Tue, 12 May 2026 07:00:00 GMT</startTime>
            <endTime>Tue, 12 May 2026 11:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 12 May 2026 09:33:19 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29421 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Scheduled Maintenance - zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/29411</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler SRE team will be performing an urgent maintenance on the zdxcloud.net cloud. This maintenance is scheduled for Friday at 06:30 AM UTC on 8th May, 2026, and can take up to 30 minutes to complete. During this maintenance window the ZDX Admin Portal, including policy management, reporting access, and authentication of new users will not be available. As part of our standard maintenance process all logs will be collected and available after maintenance has completed.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 08 May 2026 06:59:21 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 08 May 2026 06:08:10 GMT</pubDate>
                                                            <startTime>Fri, 08 May 2026 06:30:00 GMT</startTime>
            <endTime>Fri, 08 May 2026 07:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 08 May 2026 07:00:05 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29411 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Tel Aviv II (TLV2) Datacenter Scheduled Maintenance - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29401</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in Tel Aviv II (TLV2) Datacenter.&lt;/p&gt;&lt;p&gt;New Maintenance window,&lt;br&gt;&amp;nbsp; Start: 2026-05-11 01:00 UTC&lt;br&gt;&amp;nbsp; End: &amp;nbsp;2026-05-11 04:00 UTC&lt;br&gt;&amp;nbsp; (Local Time 2026-05-11 04:00 - 2026-05-11 07:00 Local Time)&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 11 May 2026 03:22:55 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 08 May 2026 03:38:17 GMT</pubDate>
                                                            <startTime>Mon, 11 May 2026 01:00:00 GMT</startTime>
            <endTime>Mon, 11 May 2026 04:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 11 May 2026 03:23:02 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">29401 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Planned Maintenance Activity for ZPA platform service - private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/29381</link>
                                <description>&lt;p class=&quot;p1&quot;&gt;We will be performing planned maintenance on our&amp;nbsp;platform&amp;nbsp;infrastructure in the Prod EMEA region to enhance availability and resiliency. &amp;nbsp;Some customers may witness below impact during this maintenance window:&lt;/p&gt;&lt;ul&gt;&lt;li data-list-item-id=&quot;ea621eda2cdc47e712a203d52b2c1ea2b&quot;&gt;&lt;span class=&quot;s1&quot;&gt;&lt;/span&gt;Momentary disconnect and auto-reconnect of zcc.&lt;/li&gt;&lt;li data-list-item-id=&quot;ed1362dc2a41ae45720b75d2d45294143&quot;&gt;&lt;span class=&quot;s1&quot;&gt;&lt;/span&gt;Any active session will be disconnected and logged under ZPA User Activity logs as “MT_CLOSED_TLS_CONN_GONE_SCIM_USER_MOVED”&lt;/li&gt;&lt;/ul&gt;&lt;p class=&quot;p1&quot;&gt;Important Note: &lt;strong&gt;No action is required from customers &lt;/strong&gt;and this communication is only intended to inform in advance.&lt;/p&gt;&lt;p class=&quot;p1&quot;&gt;Please reach out to support if you have any questions or require further clarification.&lt;/p&gt;</description>
                <pubDate>Thu, 07 May 2026 06:56:36 GMT</pubDate>
                                                            <startTime>Sun, 10 May 2026 02:00:00 GMT</startTime>
            <endTime>Sun, 10 May 2026 05:30:00 GMT</endTime>
                                                            <customerImpact>Users might experience a momentary disconnect-and-reconnect. No action is required from our customers</customerImpact>
                                                  <Status>Cancelled</Status>
                                                <guid isPermaLink="false">29381 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/29371</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the zdxcloud.net cloud. This maintenance is scheduled for Wednesday at 08:00 PM Pacific Time on May 6, 2026 (Thursday, May 7, 2026 03:00 AM UTC), and can take up to 3 hours to complete.&lt;/p&gt;&lt;p&gt;During this maintenance window the ZDX Admin Portal, including policy management, reporting access, and authentication of new users will not be available. As part of our standard maintenance process all logs will be collected and available after maintenance has completed.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;latest-update&quot;&gt;&lt;p class=&quot;zs-update-latest zs-update&quot; id=&quot;resolved-update&quot;&gt;&lt;strong&gt;Latest Update - &lt;/strong&gt;&lt;span class=&quot;report-time&quot;&gt;Thu, 07 May 2026 08:02:18 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;div class=&quot;update-list update-1&quot;&gt;&lt;p class=&quot;zs-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 07 May 2026 06:03:33 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;Zscaler is extending the maintenance by 2 hours.&lt;/p&gt;&lt;/div&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 07 May 2026 08:02:18 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 06 May 2026 18:21:38 GMT</pubDate>
                                                            <startTime>Thu, 07 May 2026 03:00:00 GMT</startTime>
            <endTime>Thu, 07 May 2026 08:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 07 May 2026 08:02:34 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29371 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zscalerone.net</title>
                <link>https://trust.zscaler.com/posts/29361</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on zscalerone.net cloud. This maintenance is scheduled for Thursday at 02:30 PM Pacific Time on May 7, 2026 (Thursday, May 7, 2026 09:30 PM UTC), and can take up to 4 hours to complete.&lt;/p&gt;&lt;p&gt;During maintenance, which includes the control plane, the Admin Portal might be temporarily placed into read-only mode, making the following unavailable: configuration changes, new user provisioning, and existing user updates through SCIM, LDAP, and SAML. A brief impact to new user authentication might occur. However, all the logs that are collected during this period will be available after the maintenance ends.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 08 May 2026 00:13:41 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 05 May 2026 23:19:15 GMT</pubDate>
                                                            <startTime>Thu, 07 May 2026 21:30:00 GMT</startTime>
            <endTime>Fri, 08 May 2026 01:30:00 GMT</endTime>
                                    <ResolvedDate>Fri, 08 May 2026 00:13:52 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29361 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Hong Kong III Datacenter Scheduled Maintenance – IPv6 Enablement - zscaler.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29356</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will perform scheduled maintenance at our Hong Kong III (HKG3) Data Center to complete preparatory work for future IPv6 enablement.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;During the maintenance window, services through the HKG3 Data Center may be restarted in phases to minimize impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 7, 9:00 am PDT (May 7, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 7, 4:00 pm PDT (May 7, 23:00 UTC)&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Tue, 05 May 2026 19:18:01 GMT</pubDate>
                                                            <startTime>Thu, 07 May 2026 16:00:00 GMT</startTime>
            <endTime>Thu, 07 May 2026 23:00:00 GMT</endTime>
                                                                                            <Status>Cancelled</Status>
                                                <guid isPermaLink="false">29356 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance Notification – Zero Trust Browser - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29351</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will perform urgent maintenance for the Zero Trust Browser service to update a required Zscaler Internet Access (ZIA) certificate on zscalerthree.net cloud.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;strong&gt;Maintenance Window:&lt;/strong&gt;&lt;br&gt;&lt;span&gt;May 6, 2026 | 12:00 AM – 02:00 AM UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;strong&gt;Expected Impact:&lt;/strong&gt;&lt;br&gt;&lt;span&gt;Existing Zero Trust Browser sessions will not be affected during this maintenance activity. Customers initiating new Zero Trust Browser sessions during the maintenance window may experience brief and intermittent access issues while the certificate update is being completed.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;strong&gt;Reason for Maintenance:&lt;/strong&gt;&lt;br&gt;&lt;span&gt;This maintenance is required to update the ZIA certificate utilized by the Zero Trust Browser service prior to certificate expiration.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Zscaler will actively monitor the environment throughout the maintenance window to ensure service stability.&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 01:00:41 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 05 May 2026 18:28:19 GMT</pubDate>
                                                            <startTime>Wed, 06 May 2026 00:00:00 GMT</startTime>
            <endTime>Wed, 06 May 2026 02:00:30 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 01:01:43 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29351 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Capetown IV Datacenter Scheduled Maintenance - IPv6 Enablement - zscalerone.net</title>
                <link>https://trust.zscaler.com/posts/29346</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Capetown IV (CPT4) Data Center.&amp;nbsp; During the maintenance window the services through CPT4 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 7, 9:00 am PDT (May 7, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 7, 2:00 pm PDT (May 7, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Tue, 05 May 2026 16:33:59 GMT</pubDate>
                                                            <startTime>Thu, 07 May 2026 16:00:00 GMT</startTime>
            <endTime>Thu, 07 May 2026 21:00:00 GMT</endTime>
                                                                                            <Status>Cancelled</Status>
                                                <guid isPermaLink="false">29346 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Sao Paulo IV Datacenter Scheduled Maintenance - Service Expansion - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/29341</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Sao Paulo IV (SAO4) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 5, 6:00 pm PDT (May 6, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 5, 11:00 pm PDT (May 6, 6:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 06:10:34 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 05 May 2026 00:01:30 GMT</pubDate>
                                                            <startTime>Wed, 06 May 2026 01:00:00 GMT</startTime>
            <endTime>Wed, 06 May 2026 06:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 06:10:40 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29341 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Sao Paulo IV Datacenter Scheduled Maintenance - IPv6 Enablement - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29336</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Sao Paulo IV (SAO4) Data Center.&amp;nbsp; During the maintenance window the services through SAO4 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 5, 6:00 pm PDT (May 6, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 5, 11:00 pm PDT (May 6, 6:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 07:09:06 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 04 May 2026 23:56:06 GMT</pubDate>
                                                            <startTime>Wed, 06 May 2026 01:00:00 GMT</startTime>
            <endTime>Wed, 06 May 2026 06:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 07:09:41 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29336 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Kuala Lumpur II (KUL2) Datacenter Network Maintenance - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/29331</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Kuala Lumpur II (KUL2) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-05-06 04:00 GMT+8&lt;br&gt;End: 2026-05-06 06:00 GMT+8&lt;br&gt;(i.e. 2026-05-06 20:00 - 22:00 UTC)&lt;/p&gt;&lt;p&gt;During this maintenance, traffic will failover to redundant devices in the same datacenter, and we expect no service impact.&amp;nbsp;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 21:11:55 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 04 May 2026 20:54:26 GMT</pubDate>
                                                            <startTime>Wed, 06 May 2026 20:00:00 GMT</startTime>
            <endTime>Wed, 06 May 2026 22:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 21:11:58 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29331 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Kolkata I (CCU1) Datacenter Network Maintenance - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/29326</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Kolkata I (CCU1) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-05-06 01:30 IST&lt;br&gt;End: 2026-05-06 03:30 IST&lt;br&gt;(i.e. 2026-05-06 20:00 - 22:00 UTC)&lt;/p&gt;&lt;p&gt;During this maintenance, traffic will failover to redundant devices in the same datacenter, and we expect no service impact.&amp;nbsp;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 21:11:43 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 04 May 2026 20:51:49 GMT</pubDate>
                                                            <startTime>Wed, 06 May 2026 20:00:00 GMT</startTime>
            <endTime>Wed, 06 May 2026 22:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 21:11:49 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29326 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Tel Aviv II (TLV2) Datacenter Scheduled Maintenance - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29321</link>
                                <description>&lt;p&gt;Zscaler will be performing hardware maintenance in Tel Aviv II (TLV2) Datacenter.&lt;/p&gt;&lt;p&gt;New Maintenance window,&lt;br&gt;&amp;nbsp; Start: 2026-05-05 01:00 UTC&lt;br&gt;&amp;nbsp; End: &amp;nbsp;2026-05-05 04:00 UTC&lt;br&gt;&amp;nbsp; (Local Time 2026-05-05 04:00 - 2026-05-05 07:00 Local Time)&lt;/p&gt;</description>
                <pubDate>Mon, 04 May 2026 01:13:06 GMT</pubDate>
                                                            <startTime>Tue, 05 May 2026 01:00:00 GMT</startTime>
            <endTime>Tue, 05 May 2026 04:00:00 GMT</endTime>
                                                            <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Cancelled</Status>
                                                <guid isPermaLink="false">29321 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>ZPA Logging zone Maintenance - zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/29316</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;We will be performing &lt;strong&gt;maintenance&lt;/strong&gt; activities to add a new Logging Zone in ZPATWO cloud to augment capacity, availability and resiliency. Some customers may witness below impact during this maintenance window:&lt;/p&gt;&lt;ul&gt;&lt;li data-list-item-id=&quot;e9c76fe292452a84ad34a3e66ce2a1c74&quot;&gt;Admin UI dashboards and diagnostics may display incomplete data temporarily.&lt;/li&gt;&lt;li data-list-item-id=&quot;e0a0d326486aae8be6bab9a13fc3bb171&quot;&gt;If alerts are configured for these components, false events may be triggered.&lt;/li&gt;&lt;li data-list-item-id=&quot;e3fec905cc112952bb94558137107995a&quot;&gt;Nanolog enabled customer will see timeouts on the dashboards.&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;Important Note:This maintenance will not impact live traffic. ZCC enrollment and ZPA logins will remain unaffected, and all services will continue to operate normally&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 03 May 2026 18:54:08 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sun, 03 May 2026 14:43:07 GMT</pubDate>
                                                            <startTime>Sun, 03 May 2026 15:00:28 GMT</startTime>
            <endTime>Sun, 03 May 2026 18:00:28 GMT</endTime>
                                    <ResolvedDate>Sun, 03 May 2026 18:54:15 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29316 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Hong Kong III Datacenter Scheduled Maintenance - IPv6 Enablement - zscalertwo.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29311</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Hong Kong III (HKG3) Data Center.&amp;nbsp; During the maintenance window the services through HKG3 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 5, 9:00 am PDT (May 5, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 5, 5:00 pm PDT (May 6, 00:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li data-list-item-id=&quot;e906e65be31a6543242ae8ef04a520d3f&quot;&gt;&lt;span&gt;Update 5/5: Extending Maintenance&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 05:32:00 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 01 May 2026 23:59:32 GMT</pubDate>
                                                            <startTime>Tue, 05 May 2026 16:00:00 GMT</startTime>
            <endTime>Wed, 06 May 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 05:32:28 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29311 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Helsinki I Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29301</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Helsinki I (HEL1) Data Center.&amp;nbsp; During the maintenance window the services through HEL1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 7, 9:00 am PDT (May 7,16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 7, 2:00 pm PDT (May 7, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Fri, 01 May 2026 00:22:07 GMT</pubDate>
                                                            <startTime>Thu, 07 May 2026 16:00:00 GMT</startTime>
            <endTime>Thu, 07 May 2026 21:00:00 GMT</endTime>
                                                                                            <Status>Cancelled</Status>
                                                <guid isPermaLink="false">29301 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Helsinki I Datacenter Scheduled Maintenance - Service Expansion - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29296</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Helsinki I (HEL1) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 7, 9:00 am PDT (May 7, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 7, 2:00 pm PDT (May 7, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Fri, 01 May 2026 00:17:30 GMT</pubDate>
                                                            <startTime>Thu, 07 May 2026 16:00:00 GMT</startTime>
            <endTime>Thu, 07 May 2026 21:00:00 GMT</endTime>
                                                                                            <Status>Cancelled</Status>
                                                <guid isPermaLink="false">29296 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Copenhagen II Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29291</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Copenhagen II (CPH2) Data Center.&amp;nbsp; During the maintenance window the services through CPH2 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 8, 9:00 am PDT (May 8, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 8, 2:00 pm PDT (May 8, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Fri, 01 May 2026 00:05:31 GMT</pubDate>
                                                            <startTime>Fri, 08 May 2026 16:00:00 GMT</startTime>
            <endTime>Fri, 08 May 2026 21:00:00 GMT</endTime>
                                                                                            <Status>Cancelled</Status>
                                                <guid isPermaLink="false">29291 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Capetown IV Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29286</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Capetown IV (CPT4) Data Center.&amp;nbsp; During the maintenance window the services through CPT4 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 7, 9:00 am PDT (May 7, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 7, 2:00 pm PDT (May 7, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Thu, 30 Apr 2026 23:57:20 GMT</pubDate>
                                                            <startTime>Thu, 07 May 2026 16:00:00 GMT</startTime>
            <endTime>Thu, 07 May 2026 21:00:00 GMT</endTime>
                                                                                            <Status>Cancelled</Status>
                                                <guid isPermaLink="false">29286 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Amsterdam II Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29281</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Amsterdam II (AMS2) Data Center.&amp;nbsp; During the maintenance window the services through AMS2 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 6, 10:00 am PDT (May 6, 17:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 6, 4:00 pm PDT (May 6, 23:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li data-list-item-id=&quot;ecc5575f2a93c59625c727f139fcd18fb&quot;&gt;&lt;span&gt;Update 5/6: Extended Maintenance&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 23:13:10 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 30 Apr 2026 23:43:27 GMT</pubDate>
                                                            <startTime>Wed, 06 May 2026 17:00:00 GMT</startTime>
            <endTime>Wed, 06 May 2026 23:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 23:13:22 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29281 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Los Angeles II Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29276</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Los Angeles II (QLA2) Data Center.&amp;nbsp; During the maintenance window the services through QLA2 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 5, 6:00 pm PDT (May 6, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 5, 11:00 pm PDT (May 6, 6:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 05:32:12 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 30 Apr 2026 20:57:13 GMT</pubDate>
                                                            <startTime>Wed, 06 May 2026 01:00:00 GMT</startTime>
            <endTime>Wed, 06 May 2026 06:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 05:34:59 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29276 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Hyderabad I Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29271</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Hyderabad I (HYD1) Data Center.&amp;nbsp; During the maintenance window the services through HYD1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 4, 9:00 am PDT (May 4, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 4, 2:00 pm PDT (May 4, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 04 May 2026 21:14:41 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 30 Apr 2026 20:30:42 GMT</pubDate>
                                                            <startTime>Mon, 04 May 2026 16:00:00 GMT</startTime>
            <endTime>Mon, 04 May 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 04 May 2026 21:14:52 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29271 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Los Angeles I Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29266</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Los Angeles I (QLA1) Data Center.&amp;nbsp; During the maintenance window the services through QLA1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 4, 9:00 pm PDT (May 5, 4:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 5, 3:00 am PDT (May 5, 10:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 05 May 2026 08:12:19 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 30 Apr 2026 20:14:25 GMT</pubDate>
                                                            <startTime>Tue, 05 May 2026 04:00:00 GMT</startTime>
            <endTime>Tue, 05 May 2026 10:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 05 May 2026 08:14:06 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29266 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Manchester I (MAN1) Datacenter Network Maintenance - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/29256</link>
                                <description>&lt;p&gt;Zscaler will be performing hardware maintenance in the Manchester I (MAN1) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-05-06 23:00 BST&lt;br&gt;End: 2026-05-07 03:00 BST&lt;br&gt;(i.e. 2026-05-06 22:00 - 2026-05-07 02:00 UTC)&lt;/p&gt;&lt;p&gt;During the maintenance, traffic will failover to redundant devices in the same datacenter. However, intermittent connections and connection reestablishment may be observed.&lt;/p&gt;</description>
                <pubDate>Thu, 30 Apr 2026 18:00:43 GMT</pubDate>
                                                            <startTime>Wed, 06 May 2026 22:00:00 GMT</startTime>
            <endTime>Thu, 07 May 2026 02:00:00 GMT</endTime>
                                                                                            <Status>Cancelled</Status>
                                                <guid isPermaLink="false">29256 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Hong Kong III Datacenter Scheduled Maintenance – IPv6 Enablement - zscalertwo.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29251</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will perform scheduled maintenance at our Hong Kong III (HKG3) Data Center to complete preparatory work for future IPv6 enablement.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;During the maintenance window, services through the HKG3 Data Center may be restarted in phases to minimize impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 1, 9:00 am PDT (May 1, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 1, 5:00 pm PDT (May 2, 00:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li data-list-item-id=&quot;e5e3b54b452429e4eef5ad666668bc24c&quot;&gt;Update 5/1: Extending maintenance&lt;/li&gt;&lt;li data-list-item-id=&quot;ef58b31eb6c69e42d7d56683b0bcd2814&quot;&gt;Update 5/1: Extending maintenance&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 01 May 2026 23:42:28 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 30 Apr 2026 15:47:09 GMT</pubDate>
                                                            <startTime>Fri, 01 May 2026 16:00:00 GMT</startTime>
            <endTime>Sat, 02 May 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 01 May 2026 23:42:40 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29251 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Tokyo IV Datacenter Scheduled Maintenance - Service Expansion - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29246</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Tokyo IV (TYO4) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 1, 8:00 am PDT (May 1,15:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 1, 2:00 pm PDT (May 1, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 01 May 2026 20:55:15 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 29 Apr 2026 21:36:25 GMT</pubDate>
                                                            <startTime>Fri, 01 May 2026 15:00:00 GMT</startTime>
            <endTime>Fri, 01 May 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 01 May 2026 20:55:21 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29246 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Tokyo V Datacenter Scheduled Maintenance - Service Expansion - zscaler.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29241</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Tokyo V (TYO5) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 1, 8:00 am PDT (May 1,15:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 1, 2:00 pm PDT (May 1, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li data-list-item-id=&quot;ec9259a7848d64f66c7d7e9d1fc75ca9f&quot;&gt;&lt;span&gt;Update 4/29: Corrected time&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 01 May 2026 20:54:42 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 29 Apr 2026 21:28:21 GMT</pubDate>
                                                            <startTime>Fri, 01 May 2026 15:00:00 GMT</startTime>
            <endTime>Fri, 01 May 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 01 May 2026 20:54:50 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29241 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Tokyo V Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29236</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Tokyo V (TYO5) Data Center.&amp;nbsp; During the maintenance window the services through TYO5 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 1, 8:00 pm PDT (May 1,15:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 1, 2:00 pm PDT (May 1, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Wed, 29 Apr 2026 21:22:14 GMT</pubDate>
                                                            <startTime>Fri, 01 May 2026 15:00:00 GMT</startTime>
            <endTime>Fri, 01 May 2026 21:00:00 GMT</endTime>
                                                                                            <Status>Cancelled</Status>
                                                <guid isPermaLink="false">29236 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>New Delhi I Datacenter Scheduled Maintenance - IPv6 Enablement - zscalertwo.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29231</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our New Delhi I (DEL1) Data Center.&amp;nbsp; During the maintenance window the services through DEL1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is May 1, 9:00 am PDT (May 1, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is May 1, 2:00 pm PDT (May 1, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 01 May 2026 20:33:50 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 29 Apr 2026 21:16:23 GMT</pubDate>
                                                            <startTime>Fri, 01 May 2026 16:00:00 GMT</startTime>
            <endTime>Fri, 01 May 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 01 May 2026 20:34:01 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29231 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Datacenter Expansion Kuala Lampur II (KUL2) - private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/29211</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;As part of our regular expansion of capacity, we are adding ZPA Public Service Edge nodes to our new data center in Kuala Lampur II (KUL2).&lt;/p&gt;&lt;p&gt;&lt;span&gt;These would be available anytime on or after May 1, 2026.&lt;/span&gt;&lt;/p&gt;&lt;table border=&quot;1&quot;&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;KUALA LAMPUR II&lt;/td&gt;&lt;td&gt;New DC&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;p&gt;The IP addresses for the DC are part of the already published IP address range.&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules along with any upstream ACL(s) to allow the IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zpatwo.net/zpa&quot;&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/a&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 20:50:44 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 28 Apr 2026 00:36:37 GMT</pubDate>
                                                            <startTime>Fri, 01 May 2026 00:28:56 GMT</startTime>
            <endTime>Fri, 01 May 2026 00:28:56 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 20:50:53 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29211 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Reminder Notification for Upcoming Data Center Expansions - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/29206</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Customer,&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and as previously announced via&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/zscaler-support-new-datacenters-expansions.html?version=0&amp;amp;_gl=1*10ltoag*_gcl_au*ODYzMzk1NjA1LjE3NzU0OTM0MDk.*_ga*NTkxNzY0NzU5LjE3NzI3MzkwMDc.*_ga_10SPJ4YJL9*czE3NzY5Njk0MzEkbzE2MiRnMCR0MTc3Njk2OTQzMiRqNTkkbDAkaDE3NzAxMzUzNTM.&quot;&gt;&lt;span&gt;email notification&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://trust.zscaler.com/zscaler.net/posts/28491&quot;&gt;&lt;span&gt;Trust&amp;nbsp;&lt;/span&gt;&lt;/a&gt;&lt;span&gt;on March 13, 2026, we would like to remind you of the upcoming data center expansions at the locations listed below. These would be effective anytime on or after May 12, 2026.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream access control lists to allow the new IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;CIDR&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;New York IV&lt;/td&gt;&lt;td&gt;198.14.96.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;New York IV&lt;/td&gt;&lt;td&gt;198.14.98.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;New York IV&lt;/td&gt;&lt;td&gt;198.14.100.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;New York IV&lt;/td&gt;&lt;td&gt;198.14.102.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Paris IV&lt;/td&gt;&lt;td&gt;137.31.8.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Paris IV&lt;/td&gt;&lt;td&gt;137.31.10.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Paris II&lt;/td&gt;&lt;td&gt;137.31.12.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;span&gt;We recommend that you add the IP address ranges listed in the “Zscaler Aggregate IP Address Ranges’’ section of the CENR page to your access lists, firewalls, and application allowlists to avoid service disruption. The IPs from these ranges can be put in use by Zscaler for Web and Internet Application communication and dynamic service resolution.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zpatwo.net/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 27 Apr 2026 19:49:11 GMT</pubDate>
                                                            <startTime>Mon, 27 Apr 2026 00:00:00 GMT</startTime>
            <endTime>Tue, 12 May 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 27 Apr 2026 19:42:58 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29206 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Release Upgrade for Zscaler Data Security Posture Management (DSPM) - app.eu.zsdpc.net</title>
                <link>https://trust.zscaler.com/posts/29196</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;Zscaler Data Posture Control (DSPM) Operations team will be performing a planned upgrade activity on April 27th, 2026. These service updates are applied in regional off-peak hours and should not result in any downtime for customers. Please reach out to Customer support for more information about the changes.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 27 Apr 2026 06:16:08 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 27 Apr 2026 04:03:46 GMT</pubDate>
                                                            <startTime>Mon, 27 Apr 2026 04:00:00 GMT</startTime>
            <endTime>Mon, 27 Apr 2026 07:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 27 Apr 2026 06:16:18 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29196 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Release Upgrade for Zscaler Data Security Posture Management (DSPM) - app.zsdpc.net</title>
                <link>https://trust.zscaler.com/posts/29166</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler Data Posture Control (DSPM) Operations team will be performing a planned upgrade activity on April 22nd, 2026. These service updates are applied in regional off-peak hours and should not result in any downtime for customers. Please reach out to Customer support for more information about the changes.&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 22 Apr 2026 06:25:15 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 22 Apr 2026 04:03:36 GMT</pubDate>
                                                            <startTime>Wed, 22 Apr 2026 04:00:00 GMT</startTime>
            <endTime>Wed, 22 Apr 2026 07:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 22 Apr 2026 06:25:23 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29166 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on zdxcloud.net - zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/29156</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;The Zscaler SRE team will be performing an urgent maintenance on the zdxcloud.net cloud. This maintenance is scheduled for Monday at 08:00 AM UTC on April 20, 2026, and can take up to 1 hour to complete. During this maintenance window the ZDX Admin Portal, including policy management, reporting access, and authentication of new users will not be available. As part of our standard maintenance process all logs will be collected and available after maintenance has completed.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 20 Apr 2026 08:53:24 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 20 Apr 2026 07:46:00 GMT</pubDate>
                                                            <startTime>Mon, 20 Apr 2026 08:00:00 GMT</startTime>
            <endTime>Mon, 20 Apr 2026 09:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 20 Apr 2026 08:53:51 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29156 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on zdxcloud.net - zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/29151</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;The Zscaler SRE team will be performing an urgent maintenance on the zdxcloud.net cloud. This maintenance is scheduled for Monday at 03:15 AM UTC on April 20, 2026, and can take up to 1 hour to complete. During this maintenance window the ZDX Admin Portal, including policy management, reporting access, and authentication of new users will not be available. As part of our standard maintenance process all logs will be collected and available after maintenance has completed.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 20 Apr 2026 04:13:09 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 20 Apr 2026 03:06:43 GMT</pubDate>
                                                            <startTime>Mon, 20 Apr 2026 03:15:00 GMT</startTime>
            <endTime>Mon, 20 Apr 2026 04:15:00 GMT</endTime>
                                    <ResolvedDate>Mon, 20 Apr 2026 04:13:22 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29151 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29131</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on zscalerthree.net cloud. This maintenance is scheduled for Saturday at 06:00 AM Pacific Time on April 18, 2026 (Saturday, April 18, 2026 01:00 PM UTC), and can take up to 4 hours to complete.&lt;/p&gt;&lt;p&gt;During maintenance, which includes the control plane, the Admin Portal might be temporarily placed into read-only mode, making the following unavailable: configuration changes, new user provisioning, and existing user updates through SCIM, LDAP, and SAML. A brief impact to new user authentication might occur. However, all the logs that are collected during this period will be available after the maintenance ends.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 18 Apr 2026 16:53:22 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 17 Apr 2026 18:29:20 GMT</pubDate>
                                                            <startTime>Sat, 18 Apr 2026 13:00:00 GMT</startTime>
            <endTime>Sat, 18 Apr 2026 17:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 18 Apr 2026 16:53:55 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29131 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Reminder Notification for Upcoming New DCs and Expansions - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/29126</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Customer,&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and as previously announced via&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/support-notification-upcoming-new-data-centers-and-expansion.html?version=0&quot;&gt;&lt;span&gt;email notification&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://trust.zscaler.com/zscaler.net/posts/28226&quot;&gt;&lt;span&gt;Trust&amp;nbsp;&lt;/span&gt;&lt;/a&gt;&lt;span&gt;on March 3, 2026, we would like to remind you of the upcoming New DCs and expansions at the locations listed below. These would be available anytime on or after May 2, 2026&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream access lists to allow the new IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;CIDR&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Bogota II&lt;/td&gt;&lt;td&gt;205.220.57.0/24&lt;/td&gt;&lt;td&gt;New RS* data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Bogota II&lt;/td&gt;&lt;td&gt;205.220.68.0/24&lt;/td&gt;&lt;td&gt;New RS* data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai II&lt;/td&gt;&lt;td&gt;205.220.122.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai II&lt;/td&gt;&lt;td&gt;205.220.124.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai II&lt;/td&gt;&lt;td&gt;205.220.126.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong IV&lt;/td&gt;&lt;td&gt;175.107.170.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong IV&lt;/td&gt;&lt;td&gt;175.107.172.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong IV&lt;/td&gt;&lt;td&gt;175.107.174.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong IV&lt;/td&gt;&lt;td&gt;175.107.176.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong IV&lt;/td&gt;&lt;td&gt;175.107.178.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong IV&lt;/td&gt;&lt;td&gt;2400:7aa0:2e00::/40&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hyderabad I&lt;/td&gt;&lt;td&gt;101.2.252.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hyderabad I&lt;/td&gt;&lt;td&gt;101.2.254.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Jakarta I&lt;/td&gt;&lt;td&gt;162.128.187.0/24&lt;/td&gt;&lt;td&gt;New RS* data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Shanghai II&lt;/td&gt;&lt;td&gt;116.196.192.0/24&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;159.254.242.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;159.254.244.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;159.254.246.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;159.254.248.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;159.254.250.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;2a03:eec0:3900::/40&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;147.161.174.0/23&lt;/td&gt;&lt;td&gt;Allocation removed from this data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;London III&lt;/td&gt;&lt;td&gt;170.85.60.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;London V&lt;/td&gt;&lt;td&gt;159.254.222.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;London V&lt;/td&gt;&lt;td&gt;159.254.224.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Frankfurt IV&lt;/td&gt;&lt;td&gt;159.254.226.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Frankfurt IV&lt;/td&gt;&lt;td&gt;159.254.228.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Frankfurt IV&lt;/td&gt;&lt;td&gt;159.254.230.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Frankfurt VI&lt;/td&gt;&lt;td&gt;159.254.232.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Frankfurt VI&lt;/td&gt;&lt;td&gt;159.254.234.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Manchester I&lt;/td&gt;&lt;td&gt;159.254.236.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Manchester I&lt;/td&gt;&lt;td&gt;159.254.238.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Marseille I&lt;/td&gt;&lt;td&gt;159.254.252.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;em&gt;*RS - Regional Surcharge (An additional subscription is required&amp;nbsp; to use these data centers)&lt;/em&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;We recommend that you add the IP address ranges listed in the ‘Zscaler Aggregate IP Address Ranges’ section of the CENR page to your access lists, firewalls, and application allowlists to avoid service disruption.&amp;nbsp; The IPs from these ranges can be put in use by Zscaler for Web and Internet Application communication and dynamic service resolution.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zpatwo.net/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 17 Apr 2026 18:09:57 GMT</pubDate>
                                                            <startTime>Fri, 17 Apr 2026 00:00:00 GMT</startTime>
            <endTime>Sat, 02 May 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 17 Apr 2026 18:07:37 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29126 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Scheduled Maintenance - zscalerone.net</title>
                <link>https://trust.zscaler.com/posts/29116</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;Zscaler is performing a service upgrade on Saturday at 6:00 AM PDT on April 18, 2026 (Saturday, April 18, 2026 , 01:00 PM UTC), and is expected to last up to 4 hours.&lt;/span&gt;&lt;br&gt;&lt;span&gt;During this maintenance period, the Zscaler Client Connector Portal will be in maintenance mode. As a result, access to policy management and reporting will not be available. Existing devices that are already enrolled will not be affected, but there may be intermittent failures in registering new devices. Rest assured, all logs will be collected and made available once the maintenance mode window concludes.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 18 Apr 2026 17:11:59 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 17 Apr 2026 08:14:51 GMT</pubDate>
                                                            <startTime>Sat, 18 Apr 2026 13:00:00 GMT</startTime>
            <endTime>Sat, 18 Apr 2026 16:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 18 Apr 2026 17:12:17 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29116 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Helsinki I (HEL1) Datacenter Network Maintenance - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/29111</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Helsinki I (HEL1) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-04-17 21:00 EEST&lt;br&gt;End: 2026-04-18 01:00 EEST&lt;br&gt;(i.e. 2026-04-17 18:00 - 22:00 UTC)&lt;/p&gt;&lt;p&gt;During this maintenance, traffic will failover to redundant devices in the same datacenter, and we expect no service impact.&amp;nbsp;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 17 Apr 2026 20:03:32 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 16 Apr 2026 18:35:24 GMT</pubDate>
                                                            <startTime>Fri, 17 Apr 2026 18:00:00 GMT</startTime>
            <endTime>Fri, 17 Apr 2026 22:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 17 Apr 2026 20:03:37 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29111 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Stockholm III (STO3) Datacenter Network Maintenance - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/29106</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Stockholm III (STO3) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-04-17 20:00 CEST&lt;br&gt;End: 2026-04-18 00:00 CEST&lt;br&gt;(i.e. 2026-04-17 18:00 - 22:00 UTC)&lt;/p&gt;&lt;p&gt;During this maintenance, traffic will failover to redundant devices in the same datacenter, and we expect no service impact.&amp;nbsp;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 17 Apr 2026 20:05:32 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 16 Apr 2026 18:33:41 GMT</pubDate>
                                                            <startTime>Fri, 17 Apr 2026 18:00:00 GMT</startTime>
            <endTime>Fri, 17 Apr 2026 22:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 17 Apr 2026 20:05:43 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29106 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zscalerone.net</title>
                <link>https://trust.zscaler.com/posts/29091</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on zscalerone.net cloud. This maintenance is scheduled for Friday at 01:00 AM Pacific Time on April 17, 2026 (Friday, April 17, 2026 08:00 AM UTC), and can take up to 4 hours to complete.&lt;/p&gt;&lt;p&gt;During maintenance, which includes the control plane, the Admin Portal might be temporarily placed into read-only mode, making the following unavailable: configuration changes, new user provisioning, and existing user updates through SCIM, LDAP, and SAML. A brief impact to new user authentication might occur. However, all the logs that are collected during this period will be available after the maintenance ends.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 17 Apr 2026 09:43:20 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 16 Apr 2026 06:28:38 GMT</pubDate>
                                                            <startTime>Fri, 17 Apr 2026 08:00:00 GMT</startTime>
            <endTime>Fri, 17 Apr 2026 12:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 17 Apr 2026 09:43:28 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29091 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>New Delhi I (DEL1) Datacenter Network Maintenance - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/29081</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the New Delhi I (DEL1) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-04-17 19:30:00 IST&lt;br&gt;End: 2026-04-17 23:30 IST&lt;br&gt;(i.e. 2026-04-17 14:00 - 18:00 UTC)&lt;/p&gt;&lt;p&gt;During the maintenance, traffic will failover to redundant devices in the same datacenter. However, intermittent connections and connection reestablishment may be observed.&lt;/p&gt;&lt;p&gt;[NOTE: EXTENDING MAINTENANCE AN ADDITIONAL TWO HOURS]&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 17 Apr 2026 18:12:50 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 15 Apr 2026 22:48:20 GMT</pubDate>
                                                            <startTime>Fri, 17 Apr 2026 14:00:00 GMT</startTime>
            <endTime>Fri, 17 Apr 2026 18:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 17 Apr 2026 18:12:54 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29081 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Upcoming Data Center Expansion in Zpa - private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/29076</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;As part of our regular expansion of capacity, we are adding additional ZPA Public Service Edge nodes to our existing data center in Chicago II (CHI2) for Zpa cloud.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;These would be available anytime on or after April 15, 2026.&lt;/span&gt;&lt;/p&gt;&lt;table border=&quot;1&quot;&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;AMERICAS&lt;/td&gt;&lt;td&gt;CHICAGO II&lt;/td&gt;&lt;td&gt;Expansion of Existing DC&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;p&gt;The IP addresses for the DC are part of the already published IP address range.&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules along with any upstream ACL(s) to allow the IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/a&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&amp;nbsp;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 27 Apr 2026 19:27:37 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 15 Apr 2026 21:48:46 GMT</pubDate>
                                                            <startTime>Wed, 15 Apr 2026 21:47:06 GMT</startTime>
            <endTime>Wed, 15 Apr 2026 21:47:06 GMT</endTime>
                                    <ResolvedDate>Mon, 27 Apr 2026 19:27:52 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29076 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Upcoming Data Center Expansions in ZpaTwo - zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/29071</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;As part of our regular expansion of capacity, we are adding ZPA Public Service Edge nodes to our new data center in Chicago II (CHI2) for ZpaTwo cloud.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;These would be available anytime on or after April 15, 2026.&lt;/span&gt;&lt;/p&gt;&lt;table border=&quot;1&quot;&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;AMERICAS&lt;/td&gt;&lt;td&gt;CHICAGO II&lt;/td&gt;&lt;td&gt;New DC&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;p&gt;The IP addresses for the DC are part of the already published IP address range.&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules along with any upstream ACL(s) to allow the IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zpatwo.net/zpa&quot;&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/a&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&amp;nbsp;&lt;/div&gt;&lt;p&gt;&lt;br&gt;&amp;nbsp;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 27 Apr 2026 19:28:24 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 15 Apr 2026 21:46:53 GMT</pubDate>
                                                            <startTime>Wed, 15 Apr 2026 21:12:22 GMT</startTime>
            <endTime>Wed, 15 Apr 2026 21:12:22 GMT</endTime>
                                    <ResolvedDate>Mon, 27 Apr 2026 19:28:30 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29071 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Data Center Expansions in ZPATWO - zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/29066</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;We would like to notify you of the &amp;nbsp;public service edge expansions at the locations listed below. These were brought online recently.&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;table border=&quot;1&quot;&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Sydney V&lt;/td&gt;&lt;td&gt;New DC&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Warsaw II&lt;/td&gt;&lt;td&gt;&lt;div&gt;&lt;div&gt;New DC&lt;/div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;p&gt;The IP addresses for these DCs are part of the already published IP address range.&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules along with any upstream ACL(s) to allow the IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zpatwo.net/zpa&quot;&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/a&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 15 Apr 2026 20:52:31 GMT</pubDate>
                                                            <startTime>Wed, 01 Apr 2026 20:50:35 GMT</startTime>
            <endTime>Wed, 15 Apr 2026 20:50:35 GMT</endTime>
                                    <ResolvedDate>Wed, 15 Apr 2026 20:50:37 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29066 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Data Center Expansions in ZPA - private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/29061</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;We would like to notify you of the &amp;nbsp;public service edge expansions at the locations listed below. These were brought online recently.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;table border=&quot;1&quot;&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Sydney V&lt;/td&gt;&lt;td&gt;New DC&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Warsaw II&lt;/td&gt;&lt;td&gt;&lt;div&gt;&lt;div&gt;Expansion of Existing DC&lt;/div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;p&gt;The IP addresses for these DCs are part of the already published IP address range.&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules along with any upstream ACL(s) to allow the IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/a&gt;&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 15 Apr 2026 20:35:16 GMT</pubDate>
                                                            <startTime>Wed, 01 Apr 2026 20:32:01 GMT</startTime>
            <endTime>Wed, 15 Apr 2026 20:32:01 GMT</endTime>
                                    <ResolvedDate>Wed, 15 Apr 2026 20:32:04 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29061 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>New Delhi I (DEL1) Datacenter Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/29056</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in New Delhi I (DEL1) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window:&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-04-20 14:30 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp;2026-04-20 17:30 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-04-20 20:00 - 2026-04-20 23:00 IST)&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 20 Apr 2026 15:15:47 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 15 Apr 2026 17:53:40 GMT</pubDate>
                                                            <startTime>Mon, 20 Apr 2026 14:30:00 GMT</startTime>
            <endTime>Mon, 20 Apr 2026 17:30:00 GMT</endTime>
                                    <ResolvedDate>Mon, 20 Apr 2026 15:16:03 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">29056 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Chennai II (MAA2) Datacenter Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/29051</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in Chennai II (MAA2) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window:&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-04-17 14:30 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp; 2026-04-17 17:30 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-04-17 20:00 - 2026-04-17 23:00 IST)&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 17 Apr 2026 17:04:15 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 15 Apr 2026 17:46:00 GMT</pubDate>
                                                            <startTime>Fri, 17 Apr 2026 14:30:00 GMT</startTime>
            <endTime>Fri, 17 Apr 2026 17:30:00 GMT</endTime>
                                    <ResolvedDate>Fri, 17 Apr 2026 17:04:28 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">29051 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance on AMER region&#039;s Egress NAT nodes - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29041</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing a scheduled maintenance on the AMER region&#039;s Egress NAT nodes on zscalerone.net, zscalertwo.net, zscalerthree.net, zscloud.net and zscaler.net clouds. This maintenance is scheduled for Sunday at 2:00 AM Pacific Time on Apr 19, 2026 (Sunday, Apr 19, 2026 09:00 AM UTC), and can take up to 4 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 19 Apr 2026 10:52:51 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 15 Apr 2026 00:58:23 GMT</pubDate>
                                                            <startTime>Sun, 19 Apr 2026 09:00:00 GMT</startTime>
            <endTime>Sun, 19 Apr 2026 13:00:00 GMT</endTime>
                                    <ResolvedDate>Sun, 19 Apr 2026 10:53:00 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29041 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance on EMEA region&#039;s Egress NAT nodes - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29036</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing a scheduled maintenance on the EMEA region&#039;s Egress NAT nodes on zscalerone.net, zscalertwo.net, zscalerthree.net, zscloud.net and zscaler.net clouds. This maintenance is scheduled for Saturday at 6:00 PM Pacific Time on Apr 18, 2026 (Sunday, Apr 19, 2026 01:00 AM UTC), and can take up to 4 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 19 Apr 2026 03:19:04 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 15 Apr 2026 00:51:46 GMT</pubDate>
                                                            <startTime>Sun, 19 Apr 2026 01:00:00 GMT</startTime>
            <endTime>Sun, 19 Apr 2026 05:00:00 GMT</endTime>
                                    <ResolvedDate>Sun, 19 Apr 2026 03:19:29 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29036 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance on APAC region&#039;s Egress NAT nodes - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29031</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing a scheduled maintenance on the APAC region&#039;s Egress NAT nodes on zscalerone.net, zscalertwo.net, zscalerthree.net, zscloud.net and zscaler.net clouds. This maintenance is scheduled for Saturday at 6:00 AM Pacific Time on Apr 18, 2026 (Saturday, Apr 18, 2026 01:00 PM UTC), and can take up to 4 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 20 Apr 2026 04:20:34 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 15 Apr 2026 00:49:45 GMT</pubDate>
                                                            <startTime>Sat, 18 Apr 2026 13:00:00 GMT</startTime>
            <endTime>Sat, 18 Apr 2026 17:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 20 Apr 2026 04:20:53 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29031 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance on Oceania region&#039;s Egress NAT nodes - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/29026</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing a scheduled maintenance on the Oceania region&#039;s Egress NAT nodes on zscalerone.net, zscalertwo.net, zscalerthree.net, zscloud.net and zscaler.net clouds. This maintenance is scheduled for Saturday at 2:00 AM Pacific Time on Apr 18, 2026 (Saturday, Apr 18, 2026 09:00 AM UTC), and can take up to 4 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 18 Apr 2026 10:00:27 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 15 Apr 2026 00:45:54 GMT</pubDate>
                                                            <startTime>Sat, 18 Apr 2026 09:00:00 GMT</startTime>
            <endTime>Sat, 18 Apr 2026 13:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 18 Apr 2026 10:01:34 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29026 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Brussels (BRU2) Datacenter Network Maintenance - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/29006</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Brussels II (BRU2) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-04-17 21:00 CEST&lt;br&gt;End: 2026-04-17 23:00 CEST&lt;br&gt;(i.e. 2026-04-17 19:00 - 21:00 UTC)&lt;/p&gt;&lt;p&gt;During this maintenance, traffic will failover to redundant devices in the same datacenter, and we expect no service impact.&amp;nbsp;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 17 Apr 2026 20:02:04 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 13 Apr 2026 21:45:00 GMT</pubDate>
                                                            <startTime>Fri, 17 Apr 2026 19:00:00 GMT</startTime>
            <endTime>Fri, 17 Apr 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 17 Apr 2026 20:02:16 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">29006 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Munich I Datacenter Scheduled Maintenance - IPv6 Enablement - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28986</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Munich I (MUC1) Data Center.&amp;nbsp; During the maintenance window the services through MUC1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 14, 1:30 pm PDT (April 14, 20:30 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 14, 6:00 pm PDT (April 15, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 15 Apr 2026 00:58:24 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 10 Apr 2026 23:51:56 GMT</pubDate>
                                                            <startTime>Tue, 14 Apr 2026 20:30:00 GMT</startTime>
            <endTime>Wed, 15 Apr 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 15 Apr 2026 00:58:32 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28986 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance Extended - EMEA Region - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28981</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance of the EMEA region data centers on zscaler.net cloud by 3 hours. During this extended maintenance window the ZIA Admin Portal, including policy management and reporting access, and new user authentication should be successful. As part of our standard maintenance process, all logs will be collected and available after maintenance has been completed.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 11 Apr 2026 01:02:06 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 10 Apr 2026 22:58:38 GMT</pubDate>
                                                            <startTime>Fri, 10 Apr 2026 22:55:41 GMT</startTime>
            <endTime>Fri, 10 Apr 2026 22:55:41 GMT</endTime>
                                    <ResolvedDate>Sat, 11 Apr 2026 01:02:25 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28981 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Atlanta II Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28976</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Atlanta II (ATL2) Data Center.&amp;nbsp; During the maintenance window the services through ATL2 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 16, 6:00 pm PDT (April 17, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 17, 12:00 am PDT (April 17, 10:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 4/17: Extending Maintenance&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 17 Apr 2026 08:40:41 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 10 Apr 2026 21:16:49 GMT</pubDate>
                                                            <startTime>Fri, 17 Apr 2026 01:00:00 GMT</startTime>
            <endTime>Fri, 17 Apr 2026 10:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 17 Apr 2026 08:41:46 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28976 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Auckland II Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28971</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Auckland II (AKL2) Data Center.&amp;nbsp; During the maintenance window the services through AKL2 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 16, 6:00 am PDT (April 16, 13:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 16, 11:00 am PDT (April 16, 18:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 16 Apr 2026 18:01:01 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 10 Apr 2026 21:11:29 GMT</pubDate>
                                                            <startTime>Thu, 16 Apr 2026 13:00:00 GMT</startTime>
            <endTime>Thu, 16 Apr 2026 18:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 16 Apr 2026 18:05:21 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28971 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Boston I Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28966</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Boston I (BOS1) Data Center.&amp;nbsp; During the maintenance window the services through BOS1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 15, 6:00 pm PDT (April 16, 13:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 15, 11:00 pm PDT (April 16, 18:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 16 Apr 2026 02:49:31 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 10 Apr 2026 21:08:41 GMT</pubDate>
                                                            <startTime>Thu, 16 Apr 2026 13:00:00 GMT</startTime>
            <endTime>Thu, 16 Apr 2026 18:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 16 Apr 2026 02:49:49 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28966 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Amsterdam III Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28961</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Amsterdam III (AMS3) Data Center.&amp;nbsp; During the maintenance window the services through AMS3 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 15, 1:30 pm PDT (April 15, 20:30 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 15, 6:30 pm PDT (April 16, 1:30 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 16 Apr 2026 00:11:26 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 10 Apr 2026 21:05:47 GMT</pubDate>
                                                            <startTime>Wed, 15 Apr 2026 20:30:00 GMT</startTime>
            <endTime>Thu, 16 Apr 2026 01:30:00 GMT</endTime>
                                    <ResolvedDate>Thu, 16 Apr 2026 00:11:34 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28961 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Tokyo IV Datacenter Scheduled Maintenance - IPv6 Enablement - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28956</link>
                                <description>&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Tokyo IV (TYO4) Data Center.&amp;nbsp; During the maintenance window the services through TYO4 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 14, 9:00 pm PDT (April 14, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 14, 2:00 pm PDT (April 14, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 4/14: Maintenance postponed&lt;/li&gt;&lt;/ul&gt;</description>
                <pubDate>Fri, 10 Apr 2026 20:58:26 GMT</pubDate>
                                                            <startTime>Tue, 14 Apr 2026 16:00:00 GMT</startTime>
            <endTime>Tue, 14 Apr 2026 21:00:00 GMT</endTime>
                                                                                            <Status>Postponed</Status>
                                                <guid isPermaLink="false">28956 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Denver III (DEN3) Datacenter Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28951</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in Denver III (DEN3) Datacenter .&lt;/p&gt;&lt;p&gt;Maintenance window:&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-04-13 05:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp; 2026-04-13 08:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-04-12 23:00 - 2026-04-13 02:00)&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 13 Apr 2026 06:03:07 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 10 Apr 2026 07:44:02 GMT</pubDate>
                                                            <startTime>Mon, 13 Apr 2026 05:00:00 GMT</startTime>
            <endTime>Mon, 13 Apr 2026 08:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 13 Apr 2026 06:03:18 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28951 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance Extended - EMEA Region - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28946</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance of the EMEA region&#039;s datacenters on zscloud.net cloud by 3 hours. During this extended maintenance window the ZIA Admin Portal, including policy management and reporting access, and new user authentication should be successful. As part of our standard maintenance process, all logs will be collected and available after maintenance has been completed.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 10 Apr 2026 01:49:29 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 09 Apr 2026 23:06:57 GMT</pubDate>
                                                            <startTime>Thu, 09 Apr 2026 23:00:00 GMT</startTime>
            <endTime>Fri, 10 Apr 2026 02:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 10 Apr 2026 01:49:35 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28946 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>China Premium Access Plus Beijing V and Shanghai VI Datacenter Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28936</link>
                                <description>&lt;p&gt;&lt;span&gt;Beijing V and Shanghai VI DC network providers have advised maintenance work as below. During the maintenance window, China Premium Access Plus services within these data centres may experience intermittent disconnections.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start Time: 2026-06-05 16:00:00 UTC&lt;/span&gt;&lt;br&gt;&lt;span&gt;End Time: 2026-06-05 20:00:00 UTC&lt;/span&gt;&lt;br&gt;&lt;strong&gt;(Datacenter Local Time&amp;nbsp; 2026-06-06 00:00 - 2026-06-06 04:00 China Standard Time (UTC+8:00))&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Reason of Maintenance: Provider advised maintenance.&lt;/span&gt;&lt;br&gt;&lt;span&gt;Impact During Maintenance: Intermittent connectivity might be observed during the maintenance period&lt;/span&gt;&lt;/p&gt;</description>
                <pubDate>Thu, 09 Apr 2026 18:50:54 GMT</pubDate>
                                                            <startTime>Fri, 05 Jun 2026 16:00:00 GMT</startTime>
            <endTime>Fri, 05 Jun 2026 20:00:00 GMT</endTime>
                                                                                            <Status>Upcoming</Status>
                                                <guid isPermaLink="false">28936 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zscalerone.net</title>
                <link>https://trust.zscaler.com/posts/28941</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on zscalerone.net cloud. This maintenance is scheduled for Friday at 01:00 AM Pacific Time on April 10, 2026 (Friday, April 10, 2026 08:00 AM UTC), and can take up to 4 hours to complete.&lt;/p&gt;&lt;p&gt;During maintenance, which includes the control plane, the Admin Portal might be temporarily placed into read-only mode, making the following unavailable: configuration changes, new user provisioning, and existing user updates through SCIM, LDAP, and SAML. A brief impact to new user authentication might occur. However, all the logs that are collected during this period will be available after the maintenance ends.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 10 Apr 2026 10:26:12 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 09 Apr 2026 19:17:31 GMT</pubDate>
                                                            <startTime>Fri, 10 Apr 2026 08:00:00 GMT</startTime>
            <endTime>Fri, 10 Apr 2026 12:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 10 Apr 2026 10:27:02 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28941 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/28931</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the zdxcloud.net cloud. This maintenance is scheduled for Thursday at 03:00 PM Pacific Time on April 9, 2026 (Thursday, April 9, 2026 10:00 PM UTC), and can take up to 2 hours to complete.&lt;/p&gt;&lt;p&gt;During this maintenance window the ZDX Admin Portal, including policy management, reporting access, and authentication of new users will not be available. As part of our standard maintenance process all logs will be collected and available after maintenance has completed.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 09 Apr 2026 23:29:01 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 09 Apr 2026 18:26:22 GMT</pubDate>
                                                            <startTime>Thu, 09 Apr 2026 22:00:00 GMT</startTime>
            <endTime>Fri, 10 Apr 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 09 Apr 2026 23:29:10 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28931 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Chicago I (CHI1) Datacenter Network Maintenance - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zdxcloud.net, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/28926</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Chicago I (CHI1) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-4-13 03:00 CDT&lt;br&gt;End: 2026-4-13 05:00 CDT&lt;br&gt;(i.e. 2026-4-13 08:00 - 10:00 UTC)&lt;/p&gt;&lt;p&gt;No service impact is expected during this maintenance.&amp;nbsp;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 13 Apr 2026 08:16:35 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 09 Apr 2026 15:07:26 GMT</pubDate>
                                                            <startTime>Mon, 13 Apr 2026 08:00:00 GMT</startTime>
            <endTime>Mon, 13 Apr 2026 10:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 13 Apr 2026 08:16:41 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28926 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Maintenance Window Updates - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28921</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;Zscaler is updating the maintenance window schedule for Oceania, APAC and AMER regions. The new schedule is effective starting April 23, 2026. Service updates for all regions will be recurring.&lt;/p&gt;&lt;table border=&quot;1&quot;&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;Time (in UTC- Coordinated Universal Time)&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;REGION&lt;/td&gt;&lt;td&gt;MON&lt;/td&gt;&lt;td&gt;TUES&lt;/td&gt;&lt;td&gt;WED&lt;/td&gt;&lt;td&gt;THU&lt;/td&gt;&lt;td&gt;FRI&lt;/td&gt;&lt;td&gt;SAT&lt;/td&gt;&lt;td&gt;SUN&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Oceania&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 11:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 11:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;9:00 AM – 12:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 12:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Asia Pacific&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;4:00 PM – 7:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;1:00 PM - 4:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;3:00 PM – 6:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 11:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;AMER&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;4:00 AM - 7:00 AM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 12:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;All Regions&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;1:00 AM – 3:00 AM&lt;/td&gt;&lt;td&gt;1:00 AM – 3:00 AM&lt;/td&gt;&lt;td&gt;1:00 AM – 3:00 AM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;1:00 AM – 6:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 00:14:10 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;New schedule is in place starting April 23, 2026. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 09 Apr 2026 01:01:00 GMT</pubDate>
                                                            <startTime>Thu, 23 Apr 2026 07:00:00 GMT</startTime>
            <endTime>Thu, 30 Apr 2026 07:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 00:14:20 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28921 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Maintenance Window Updates - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28916</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler is updating the maintenance window schedule for Oceania, APAC and AMER regions. The new schedule is effective starting April 23, 2026. Service updates for all regions will be recurring.&lt;br&gt;&amp;nbsp;&lt;/p&gt;&lt;table border=&quot;1&quot;&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;Time(in UTC- Coordinated Universal Time)&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;REGION&lt;/td&gt;&lt;td&gt;MON&lt;/td&gt;&lt;td&gt;TUES&lt;/td&gt;&lt;td&gt;WED&lt;/td&gt;&lt;td&gt;THU&lt;/td&gt;&lt;td&gt;FRI&lt;/td&gt;&lt;td&gt;SAT&lt;/td&gt;&lt;td&gt;SUN&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Oceania&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 11:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 11:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;9:00 AM – 12:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 12:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Asia Pacific&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;4:00 PM – 7:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;1:00 PM - 4:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;3:00 PM – 6:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 11:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;AMER&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;3:00 AM - 6:00 AM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 12:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;All Regions&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;1:00 AM – 3:00 AM&lt;/td&gt;&lt;td&gt;1:00 AM – 3:00 AM&lt;/td&gt;&lt;td&gt;1:00 AM – 3:00 AM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;1:00 AM – 6:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 00:13:33 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;New schedule is in place starting April 23, 2026. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 09 Apr 2026 00:54:16 GMT</pubDate>
                                                            <startTime>Thu, 23 Apr 2026 07:00:00 GMT</startTime>
            <endTime>Thu, 30 Apr 2026 07:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 00:13:43 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28916 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Maintenance Window Updates - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28911</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;Zscaler is updating the maintenance window schedule for Oceania, EMEA and AMER regions. The new schedule is effective starting April 23, 2026. Service updates for all regions will be recurring.&lt;/p&gt;&lt;table border=&quot;1&quot;&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;Time (in UTC- Coordinated Universal Time)&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;REGION&lt;/td&gt;&lt;td&gt;MON&lt;/td&gt;&lt;td&gt;TUES&lt;/td&gt;&lt;td&gt;WED&lt;/td&gt;&lt;td&gt;THU&lt;/td&gt;&lt;td&gt;FRI&lt;/td&gt;&lt;td&gt;SAT&lt;/td&gt;&lt;td&gt;SUN&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Oceania&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 11:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 11:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;9:00 AM – 12:00 PM&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 12:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Asia Pacific&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;4:00 PM – 7:00 PM&lt;/td&gt;&lt;td&gt;1:00 PM -4:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 PM – 11:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;1:00 AM– 4:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;AMER&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 12:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;All Regions&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;1:00 AM – 3:00 AM&lt;/td&gt;&lt;td&gt;1:00 AM – 3:00 AM&lt;/td&gt;&lt;td&gt;1:00 AM – 3:00 AM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;1:00 AM – 6:00 AM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 00:12:51 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;New schedule is in place starting April 23, 2026. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 09 Apr 2026 00:23:43 GMT</pubDate>
                                                            <startTime>Thu, 23 Apr 2026 07:00:00 GMT</startTime>
            <endTime>Thu, 30 Apr 2026 07:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 00:13:03 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28911 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Maintenance Window Updates - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28906</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;Zscaler is updating the maintenance window schedule for Oceania, APAC, EMEA and AMER regions. The new schedule is effective starting April 23, 2026. Service updates for all regions will be recurring.&lt;/p&gt;&lt;table border=&quot;1&quot;&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;Time (in UTC- Coordinated Universal Time)&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;REGION&lt;/td&gt;&lt;td&gt;MON&lt;/td&gt;&lt;td&gt;TUES&lt;/td&gt;&lt;td&gt;WED&lt;/td&gt;&lt;td&gt;THU&lt;/td&gt;&lt;td&gt;FRI&lt;/td&gt;&lt;td&gt;SAT&lt;/td&gt;&lt;td&gt;SUN&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Oceania&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 11:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 11:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;9:00 AM – 12:00 PM&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM– 12:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;9:00 AM– 12:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Asia Pacific&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;4:00 PM – 7:00 PM&lt;/td&gt;&lt;td&gt;&lt;strong&gt;1:00 PM– 4:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;8:00 PM – 10:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 PM – 11:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;1:00 AM– 4:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;AMER&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 12:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;All Regions&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;1:00 AM – 3:00 AM&lt;/td&gt;&lt;td&gt;1:00 AM – 3:00 AM&lt;/td&gt;&lt;td&gt;1:00 AM – 3:00 AM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;1:00 AM– 6:00 AM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 00:12:03 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;New schedule is in place starting April 23, 2026. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 08 Apr 2026 23:37:25 GMT</pubDate>
                                                            <startTime>Thu, 23 Apr 2026 07:00:00 GMT</startTime>
            <endTime>Thu, 30 Apr 2026 07:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 00:12:16 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28906 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Maintenance Window Updates - zscalerone.net</title>
                <link>https://trust.zscaler.com/posts/28901</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;Zscaler is updating the maintenance window schedule for Oceania, EMEA and AMER regions. The new schedule is effective starting April 23, 2026. Service updates for all regions will be recurring.&lt;/p&gt;&lt;table border=&quot;1&quot;&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;Time(in UTC- Coordinated Universal Time)&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;REGION&lt;/td&gt;&lt;td&gt;MON&lt;/td&gt;&lt;td&gt;TUES&lt;/td&gt;&lt;td&gt;WED&lt;/td&gt;&lt;td&gt;THU&lt;/td&gt;&lt;td&gt;FRI&lt;/td&gt;&lt;td&gt;SAT&lt;/td&gt;&lt;td&gt;SUN&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Oceania&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 11:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 11:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;9:00 AM – 12:00 PM&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 12:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;1:00 AM– 4:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;AMER&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;6:00 AM – 8:00 AM&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;9:00 AM – 12:00 PM&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;div&gt;All Regions&lt;/div&gt;&lt;/td&gt;&lt;td&gt;&lt;div&gt;&amp;nbsp;&lt;/div&gt;&lt;/td&gt;&lt;td&gt;&lt;div&gt;1:00 AM – 3:00 AM&lt;/div&gt;&lt;/td&gt;&lt;td&gt;&lt;div&gt;1:00 AM – 3:00 AM&lt;/div&gt;&lt;/td&gt;&lt;td&gt;&lt;div&gt;1:00 AM – 3:00 AM&lt;/div&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp;11:00 PM – 3:00 AM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;1:00 PM– 4:00 PM&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 06 May 2026 00:10:36 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;New schedule is in place starting April 23, 2026. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 08 Apr 2026 22:46:17 GMT</pubDate>
                                                            <startTime>Thu, 23 Apr 2026 07:00:00 GMT</startTime>
            <endTime>Thu, 30 Apr 2026 07:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 06 May 2026 00:10:51 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28901 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28891</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing a scheduled maintenance on zscaler.net cloud. This maintenance is scheduled for Saturday at 06:00 AM Pacific Time on April 11, 2026 (Saturday, April 11, 2026 01:00 PM UTC), and can take up to 4 hours to complete.&lt;/p&gt;&lt;p&gt;During maintenance, which includes the control plane, the Admin Portal might be temporarily placed into read-only mode, making the following unavailable: configuration changes, new user provisioning, and existing user updates through SCIM, LDAP, and SAML. A brief impact to new user authentication might occur. However, all the logs that are collected during this period will be available after the maintenance ends.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 11 Apr 2026 17:05:20 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 08 Apr 2026 18:19:14 GMT</pubDate>
                                                            <startTime>Sat, 11 Apr 2026 13:00:00 GMT</startTime>
            <endTime>Sat, 11 Apr 2026 17:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 11 Apr 2026 17:06:01 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28891 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Kolkata I (CCU1) Datacenter Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/28881</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in Kolkata I (CCU1) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window:&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-04-14 14:30 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp; 2026-04-14 17:30 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-04-14 20:00 - 2026-04-14 23:00 IST)&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 14 Apr 2026 15:15:25 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 08 Apr 2026 07:24:37 GMT</pubDate>
                                                            <startTime>Tue, 14 Apr 2026 14:30:00 GMT</startTime>
            <endTime>Tue, 14 Apr 2026 17:30:00 GMT</endTime>
                                    <ResolvedDate>Tue, 14 Apr 2026 15:15:40 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28881 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>London V Datacenter Scheduled Maintenance - IPv6 Enablement - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28876</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our London V (LON5) Data Center.&amp;nbsp; During the maintenance window the services through LON5 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 17, 2:00 pm PDT (April 17, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 17, 6:00 pm PDT (April 18, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 4/8: Maintenance Window Updated&lt;/li&gt;&lt;li&gt;Update 4/10: Maintenance rescheduled&lt;br&gt;&amp;nbsp;&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 17 Apr 2026 23:57:43 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 07 Apr 2026 20:56:21 GMT</pubDate>
                                                            <startTime>Fri, 17 Apr 2026 21:00:00 GMT</startTime>
            <endTime>Sat, 18 Apr 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 17 Apr 2026 23:57:52 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28876 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Munich I Datacenter Scheduled Maintenance – IPv6 Enablement - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28866</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will perform scheduled maintenance at our Munich I (MUC1) Data Center to complete preparatory work for future IPv6 enablement. During the maintenance window, services through the MUC1 Data Center may be restarted in phases to minimize impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 7, 1:00 pm PDT (April 7,&amp;nbsp; 20:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 7, 6:00 pm PDT (April 8, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 07 Apr 2026 23:41:56 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 06 Apr 2026 19:24:51 GMT</pubDate>
                                                            <startTime>Tue, 07 Apr 2026 20:00:00 GMT</startTime>
            <endTime>Wed, 08 Apr 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 07 Apr 2026 23:42:19 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28866 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>China Premium Access Plus Beijing V and Shanghai VI Datacenter Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28861</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Beijing V and Shanghai VI DC network providers have advised maintenance work as below. During the maintenance window, China Premium Access Plus services within these data centres may experience intermittent disconnections.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start Time: 2026-04-12 12:00:00 UTC&lt;/span&gt;&lt;br&gt;&lt;span&gt;End Time: 2026-04-12 14:00:00 UTC&lt;/span&gt;&lt;br&gt;&lt;strong&gt;(Datacenter Local Time&amp;nbsp; 2026-04-12 20:00 - 2026-04-12 22:00 China Standard Time (UTC+8:00))&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Reason of Maintenance: Provider advised maintenance.&lt;/span&gt;&lt;br&gt;&lt;span&gt;Impact During Maintenance: Intermittent connectivity might be observed during the maintenance period&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 12 Apr 2026 14:01:31 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 06 Apr 2026 16:46:29 GMT</pubDate>
                                                            <startTime>Sun, 12 Apr 2026 12:00:00 GMT</startTime>
            <endTime>Sun, 12 Apr 2026 14:00:00 GMT</endTime>
                                    <ResolvedDate>Sun, 12 Apr 2026 14:02:02 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28861 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Atlanta III (ATL3) Datacenter Network Maintenance - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28856</link>
                                <description>&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Atlanta III (ATL3) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-4-7 18:00 EST&lt;br&gt;End: 2026-4-7 20:00 EST&lt;br&gt;(i.e. 2026-4-7 22:00 - 2026-4-8 00:00 UTC)&lt;/p&gt;&lt;p&gt;During the maintenance, traffic will failover to redundant devices in the same datacenter. However, intermittent connections and connection reestablishment may be observed.&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 06 Apr 2026 16:13:19 GMT</pubDate>
                                                            <startTime>Tue, 07 Apr 2026 22:00:00 GMT</startTime>
            <endTime>Wed, 08 Apr 2026 00:00:00 GMT</endTime>
                                                                                            <Status>Upcoming</Status>
                                                <guid isPermaLink="false">28856 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on zdxcloud.net - zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/28851</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;The Zscaler SRE team will be performing an urgent maintenance on the zdxcloud.net cloud. This maintenance is scheduled for Sunday at 06:15 AM UTC on April 05, 2026, and can take up to 1 hour to complete. During this maintenance window the ZDX Admin Portal, including policy management, reporting access, and authentication of new users will not be available. As part of our standard maintenance process all logs will be collected and available after maintenance has completed.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 05 Apr 2026 06:33:05 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sun, 05 Apr 2026 06:04:25 GMT</pubDate>
                                                            <startTime>Sun, 05 Apr 2026 06:15:00 GMT</startTime>
            <endTime>Sun, 05 Apr 2026 07:15:00 GMT</endTime>
                                    <ResolvedDate>Sun, 05 Apr 2026 06:33:16 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28851 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net, zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/28831</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance during which access to the Zscaler Management Portal for Partners and ZDX Admin Portal might not be available. This maintenance is scheduled for Saturday at 05:45 AM Pacific Time on April 04, 2026 (Saturday, April 04, 2026 12:45 PM UTC), and can take up to 2 hours to complete. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 04 Apr 2026 13:52:04 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 04 Apr 2026 12:31:26 GMT</pubDate>
                                                            <startTime>Sat, 04 Apr 2026 12:45:00 GMT</startTime>
            <endTime>Sat, 04 Apr 2026 14:45:00 GMT</endTime>
                                    <ResolvedDate>Sat, 04 Apr 2026 13:52:21 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28831 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>London V Datacenter Scheduled Maintenance - Service Expansion - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28826</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our London V (LON5) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 9, 1:00 pm PDT (April 9, 20:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 9, 6:00 pm PDT (April 10, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 10 Apr 2026 00:55:23 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 03 Apr 2026 22:09:50 GMT</pubDate>
                                                            <startTime>Thu, 09 Apr 2026 20:00:00 GMT</startTime>
            <endTime>Fri, 10 Apr 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 10 Apr 2026 00:55:33 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28826 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Montreal I Datacenter Scheduled Maintenance - Service Expansion - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28821</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Montreal I (YMQ1) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 8, 6:00 pm PDT (April 9, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 8, 11:00 pm PDT (April 9, 6:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 09 Apr 2026 04:04:46 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 03 Apr 2026 22:04:38 GMT</pubDate>
                                                            <startTime>Thu, 09 Apr 2026 01:00:00 GMT</startTime>
            <endTime>Thu, 09 Apr 2026 06:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 09 Apr 2026 04:04:53 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28821 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Planned Maintenance Activity for ZPA platform service - private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/28806</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p class=&quot;p1&quot;&gt;We will be performing planned maintenance on our&amp;nbsp;platform&amp;nbsp;infrastructure in the Prod US region to enhance availability and resiliency. &amp;nbsp;Some customers may witness below impact during this maintenance window:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;span class=&quot;s1&quot;&gt;&lt;/span&gt;Momentary disconnect and auto-reconnect of zcc.&lt;/li&gt;&lt;li&gt;&lt;span class=&quot;s1&quot;&gt;&lt;/span&gt;Any active session will be disconnected and logged under ZPA User Activity logs as “MT_CLOSED_TLS_CONN_GONE_SCIM_USER_MOVED”&lt;/li&gt;&lt;/ul&gt;&lt;p class=&quot;p1&quot;&gt;Important Note: &lt;strong&gt;No action is required from customers &lt;/strong&gt;and this communication is only intended to inform in advance.&lt;/p&gt;&lt;p class=&quot;p1&quot;&gt;Please reach out to support if you have any questions or require further clarification.&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 05 Apr 2026 03:06:25 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 02 Apr 2026 07:50:41 GMT</pubDate>
                                                            <startTime>Sun, 05 Apr 2026 02:00:00 GMT</startTime>
            <endTime>Sun, 05 Apr 2026 05:30:00 GMT</endTime>
                                    <ResolvedDate>Sun, 05 Apr 2026 03:06:41 GMT</ResolvedDate>
                                          <customerImpact>Users might experience a momentary disconnect-and-reconnect. No action is required from our customers</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28806 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Upcoming New Data Centers and Expansions - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/28801</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and per email notification sent on&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/zscaler-data-centers.html?version=0&quot;&gt;&lt;span&gt;April 1, 2026&lt;/span&gt;&lt;/a&gt;&lt;span&gt;, we would like to notify you of the upcoming new data centers and expansions at the locations listed below. These would be available anytime on or after May 31, 2026; 60 days or more from the date the first email notification is sent.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists (ACLs) to allow the new IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;CIDR&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Montreal I&lt;/td&gt;&lt;td&gt;198.14.104.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Seattle&lt;/td&gt;&lt;td&gt;198.14.106.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Vancouver I&lt;/td&gt;&lt;td&gt;137.31.24.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Vancouver I&lt;/td&gt;&lt;td&gt;137.31.26.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Amsterdam Il&lt;/td&gt;&lt;td&gt;137.31.28.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Amsterdam Il&lt;/td&gt;&lt;td&gt;137.31.30.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Zurich&lt;/td&gt;&lt;td&gt;137.31.20.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Zurich&lt;/td&gt;&lt;td&gt;137.31.22.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Jakarta I&lt;/td&gt;&lt;td&gt;122.10.149.0/24&lt;/td&gt;&lt;td&gt;New RS* data center&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;em&gt;*RS - Regional Surcharge (An additional subscription is required to use these data centers)&lt;/em&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;We recommend that you add the IP address ranges listed in the ‘Zscaler Aggregate IP Address Ranges’ section of the CENR pages (refer applicable links below) to your access lists, firewalls, and application allow lists to avoid service disruption. The IPs from these ranges can be put in use by Zscaler for Web and Internet Application communication and dynamic service resolution.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zpatwo.net/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 01 Apr 2026 23:02:42 GMT</pubDate>
                                                            <startTime>Sun, 31 May 2026 00:00:00 GMT</startTime>
            <endTime>Sun, 31 May 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 01 Apr 2026 22:47:26 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28801 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28796</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing a scheduled maintenance on zscalerthree.net cloud. This maintenance is scheduled for Saturday at 07:00 AM Pacific Time on April 4, 2026 (Saturday, April 4, 2026 02:00 PM UTC), and can take up to 4 hours to complete.&lt;/p&gt;&lt;p&gt;During maintenance, which includes the control plane, the Admin Portal might be temporarily placed into read-only mode, making the following unavailable: configuration changes, new user provisioning, and existing user updates through SCIM, LDAP, and SAML. A brief impact to new user authentication might occur. However, all the logs that are collected during this period will be available after the maintenance ends.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 04 Apr 2026 17:54:54 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 01 Apr 2026 18:13:17 GMT</pubDate>
                                                            <startTime>Sat, 04 Apr 2026 14:00:00 GMT</startTime>
            <endTime>Sat, 04 Apr 2026 18:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 04 Apr 2026 17:55:18 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28796 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Zurich I Datacenter Scheduled Maintenance - Service Expansion - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28791</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Zurich I (ZRH1) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 2, 1:30 pm PDT (April 2, 20:30 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 2, 4:30 pm PDT (April 2, 23:30 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 02 Apr 2026 23:24:17 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 01 Apr 2026 17:17:16 GMT</pubDate>
                                                            <startTime>Thu, 02 Apr 2026 20:30:00 GMT</startTime>
            <endTime>Thu, 02 Apr 2026 23:30:00 GMT</endTime>
                                    <ResolvedDate>Thu, 02 Apr 2026 23:24:58 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28791 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Montreal I Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28781</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Montreal I (YMQ1) Data Center.&amp;nbsp; During the maintenance window the services through YMQ1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 1, 6:00 pm PDT (April 2, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 1, 11:00 pm PDT (April 2, 6:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 02 Apr 2026 04:19:00 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 01 Apr 2026 00:01:39 GMT</pubDate>
                                                            <startTime>Thu, 02 Apr 2026 01:00:00 GMT</startTime>
            <endTime>Thu, 02 Apr 2026 06:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 02 Apr 2026 04:20:30 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28781 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on Mumbai VI and New Delhi I datacenters - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28766</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the Mumbai VI and New Delhi I datacenters on the zscalerthree.net cloud. This maintenance is scheduled for Monday at 4:30 PM Pacific Time on March 30, 2026 (Monday, March 30, 2026 11:30 PM UTC), and can take up to 2 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 31 Mar 2026 00:18:58 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 30 Mar 2026 23:15:07 GMT</pubDate>
                                                            <startTime>Mon, 30 Mar 2026 23:30:00 GMT</startTime>
            <endTime>Tue, 31 Mar 2026 01:30:00 GMT</endTime>
                                    <ResolvedDate>Tue, 31 Mar 2026 00:19:07 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28766 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Zurich I Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28761</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Zurich I (ZRH1) Data Center.&amp;nbsp; During the maintenance window the services through ZRH1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 9, 1:30 pm PDT (April 9, 20:30 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 9, 7:00 pm PDT (April 10, 2:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/31: Maintenance postponed&lt;/li&gt;&lt;li&gt;Update 4/7: Maintenance rescheduled&lt;/li&gt;&lt;li&gt;Update 4/8: Maintenance window updated&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 10 Apr 2026 01:54:52 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 30 Mar 2026 21:59:16 GMT</pubDate>
                                                            <startTime>Thu, 09 Apr 2026 20:30:00 GMT</startTime>
            <endTime>Fri, 10 Apr 2026 02:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 10 Apr 2026 01:55:21 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28761 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>São Paulo IV (SAO4) Critical Datacenter Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28751</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing critical hardware maintenance in the São Paulo IV (SAO4) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-4-2 18:00 GMT-3&lt;br&gt;End: 2026-4-2 22:00 GMT-3&lt;br&gt;(i.e. 2026-4-2 21:00 - 2026-4-3 01:00 UTC)&lt;/p&gt;&lt;p&gt;During the maintenance, traffic will failover to redundant devices in the same datacenter. However, intermittent connections and connection reestablishment may be observed.&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 02 Apr 2026 23:36:57 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 30 Mar 2026 19:33:18 GMT</pubDate>
                                                            <startTime>Thu, 02 Apr 2026 21:00:00 GMT</startTime>
            <endTime>Fri, 03 Apr 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 02 Apr 2026 23:37:03 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28751 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Reminder Notification For New Data Center and Old CIDR Deprecation - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/28746</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Customer,&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and as previously announced via&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/zscaler-data-centers-cidr-deprecation.html?version=0&amp;amp;_gl=1*12b6ci5*_gcl_au*MjA4ODI4NDM3OS4xNzY3NjM3MzYw*_ga*NTkxNzY0NzU5LjE3NzI3MzkwMDc.*_ga_10SPJ4YJL9*czE3NzQ4OTAwNTMkbzgyJGcxJHQxNzc0ODk2NDYzJGo2MCRsMCRoNzc5NDY4MjQ3&quot;&gt;&lt;span&gt;email notification&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://trust.zscaler.com/zscaler.net/posts/27851&quot;&gt;&lt;span&gt;Trust&amp;nbsp;&lt;/span&gt;&lt;/a&gt;&lt;span&gt;on February 10, 2026,&amp;nbsp;we would like to remind you of the upcoming new data center at the location listed below. This would be available anytime on or after April 11, 2026.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream access lists to allow the new IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;CIDR&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Mexico City II&lt;/td&gt;&lt;td&gt;205.220.94.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Mexico City II&lt;/td&gt;&lt;td&gt;205.220.100.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Mexico City II&lt;/td&gt;&lt;td&gt;205.220.104.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Mexico City II&lt;/td&gt;&lt;td&gt;205.220.106.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Mexico City II&lt;/td&gt;&lt;td&gt;205.220.108.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Mexico City II&lt;/td&gt;&lt;td&gt;205.220.110.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Mexico City II&lt;/td&gt;&lt;td&gt;205.220.112.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Mexico City II&lt;/td&gt;&lt;td&gt;205.220.114.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Mexico City II&lt;/td&gt;&lt;td&gt;205.220.116.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Mexico City II&lt;/td&gt;&lt;td&gt;2605:4300:3a00::/40&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;All&lt;/td&gt;&lt;td&gt;All&lt;/td&gt;&lt;td&gt;199.168.148.0/22*&lt;/td&gt;&lt;td&gt;Deprecated&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;span&gt;*&lt;/span&gt;&lt;em&gt;Applicable only to&amp;nbsp;&lt;/em&gt;&lt;a href=&quot;http://private.zscaler.com&quot;&gt;&lt;em&gt;private.zscaler.com&lt;/em&gt;&lt;/a&gt;&lt;em&gt; cloud&lt;/em&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;You can safely remove the reference to the deprecated IP address range because these addresses are no longer in use.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;We recommend that you add the IP address ranges listed in the ‘Zscaler Aggregate IP Address Ranges’’ section of the CENR page to your access lists, firewalls, and application allowlists to avoid service disruption.&amp;nbsp; The IPs from these ranges can be put in use by Zscaler for Web and Internet Application communication and dynamic service resolution.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zpatwo.net/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 30 Mar 2026 18:59:14 GMT</pubDate>
                                                            <startTime>Mon, 30 Mar 2026 00:00:00 GMT</startTime>
            <endTime>Sat, 11 Apr 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 30 Mar 2026 18:53:25 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28746 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Planned Maintenance Activity for ZPA authentication service - private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/28736</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;We will be performing planned maintenance on our ZPA authentication platform infrastructure to enhance availability and resiliency. Customers may witness authentication issue while login to Admin UI or Public API during this maintenance window.&lt;/p&gt;&lt;p&gt;Important Note: No action is required from customers and this communication is only intended to inform in advance.&lt;/p&gt;&lt;p&gt;Please reach out to support if you have any questions or require further clarification.&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 28 Mar 2026 03:34:33 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 27 Mar 2026 14:29:39 GMT</pubDate>
                                                            <startTime>Sat, 28 Mar 2026 02:00:00 GMT</startTime>
            <endTime>Sat, 28 Mar 2026 05:30:00 GMT</endTime>
                                    <ResolvedDate>Sat, 28 Mar 2026 03:34:46 GMT</ResolvedDate>
                                          <customerImpact>Customers may witness authentication issue during this maintenance window.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28736 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28731</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on zscalertwo.net cloud. This maintenance is scheduled for Thursday at 10:30 PM Pacific Time on March 26, 2026 (Friday, March 27, 2026 05:30 AM UTC), and can take up to 30 minutes to complete.&lt;/p&gt;&lt;p&gt;During the maintenance, the ZIA Admin Portal, and access to policy management will not be available. A brief impact to new user authentication might occur. However, all the logs that are collected during this period will be available after the maintenance ends.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 27 Mar 2026 06:29:20 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 27 Mar 2026 05:20:39 GMT</pubDate>
                                                            <startTime>Fri, 27 Mar 2026 05:30:00 GMT</startTime>
            <endTime>Fri, 27 Mar 2026 06:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 27 Mar 2026 06:29:29 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28731 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>China Premium Access Plus Shanghai Datacenter (Shanghai VI) Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28721</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Shanghai VI DC network providers have advised maintenance work as below. During the maintenance window, China Premium Access Plus services within these data centres may experience intermittent disconnections.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start Time: 2026-04-08 14:00:00 UTC&lt;/span&gt;&lt;br&gt;&lt;span&gt;End Time: 2026-04-08 15:00:00 UTC&lt;/span&gt;&lt;br&gt;&lt;strong&gt;(Datacenter Local Time&amp;nbsp; 2026-04-08 22:00 - 2026-04-08 23:00 China Standard Time (UTC+8:00))&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Reason of Maintenance: Provider advised maintenance.&lt;/span&gt;&lt;br&gt;&lt;span&gt;Impact During Maintenance: Intermittent connectivity might be observed during the maintenance period&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 08 Apr 2026 15:16:09 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 26 Mar 2026 22:07:47 GMT</pubDate>
                                                            <startTime>Wed, 08 Apr 2026 14:00:00 GMT</startTime>
            <endTime>Wed, 08 Apr 2026 15:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 08 Apr 2026 15:16:18 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28721 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Upcoming Extranet Virtual IP Address Announcement - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28716</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and per email notification sent on&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/extranet-virtual-ip-zscloud.net.html?version=0&quot;&gt;&lt;span&gt;March 26, 2026&lt;/span&gt;&lt;/a&gt;&lt;span&gt;,&amp;nbsp;we would like to notify you of the&amp;nbsp;new Virtual IP addresses (VIPs) for the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://help.zscaler.com/zia/about-extranet&quot;&gt;&lt;span&gt;Zscaler Extranet Application Support&lt;/span&gt;&lt;/a&gt;&lt;span&gt; rollout.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;These new Extranet&amp;nbsp; VIPs can be used to terminate IPSec VPN tunnels with Extranet connectivity at the locations listed below. The VIPs will be displayed on the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;Zscaler Config&lt;/span&gt;&lt;/a&gt;&lt;span&gt; page for ease of access and visibility.&amp;nbsp;Users who do not wish to use Zscaler Extranet Application Support will not be impacted by this change.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Extranet VIP Addresses&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Status&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago II (CHI2)&lt;/td&gt;&lt;td&gt;170.85.14.198&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago II (CHI2)&lt;/td&gt;&lt;td&gt;2605:4300:2a10::3b&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Los Angeles II (QLA2)&lt;/td&gt;&lt;td&gt;170.85.230.198&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Los Angeles II (QLA2)&lt;/td&gt;&lt;td&gt;2605:4300:3710::3b&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Montreal I (YMQ1)&lt;/td&gt;&lt;td&gt;165.225.212.65&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Montreal I (YMQ1)&lt;/td&gt;&lt;td&gt;2605:4300:2711::43&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Santiago II (SCL2)&lt;/td&gt;&lt;td&gt;205.220.0.198&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Santiago II (SCL2)&lt;/td&gt;&lt;td&gt;2605:4300:e410::36&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;São Paulo IV (SAO4)&lt;/td&gt;&lt;td&gt;147.161.128.59&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;São Paulo IV (SAO4)&lt;/td&gt;&lt;td&gt;2605:4300:e311::43&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Washington IV (WAS4)&lt;/td&gt;&lt;td&gt;170.85.86.198&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Washington IV (WAS4)&lt;/td&gt;&lt;td&gt;2605:4300:2d10::27&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai III (MAA3)&lt;/td&gt;&lt;td&gt;167.103.70.198&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai III (MAA3)&lt;/td&gt;&lt;td&gt;2400:7aa0:2410::f&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kolkata I (CCU1)&lt;/td&gt;&lt;td&gt;205.220.16.198&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kolkata I (CCU1)&lt;/td&gt;&lt;td&gt;2400:7aa0:2910::36&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kuala Lumpur II (KUL2)&lt;/td&gt;&lt;td&gt;205.220.70.198&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kuala Lumpur II (KUL2)&lt;/td&gt;&lt;td&gt;2400:7aa0:2b10::36&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Mumbai VII (BOM7)&lt;/td&gt;&lt;td&gt;167.103.132.198&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Mumbai VII (BOM7)&lt;/td&gt;&lt;td&gt;2400:7aa0:2610::f&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Singapore V (SIN5)&lt;/td&gt;&lt;td&gt;167.103.60.198&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Singapore V (SIN5)&lt;/td&gt;&lt;td&gt;2400:7aa0:2310::3b&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Sydney V (SYD5)&lt;/td&gt;&lt;td&gt;101.2.224.198&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Sydney V (SYD5)&lt;/td&gt;&lt;td&gt;2400:7aa0:2c10::27&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Amsterdam III (AMS3)&lt;/td&gt;&lt;td&gt;87.58.118.198&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Amsterdam III (AMS3)&lt;/td&gt;&lt;td&gt;2a03:eec0:3410::3b&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Madrid IV (MAD4)&lt;/td&gt;&lt;td&gt;2a03:eec0:3110::3b&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Manchester II (MAN2)&lt;/td&gt;&lt;td&gt;194.9.106.198&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Manchester II (MAN2)&lt;/td&gt;&lt;td&gt;2a03:eec0:2e10::3b&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Tel Aviv II (TLV2)&lt;/td&gt;&lt;td&gt;87.58.78.198&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Tel Aviv II (TLV2)&lt;/td&gt;&lt;td&gt;2a03:eec0:3010::3b&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 26 Mar 2026 21:57:07 GMT</pubDate>
                                                            <startTime>Thu, 26 Mar 2026 00:00:00 GMT</startTime>
            <endTime>Thu, 26 Mar 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 26 Mar 2026 21:55:40 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28716 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Upcoming Extranet Virtual IP Address Announcement - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28711</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and per email notification sent on&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/extranet-virtual-ip-zscalerthree.net.html?version=0&quot;&gt;&lt;span&gt;March 26, 2026&lt;/span&gt;&lt;/a&gt;&lt;span&gt;,&amp;nbsp;we would like to notify you of the&amp;nbsp;new Virtual IP addresses (VIPs) for the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://help.zscaler.com/zia/about-extranet&quot;&gt;&lt;span&gt;Zscaler Extranet Application Support&lt;/span&gt;&lt;/a&gt;&lt;span&gt; rollout.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;These new Extranet VIPs can be used to terminate IPSec VPN tunnels with Extranet connectivity at the locations listed below. The VIPs will be displayed on the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;Zscaler Config&lt;/span&gt;&lt;/a&gt;&lt;span&gt; page for ease of access and visibility.&amp;nbsp;Users who do not wish to use Zscaler Extranet Application Support will not be impacted by this change.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Extranet VIP Addresses&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Status&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago I (CHI1)&lt;/td&gt;&lt;td&gt;165.225.56.39&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago I (CHI1)&lt;/td&gt;&lt;td&gt;165.225.60.35&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago I (CHI1)&lt;/td&gt;&lt;td&gt;2605:4300:1314::71&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago II (CHI2)&lt;/td&gt;&lt;td&gt;170.85.14.134&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago II (CHI2)&lt;/td&gt;&lt;td&gt;2605:4300:2a10::3a&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Los Angeles II (QLA2)&lt;/td&gt;&lt;td&gt;170.85.230.134&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Los Angeles II (QLA2)&lt;/td&gt;&lt;td&gt;2605:4300:3710::3a&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Montreal I (YMQ1)&lt;/td&gt;&lt;td&gt;165.225.212.64&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Montreal I (YMQ1)&lt;/td&gt;&lt;td&gt;2605:4300:2711::42&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Santiago II (SCL2)&lt;/td&gt;&lt;td&gt;205.220.0.134&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Santiago II (SCL2)&lt;/td&gt;&lt;td&gt;2605:4300:e410::2b&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;São Paulo IV (SAO4)&lt;/td&gt;&lt;td&gt;147.161.128.58&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;São Paulo IV (SAO4)&lt;/td&gt;&lt;td&gt;2605:4300:e311::42&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Washington IV (WAS4)&lt;/td&gt;&lt;td&gt;170.85.86.134&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Washington IV (WAS4)&lt;/td&gt;&lt;td&gt;2605:4300:2d10::21&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai III (MAA3)&lt;/td&gt;&lt;td&gt;167.103.70.134&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai III (MAA3)&lt;/td&gt;&lt;td&gt;2400:7aa0:2410::e&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai III (MAA3)&lt;/td&gt;&lt;td&gt;2400:7aa0:2411::36&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kolkata I (CCU1)&lt;/td&gt;&lt;td&gt;205.220.16.134&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kolkata I (CCU1)&lt;/td&gt;&lt;td&gt;2400:7aa0:2910::2b&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kuala Lumpur II (KUL2)&lt;/td&gt;&lt;td&gt;205.220.70.134&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kuala Lumpur II (KUL2)&lt;/td&gt;&lt;td&gt;2400:7aa0:2b10::2b&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Mumbai VI (BOM6)&lt;/td&gt;&lt;td&gt;167.103.186.34&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Mumbai VI (BOM6)&lt;/td&gt;&lt;td&gt;2400:7aa0:1319::32&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Mumbai VII (BOM7)&lt;/td&gt;&lt;td&gt;167.103.132.134&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Mumbai VII (BOM7)&lt;/td&gt;&lt;td&gt;2400:7aa0:2610::e&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Singapore V (SIN5)&lt;/td&gt;&lt;td&gt;167.103.60.134&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Singapore V (SIN5)&lt;/td&gt;&lt;td&gt;2400:7aa0:2310::3a&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Sydney V (SYD5)&lt;/td&gt;&lt;td&gt;101.2.224.134&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Sydney V (SYD5)&lt;/td&gt;&lt;td&gt;2400:7aa0:2c10::21&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Tokyo IV (TYO4)&lt;/td&gt;&lt;td&gt;101.2.202.37&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Tokyo IV (TYO4)&lt;/td&gt;&lt;td&gt;2400:7aa0:1e1a::20&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Amsterdam III (AMS3)&lt;/td&gt;&lt;td&gt;87.58.118.134&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Amsterdam III (AMS3)&lt;/td&gt;&lt;td&gt;2a03:eec0:3410::3a&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Manchester II (MAN2)&lt;/td&gt;&lt;td&gt;194.9.106.134&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Manchester II (MAN2)&lt;/td&gt;&lt;td&gt;2a03:eec0:2e10::3a&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Tel Aviv II (TLV2)&lt;/td&gt;&lt;td&gt;87.58.78.134&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Tel Aviv II (TLV2)&lt;/td&gt;&lt;td&gt;2a03:eec0:3010::3a&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 26 Mar 2026 21:50:49 GMT</pubDate>
                                                            <startTime>Thu, 26 Mar 2026 00:00:00 GMT</startTime>
            <endTime>Thu, 26 Mar 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 26 Mar 2026 21:49:01 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28711 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Upcoming Extranet Virtual IP Address Announcement - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28706</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and per email notification sent on&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/extranet-virtual-ip-zscalertwo.net.html?version=0&quot;&gt;&lt;span&gt;March 26, 2026&lt;/span&gt;&lt;/a&gt;&lt;span&gt;,&amp;nbsp;we would like to notify you of the&amp;nbsp;new Virtual IP addresses (VIPs) for the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://help.zscaler.com/zia/about-extranet&quot;&gt;&lt;span&gt;Zscaler Extranet Application Support&lt;/span&gt;&lt;/a&gt;&lt;span&gt; rollout.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;These new Extranet VIPs can be used to terminate IPSec VPN tunnels with Extranet connectivity at the locations listed below. The VIPs will be displayed on the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;Zscaler Config&lt;/span&gt;&lt;/a&gt;&lt;span&gt; page for ease of access and visibility.&amp;nbsp;Users who do not wish to use Zscaler Extranet Application Support will not be impacted by this change.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Extranet VIP Addresses&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Status&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago I (CHI1)&lt;/td&gt;&lt;td&gt;165.225.56.38&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago I (CHI1)&lt;/td&gt;&lt;td&gt;165.225.60.34&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago I (CHI1)&lt;/td&gt;&lt;td&gt;2605:4300:1313::74&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago I (CHI1)&lt;/td&gt;&lt;td&gt;2605:4300:1314::70&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago II (CHI2)&lt;/td&gt;&lt;td&gt;170.85.14.70&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago II (CHI2)&lt;/td&gt;&lt;td&gt;170.85.15.75&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago II (CHI2)&lt;/td&gt;&lt;td&gt;2605:4300:2a10::39&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago II (CHI2)&lt;/td&gt;&lt;td&gt;2605:4300:2a10::46&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Los Angeles II (QLA2)&lt;/td&gt;&lt;td&gt;170.85.230.70&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Los Angeles II (QLA2)&lt;/td&gt;&lt;td&gt;2605:4300:3710::39&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Montreal I (YMQ1)&lt;/td&gt;&lt;td&gt;2605:4300:2711::41&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Santiago II (SCL2)&lt;/td&gt;&lt;td&gt;205.220.0.70&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Santiago II (SCL2)&lt;/td&gt;&lt;td&gt;2605:4300:e410::20&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;São Paulo IV (SAO4)&lt;/td&gt;&lt;td&gt;147.161.128.57&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;São Paulo IV (SAO4)&lt;/td&gt;&lt;td&gt;2605:4300:e311::41&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Washington IV (WAS4)&lt;/td&gt;&lt;td&gt;170.85.86.70&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Washington IV (WAS4)&lt;/td&gt;&lt;td&gt;2605:4300:2d10::1b&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai III (MAA3)&lt;/td&gt;&lt;td&gt;167.103.70.70&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai III (MAA3)&lt;/td&gt;&lt;td&gt;2400:7aa0:2410::d&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kolkata I (CCU1)&lt;/td&gt;&lt;td&gt;205.220.16.70&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kolkata I (CCU1)&lt;/td&gt;&lt;td&gt;2400:7aa0:2910::20&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kuala Lumpur II (KUL2)&lt;/td&gt;&lt;td&gt;205.220.70.70&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kuala Lumpur II (KUL2)&lt;/td&gt;&lt;td&gt;2400:7aa0:2b10::20&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Mumbai VII (BOM7)&lt;/td&gt;&lt;td&gt;167.103.132.70&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Mumbai VII (BOM7)&lt;/td&gt;&lt;td&gt;2400:7aa0:2610::d&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Singapore V (SIN5)&lt;/td&gt;&lt;td&gt;167.103.60.70&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Singapore V (SIN5)&lt;/td&gt;&lt;td&gt;2400:7aa0:2310::39&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Sydney V (SYD5)&lt;/td&gt;&lt;td&gt;101.2.224.70&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Sydney V (SYD5)&lt;/td&gt;&lt;td&gt;2400:7aa0:2c10::1b&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Amsterdam III (AMS3)&lt;/td&gt;&lt;td&gt;87.58.118.70&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Amsterdam III (AMS3)&lt;/td&gt;&lt;td&gt;2a03:eec0:3410::39&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Madrid IV (MAD4)&lt;/td&gt;&lt;td&gt;2a03:eec0:3110::39&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Manchester II (MAN2)&lt;/td&gt;&lt;td&gt;194.9.106.70&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Manchester II (MAN2)&lt;/td&gt;&lt;td&gt;2a03:eec0:2e10::39&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Tel Aviv II (TLV2)&lt;/td&gt;&lt;td&gt;87.58.78.70&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Tel Aviv II (TLV2)&lt;/td&gt;&lt;td&gt;2a03:eec0:3010::39&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 26 Mar 2026 21:46:00 GMT</pubDate>
                                                            <startTime>Thu, 26 Mar 2026 00:00:00 GMT</startTime>
            <endTime>Thu, 26 Mar 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 26 Mar 2026 21:43:16 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28706 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Upcoming Extranet Virtual IP Address Announcement - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28701</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and per email notification sent on&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/extranet-virtual-ip-zscaler.net.html?version=0&quot;&gt;&lt;span&gt;March 26, 2026&lt;/span&gt;&lt;/a&gt;&lt;span&gt;,&amp;nbsp;we would like to notify you of the&amp;nbsp;new Virtual IP addresses (VIPs) for the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://help.zscaler.com/zia/about-extranet&quot;&gt;&lt;span&gt;Zscaler Extranet Application Support&lt;/span&gt;&lt;/a&gt;&lt;span&gt; rollout.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;These new Extranet VIPs addresses can be used to terminate IPSec VPN tunnels with Extranet connectivity at the locations listed below. The VIPs will be displayed on the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;Zscaler Config&lt;/span&gt;&lt;/a&gt;&lt;span&gt; page for ease of access and visibility.&amp;nbsp;Users who do not wish to use Zscaler Extranet Application Support will not be impacted by this change.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Extranet VIP Addresses&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Status&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago II (CHI2)&lt;/td&gt;&lt;td&gt;170.85.14.25&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Chicago II (CHI2)&lt;/td&gt;&lt;td&gt;2605:4300:2a10::38&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Los Angeles II (QLA2)&lt;/td&gt;&lt;td&gt;2605:4300:3710::38&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Los Angeles II (QLA2)&lt;/td&gt;&lt;td&gt;170.85.230.25&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Montreal I (YMQ1)&lt;/td&gt;&lt;td&gt;165.225.212.62&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Montreal I (YMQ1)&lt;/td&gt;&lt;td&gt;2605:4300:2711::40&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Santiago II (SCL2)&lt;/td&gt;&lt;td&gt;205.220.0.25&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Santiago II (SCL2)&lt;/td&gt;&lt;td&gt;2605:4300:e410::15&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;São Paulo IV (SAO4)&lt;/td&gt;&lt;td&gt;147.161.128.56&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;São Paulo IV (SAO4)&lt;/td&gt;&lt;td&gt;2605:4300:e311::40&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Washington IV (WAS4)&lt;/td&gt;&lt;td&gt;170.85.86.25&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Washington IV (WAS4)&lt;/td&gt;&lt;td&gt;2605:4300:2d10::15&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai III (MAA3)&lt;/td&gt;&lt;td&gt;167.103.70.25&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai III (MAA3)&lt;/td&gt;&lt;td&gt;2400:7aa0:2410::c&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kolkata I (CCU1)&lt;/td&gt;&lt;td&gt;205.220.16.25&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kolkata I (CCU1)&lt;/td&gt;&lt;td&gt;2400:7aa0:2910::15&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kuala Lumpur II (KUL2)&lt;/td&gt;&lt;td&gt;205.220.70.25&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Kuala Lumpur II (KUL2)&lt;/td&gt;&lt;td&gt;2400:7aa0:2b10::15&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Mumbai VII (BOM7)&lt;/td&gt;&lt;td&gt;167.103.132.25&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Mumbai VII (BOM7)&lt;/td&gt;&lt;td&gt;2400:7aa0:2610::c&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Singapore V (SIN5)&lt;/td&gt;&lt;td&gt;167.103.60.25&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Singapore V (SIN5)&lt;/td&gt;&lt;td&gt;2400:7aa0:2310::38&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Sydney V (SYD5)&lt;/td&gt;&lt;td&gt;101.2.224.25&lt;/td&gt;&lt;td&gt;Live&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Sydney V (SYD5)&lt;/td&gt;&lt;td&gt;2400:7aa0:2c10::15&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Amsterdam III (AMS3)&lt;/td&gt;&lt;td&gt;87.58.118.25&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Amsterdam III (AMS3)&lt;/td&gt;&lt;td&gt;2a03:eec0:3410::38&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Manchester II (MAN2)&lt;/td&gt;&lt;td&gt;194.9.106.25&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Manchester II (MAN2)&lt;/td&gt;&lt;td&gt;2a03:eec0:2e10::38&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Tel Aviv II (TLV2)&lt;/td&gt;&lt;td&gt;87.58.78.25&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Tel Aviv II (TLV2)&lt;/td&gt;&lt;td&gt;2a03:eec0:3010::38&lt;/td&gt;&lt;td&gt;Future Use&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 26 Mar 2026 21:41:32 GMT</pubDate>
                                                            <startTime>Thu, 26 Mar 2026 00:00:00 GMT</startTime>
            <endTime>Thu, 26 Mar 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 26 Mar 2026 21:37:40 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28701 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Frankfurt VI Datacenter Scheduled Maintenance - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28691</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Frankfurt VI (FRA6) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 27, 3:00 pm PDT (March 27, 22:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is&amp;nbsp; March 27, 10:00 pm PDT (March 28, 5:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/17: Extended maintenance&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 28 Mar 2026 05:24:45 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 26 Mar 2026 19:02:37 GMT</pubDate>
                                                            <startTime>Fri, 27 Mar 2026 22:00:00 GMT</startTime>
            <endTime>Sat, 28 Mar 2026 05:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 28 Mar 2026 05:25:03 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28691 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Planned Maintenance Activity for ZPA platform service - private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/28686</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p class=&quot;p1&quot;&gt;We will be performing planned maintenance on our&amp;nbsp;platform&amp;nbsp;infrastructure in the Prod US region to enhance availability and resiliency. &amp;nbsp;Some customers may witness below impact during this maintenance window:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;span class=&quot;s1&quot;&gt;&lt;/span&gt;Momentary disconnect and auto-reconnect of zcc.&lt;/li&gt;&lt;li&gt;&lt;span class=&quot;s1&quot;&gt;&lt;/span&gt;Any active session will be disconnected and logged under ZPA User Activity logs as “MT_CLOSED_TLS_CONN_GONE_SCIM_USER_MOVED”&lt;/li&gt;&lt;/ul&gt;&lt;p class=&quot;p1&quot;&gt;Important Note: &lt;strong&gt;No action is required from customers &lt;/strong&gt;and this communication is only intended to inform in advance.&lt;/p&gt;&lt;p class=&quot;p1&quot;&gt;Please reach out to support if you have any questions or require further clarification.&lt;/p&gt;&lt;p class=&quot;p1&quot;&gt;&lt;strong&gt;Maintenance Window&lt;/strong&gt;&lt;/p&gt;&lt;p class=&quot;p1&quot;&gt;&lt;span&gt;02:00 - 05:30 UTC&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;p1&quot;&gt;&lt;span&gt;15:00 - 19:00 UTC&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 29 Mar 2026 15:58:42 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 26 Mar 2026 07:49:39 GMT</pubDate>
                                                            <startTime>Sun, 29 Mar 2026 02:00:00 GMT</startTime>
            <endTime>Sun, 29 Mar 2026 19:00:00 GMT</endTime>
                                    <ResolvedDate>Sun, 29 Mar 2026 15:59:44 GMT</ResolvedDate>
                                          <customerImpact>Users might experience a momentary disconnect-and-reconnect. No action is required from our customers</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28686 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Oslo III (OSL3) Datacenter Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/28671</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Oslo III (OSL3) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-03-25 13:00 CEST&lt;br&gt;End: 2026-03-25 16:00 CEST&lt;br&gt;(i.e. 2026-03-25 12:00 - 2026-03-25 15:00 UTC)&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 25 Mar 2026 13:58:57 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 25 Mar 2026 10:53:54 GMT</pubDate>
                                                            <startTime>Wed, 25 Mar 2026 12:00:00 GMT</startTime>
            <endTime>Wed, 25 Mar 2026 15:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 25 Mar 2026 13:59:17 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter and we expect no service impact. </customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28671 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Mumbai VI (BOM6) Datacenter Network Maintenance - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28666</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in Mumbai VI (BOM6) Datacenter .&lt;/p&gt;&lt;p&gt;Maintenance window:&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-03-27 12:30 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp; 2026-03-27 14:30 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-03-27 18:00 - 2026-03-27 20:00 IST)&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 27 Mar 2026 19:23:52 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed at 2026-03-27 14:30 UTC. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 25 Mar 2026 09:07:23 GMT</pubDate>
                                                            <startTime>Fri, 27 Mar 2026 12:30:00 GMT</startTime>
            <endTime>Fri, 27 Mar 2026 14:30:00 GMT</endTime>
                                    <ResolvedDate>Fri, 27 Mar 2026 19:24:57 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28666 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Los Angeles I Datacenter Scheduled Maintenance - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28661</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in Los Angeles I (QLA1) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window:&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-03-26 02:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp; 2026-03-26 04:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-03-25 19:00 - 2026-03-25 &amp;nbsp;21:00)&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 26 Mar 2026 03:59:14 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 25 Mar 2026 07:26:12 GMT</pubDate>
                                                            <startTime>Thu, 26 Mar 2026 02:00:00 GMT</startTime>
            <endTime>Thu, 26 Mar 2026 04:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 26 Mar 2026 03:59:21 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28661 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Reminder Notification for Upcoming Data Center Expansion - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/28656</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Customer,&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and as previously announced via&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/zscaler-notification-data-center-expansions.html?version=0&amp;amp;_gl=1*6vl3o4*_gcl_au*MjA4ODI4NDM3OS4xNzY3NjM3MzYw*_ga*NTkxNzY0NzU5LjE3NzI3MzkwMDc.*_ga_10SPJ4YJL9*czE3NzQyOTAwNjYkbzYyJGcxJHQxNzc0MjkxNjI5JGo0NyRsMCRoMTk5OTAyMTg5&quot;&gt;&lt;span&gt;email notification&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://trust.zscaler.com/zscaler.net/posts/27731&quot;&gt;&lt;span&gt;Trust&amp;nbsp;&lt;/span&gt;&lt;/a&gt;&lt;span&gt;on February 4, 2026, we would like to remind you of the upcoming data center expansion at the location listed below. These would be effective anytime on or after April 5, 2026.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream access control lists to allow the new IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;CIDR&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Mumbai VI&lt;/td&gt;&lt;td&gt;101.2.248.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing DC&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;span&gt;We recommend that you add the IP address ranges listed in the “Zscaler Aggregate IP Address Ranges’’ section of the CENR page to your access lists, firewalls, and application allowlists to avoid service disruption. The IPs from these ranges can be put in use by Zscaler for Web and Internet Application communication and dynamic service resolution.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zpatwo.net/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 23 Mar 2026 19:14:53 GMT</pubDate>
                                                            <startTime>Mon, 23 Mar 2026 00:00:00 GMT</startTime>
            <endTime>Sun, 05 Apr 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 23 Mar 2026 19:11:57 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28656 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Reminder Notification for Additions of HUB IP Address Ranges - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net, zdxcloud.net</title>
                <link>https://trust.zscaler.com/posts/28651</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Customer,&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and as previously announced via&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://trust.zscaler.com/zscaler.net/posts/27726&quot;&gt;&lt;span&gt;Trust&amp;nbsp;&lt;/span&gt;&lt;/a&gt;&lt;span&gt;and&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/zscaler-support-notification-changes-to-hub-ip-address-ranges.html?version=0&amp;amp;_gl=1*l47i5z*_gcl_au*MjA4ODI4NDM3OS4xNzY3NjM3MzYw*_ga*NTkxNzY0NzU5LjE3NzI3MzkwMDc.*_ga_10SPJ4YJL9*czE3NzQyOTAwNjYkbzYyJGcxJHQxNzc0MjkwNzc1JGo2MCRsMCRoMTk5OTAyMTg5&quot;&gt;&lt;span&gt;email notification&lt;/span&gt;&lt;/a&gt;&lt;span&gt; sent on February 4, 2026,&amp;nbsp;we would like to remind you of the upcoming changes to HUB IP address ranges as listed below. The services through the new IP address range will be available anytime on or after April 5, 2026.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;CIDR&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;205.220.118.0/23&lt;/td&gt;&lt;td&gt;New addition to&amp;nbsp;&lt;em&gt;Required&lt;/em&gt; Hub IP addresses&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;101.2.244.0/23&lt;/td&gt;&lt;td&gt;New addition to&amp;nbsp;&lt;em&gt;Required&lt;/em&gt; Hub IP addresses&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;199.168.148.0/22&lt;/td&gt;&lt;td&gt;Removed from&amp;nbsp;&lt;em&gt;Recommended&lt;/em&gt; section&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream access control lists to allow the new IP address range to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/hubs&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/hubs&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/hubs&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/hubs&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerone.net/hubs&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerone.net/hubs&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/hubs&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/hubs&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/hubs&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/hubs&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zdxcloud.net/hubs&quot;&gt;&lt;span&gt;https://config.zscaler.com/zdxcloud.net/hubs&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 23 Mar 2026 19:04:32 GMT</pubDate>
                                                            <startTime>Mon, 23 Mar 2026 00:00:00 GMT</startTime>
            <endTime>Sun, 05 Apr 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 23 Mar 2026 18:56:31 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28651 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>San Francisco IV (SJC4) Datacenter Network Maintenance - zscalertwo.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28631</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in San Francisco IV (SJC4) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window:&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: &amp;nbsp;2026-03-25 03:30 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp; &amp;nbsp;2026-03-25 06:30 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-03-24 20:30 - 2026-03-24 23:30)&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 25 Mar 2026 04:00:53 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 23 Mar 2026 02:12:24 GMT</pubDate>
                                                            <startTime>Wed, 25 Mar 2026 03:30:00 GMT</startTime>
            <endTime>Wed, 25 Mar 2026 18:30:00 GMT</endTime>
                                    <ResolvedDate>Wed, 25 Mar 2026 04:01:01 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28631 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Rio de Janeiro I Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28611</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Rio de Janeiro I (RIO1) Data Center.&amp;nbsp; During the maintenance window the services through RIO1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 31, 2:00 pm PDT (March 31, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 31, 800 pm PDT (April 1, 3:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/23: Maintenance Postponed&lt;/li&gt;&lt;li&gt;Update 3/30: Maintenance Rescheduled&lt;/li&gt;&lt;li&gt;Update 3/31: Extended time&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 01 Apr 2026 03:03:29 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 20 Mar 2026 18:55:07 GMT</pubDate>
                                                            <startTime>Tue, 31 Mar 2026 21:00:00 GMT</startTime>
            <endTime>Wed, 01 Apr 2026 03:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 01 Apr 2026 03:03:44 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28611 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Atlanta III Datacenter Scheduled Maintenance - IPv6 Enablement - zscaler.net, zscalertwo.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28606</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Atlanta III (ATL3) Data Center.&amp;nbsp; During the maintenance window the services through ATL3 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 6, 6:00 pm PDT (April 7, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 6, 11:00 pm PDT (April 7, 6:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/23: Maintenance Postponed&lt;/li&gt;&lt;li&gt;Update 4/3: Maintenance Rescheduled&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 07 Apr 2026 04:51:45 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 20 Mar 2026 18:46:13 GMT</pubDate>
                                                            <startTime>Tue, 07 Apr 2026 01:00:00 GMT</startTime>
            <endTime>Tue, 07 Apr 2026 06:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 07 Apr 2026 04:52:06 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28606 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28601</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the Atlanta II, Atlanta III, Los Angeles, Los Angeles II datacenter on the zscaler.net cloud. This maintenance can take up to 2 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 20 Mar 2026 18:06:31 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 20 Mar 2026 16:44:11 GMT</pubDate>
                                                            <startTime>Fri, 20 Mar 2026 17:00:00 GMT</startTime>
            <endTime>Fri, 20 Mar 2026 19:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 20 Mar 2026 18:06:40 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28601 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on Dusseldorf 1 and Frankfurt 6 datacenters - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28596</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the Dusseldorf 1 and Frankfurt 6 datacenters on the zscaler.net cloud. This maintenance is scheduled for Thursday at 11:30 PM Pacific Time on March 19, 2026 (Friday, March 20, 2026 6:30 AM UTC), and can take up to 1 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 20 Mar 2026 07:45:21 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 20 Mar 2026 06:15:54 GMT</pubDate>
                                                            <startTime>Fri, 20 Mar 2026 06:30:00 GMT</startTime>
            <endTime>Fri, 20 Mar 2026 07:45:00 GMT</endTime>
                                    <ResolvedDate>Fri, 20 Mar 2026 07:45:45 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28596 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - AMER Region - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28591</link>
                                <description>&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the AMER region&#039;s datacenters of zscalertwo.net cloud. This maintenance is scheduled for Thursday at 9:00 PM Pacific Time on Mar 19, 2026 (Friday, Mar 20, 2026 4:00 AM UTC), and can take up to 3 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 20 Mar 2026 00:27:58 GMT</pubDate>
                                                            <startTime>Fri, 20 Mar 2026 04:00:00 GMT</startTime>
            <endTime>Fri, 20 Mar 2026 07:00:00 GMT</endTime>
                                                                                            <Status>Upcoming</Status>
                                                <guid isPermaLink="false">28591 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on New York 3 and 4 datacenters - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28586</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the New York 3 and 4 datacenter on the zscaler.net cloud. This maintenance is scheduled for Thursday at 1:30 AM Pacific Time on March 19, 2026 (Thursday, March 19, 2026 8:30 AM UTC), and can take up to 3 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 19 Mar 2026 09:19:42 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 19 Mar 2026 08:09:13 GMT</pubDate>
                                                            <startTime>Thu, 19 Mar 2026 08:30:00 GMT</startTime>
            <endTime>Thu, 19 Mar 2026 11:30:00 GMT</endTime>
                                    <ResolvedDate>Thu, 19 Mar 2026 09:20:02 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28586 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Planned Maintenance Activity for ZPA authentication service - private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/28576</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;We will be performing planned maintenance on our ZPA authentication platform infrastructure to enhance availability and resiliency. &amp;nbsp;Some customers may witness below impact during this maintenance window:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Brief retries or elevated latency for new auth requests might be seen during connection re‑establishment.&lt;/li&gt;&lt;li&gt;Transient errors during auth is possible; retry should succeed.&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;Important Note: No action is required from customers and this communication is only intended to inform in advance.&lt;/p&gt;&lt;p&gt;Please reach out to support if you have any questions or require further clarification.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 21 Mar 2026 03:18:18 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 19 Mar 2026 09:43:15 GMT</pubDate>
                                                            <startTime>Sat, 21 Mar 2026 02:00:00 GMT</startTime>
            <endTime>Sat, 21 Mar 2026 05:30:00 GMT</endTime>
                                    <ResolvedDate>Sat, 21 Mar 2026 03:18:51 GMT</ResolvedDate>
                                          <customerImpact>Brief retries or elevated latency for new auth requests during connection re‑establishment.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28576 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Sydney V Data Center online - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28571</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;You are receiving this notice in accordance with the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://help.zscaler.com/zia/zscaler-service-continuity-customer-notification-protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt;.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;As part of our effort to enhance our Security Cloud’s robustness and performance, Zscaler will be bringing online a new&amp;nbsp;Sydney V&amp;nbsp;(SYD5) data center. This facility will be added to the public resolution service (Auto Geo Proximity) on&amp;nbsp;March 19, 2026&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;What if I have more questions?&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Contact Zscaler Support via the “Support” link at the top-right of the Zscaler Administration U.I page.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll-Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 20 Mar 2026 02:59:02 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 18 Mar 2026 21:34:23 GMT</pubDate>
                                                            <startTime>Thu, 19 Mar 2026 22:00:00 GMT</startTime>
            <endTime>Thu, 19 Mar 2026 23:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 20 Mar 2026 02:59:11 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28571 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Planned Maintenance Activity for ZPA platform service - private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/28561</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;p1&quot;&gt;We will be performing planned maintenance on our&amp;nbsp;platform&amp;nbsp;infrastructure in the Prod US region to enhance availability and resiliency. &amp;nbsp;Some customers may witness below impact during this maintenance window:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;span class=&quot;s1&quot;&gt;&lt;/span&gt;Momentary disconnect and auto-reconnect of zcc.&lt;/li&gt;&lt;li&gt;&lt;span class=&quot;s1&quot;&gt;&lt;/span&gt;Any active session will be disconnected and logged under ZPA User Activity logs as “MT_CLOSED_TLS_CONN_GONE_SCIM_USER_MOVED”&lt;/li&gt;&lt;/ul&gt;&lt;p class=&quot;p1&quot;&gt;Important Note: &lt;strong&gt;No action is required from customers &lt;/strong&gt;and this communication is only intended to inform in advance.&lt;/p&gt;&lt;p class=&quot;p1&quot;&gt;Please reach out to support if you have any questions or require further clarification.&lt;/p&gt;&lt;p class=&quot;p1&quot;&gt;&lt;strong&gt;Maintenance Window&lt;/strong&gt;&lt;/p&gt;&lt;p class=&quot;p1&quot;&gt;&lt;span&gt;02:00 - 05:30 UTC&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;p1&quot;&gt;&lt;span&gt;15:00 - 19:00 UTC&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 22 Mar 2026 15:40:42 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 18 Mar 2026 10:46:13 GMT</pubDate>
                                                            <startTime>Sun, 22 Mar 2026 02:00:00 GMT</startTime>
            <endTime>Sun, 22 Mar 2026 19:00:00 GMT</endTime>
                                    <ResolvedDate>Sun, 22 Mar 2026 15:41:37 GMT</ResolvedDate>
                                          <customerImpact>Users might experience a momentary disconnect-and-reconnect. No action is required from our customers</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28561 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>San Francisco IV (SJC4) Datacenter Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/28556</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in San Francisco IV (SJC4) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window:&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-03-19 06:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp; 2026-03-19 14:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-03-18 23:00 - 2026-03-19 07:00)&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 19 Mar 2026 11:59:25 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 17 Mar 2026 18:40:20 GMT</pubDate>
                                                            <startTime>Thu, 19 Mar 2026 06:00:00 GMT</startTime>
            <endTime>Thu, 19 Mar 2026 14:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 19 Mar 2026 11:59:34 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28556 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Release Upgrade for Zscaler Data Security Posture Management (DSPM) - app.zsdpc.net</title>
                <link>https://trust.zscaler.com/posts/28526</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler Data Posture Control (DSPM) Operations team will be performing a planned upgrade activity on March 16th, 2026. These service updates are applied in regional off-peak hours and should not result in any downtime for customers. Please reach out to Customer support for more information about the changes.&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&amp;nbsp;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 16 Mar 2026 05:52:18 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 16 Mar 2026 04:07:57 GMT</pubDate>
                                                            <startTime>Mon, 16 Mar 2026 04:05:50 GMT</startTime>
            <endTime>Mon, 16 Mar 2026 05:52:52 GMT</endTime>
                                    <ResolvedDate>Mon, 16 Mar 2026 05:52:50 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28526 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - VZEN nodes - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28521</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the VZEN nodes in zscalertwo.net cloud. The maintenance will happen across VZEN nodes during the window, beginning at 06:30 PM Pacific Time on Saturday, March 14, 2026 (Sunday, March 15, 2026 01:30 AM UTC) and continuing for up to 5 hours. VZEN&#039;s services will be restarted as part of this change and service for your end users might be disrupted during the window. All logs will be collected and available after maintenance is complete.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 15 Mar 2026 06:26:43 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sun, 15 Mar 2026 01:35:11 GMT</pubDate>
                                                            <startTime>Sun, 15 Mar 2026 01:30:00 GMT</startTime>
            <endTime>Sun, 15 Mar 2026 06:30:00 GMT</endTime>
                                    <ResolvedDate>Sun, 15 Mar 2026 06:27:01 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28521 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on Zurich datacenter - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28516</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the Zurich datacenter on the zscloud.net cloud. This maintenance is scheduled for Saturday at 1:00 PM Pacific Time on March 14, 2026 (Saturday, March 14, 2026 8:00 PM UTC), and can take up to 3 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 14 Mar 2026 21:05:26 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 14 Mar 2026 16:55:41 GMT</pubDate>
                                                            <startTime>Sat, 14 Mar 2026 20:00:00 GMT</startTime>
            <endTime>Sat, 14 Mar 2026 23:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 14 Mar 2026 21:06:19 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28516 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance Extended - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28506</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance of the zscaler.net cloud by 2 hour. As part of our standard maintenance process, all logs will be collected and available after maintenance has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 14 Mar 2026 08:00:18 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 14 Mar 2026 05:49:48 GMT</pubDate>
                                                            <startTime>Sat, 14 Mar 2026 06:00:00 GMT</startTime>
            <endTime>Sat, 14 Mar 2026 08:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 14 Mar 2026 08:00:26 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28506 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Dubai I Datacenter Scheduled Maintenance - zscaler.net, zscalertwo.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28501</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Dubai I&amp;nbsp; (DXB1) Data Center.&amp;nbsp; During the maintenance window the services through DXB1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 19, 9:00 am PST (March 19, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 19, 3:00 pm PST (March 19, 22:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 19 Mar 2026 21:39:47 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 14 Mar 2026 01:31:40 GMT</pubDate>
                                                            <startTime>Thu, 19 Mar 2026 16:00:00 GMT</startTime>
            <endTime>Thu, 19 Mar 2026 22:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 19 Mar 2026 21:39:53 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28501 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Dubai I Datacenter Scheduled Maintenance- Service Expansion - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28496</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Dubai I (DXB1) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 7, 9:00 am PDT (April 7, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 7, 2:00 pm PDT (April 7, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/19: Maintenance postponed&lt;/li&gt;&lt;li&gt;Update 4/3: Maintenance Rescheduled&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 07 Apr 2026 20:53:08 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 14 Mar 2026 01:29:26 GMT</pubDate>
                                                            <startTime>Tue, 07 Apr 2026 16:00:00 GMT</startTime>
            <endTime>Tue, 07 Apr 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 07 Apr 2026 20:53:16 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28496 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Upcoming Data Center Expansions - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/28491</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and per email notification sent on&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/zscaler-support-new-datacenters-expansions.html?version=0&quot;&gt;&lt;span&gt;March 13, 2026&lt;/span&gt;&lt;/a&gt;&lt;span&gt;, we would like to notify you of the upcoming data center expansions at the locations listed below. These would be available anytime on or after May 12, 2026; 60 days or more from the date the first email notification is sent.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists (ACLs) to allow the new IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;CIDR&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;New York IV&lt;/td&gt;&lt;td&gt;198.14.96.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;New York IV&lt;/td&gt;&lt;td&gt;198.14.98.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;New York IV&lt;/td&gt;&lt;td&gt;198.14.100.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;New York IV&lt;/td&gt;&lt;td&gt;198.14.102.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Paris IV&lt;/td&gt;&lt;td&gt;137.31.8.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Paris IV&lt;/td&gt;&lt;td&gt;137.31.10.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Paris II&lt;/td&gt;&lt;td&gt;137.31.12.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;span&gt;We recommend that you add the IP address ranges listed in the ‘Zscaler Aggregate IP Address Ranges’ section of the CENR pages (refer applicable links below) to your access lists, firewalls, and application allow lists to avoid service disruption. The IPs from these ranges can be put in use by Zscaler for Web and Internet Application communication and dynamic service resolution.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zpatwo.net/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 14 Mar 2026 00:08:35 GMT</pubDate>
                                                            <startTime>Tue, 12 May 2026 00:00:00 GMT</startTime>
            <endTime>Tue, 12 May 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 14 Mar 2026 00:04:07 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28491 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Singapore IV Datacenter Scheduled Maintenance - zscaler.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28486</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Singapore IV (SIN4) Data Center.&amp;nbsp; During the maintenance window the services through SIN4 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 18, 9:00 am PST (March 18, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 18, 3:00 pm PST (March 18, 22:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 18 Mar 2026 22:18:40 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 13 Mar 2026 20:54:58 GMT</pubDate>
                                                            <startTime>Wed, 18 Mar 2026 16:00:00 GMT</startTime>
            <endTime>Wed, 18 Mar 2026 22:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 18 Mar 2026 22:18:51 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28486 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Manchester I Datacenter Scheduled Maintenance - Service Expansion - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28481</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Manchester I (MAN1) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;Start time is April 2, 200 pm PDT (April 2, 21:00 UTC)&lt;/p&gt;&lt;p&gt;End time is April 2, 7:00 pm PDT (April 3, 200 UTC)&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/18: Maintenance postponed&lt;/li&gt;&lt;li&gt;Update 3/31: Maintenance rescheduled&lt;/li&gt;&lt;li&gt;Update 4/1: Time Adjustment&lt;/li&gt;&lt;li&gt;Update 4/2: Extended Maintenance&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 03 Apr 2026 01:25:43 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 13 Mar 2026 17:25:04 GMT</pubDate>
                                                            <startTime>Thu, 02 Apr 2026 21:00:00 GMT</startTime>
            <endTime>Fri, 03 Apr 2026 02:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 03 Apr 2026 01:26:05 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28481 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Manchester I Datacenter Scheduled Maintenance - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28476</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Manchester I (MAN1) Data Center.&amp;nbsp; During the maintenance window the services through MAN1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 18, 11:00 am PST (March 18, 18:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 18, 4:00 pm PST (March 18, 23:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 18 Mar 2026 20:47:58 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 13 Mar 2026 17:23:30 GMT</pubDate>
                                                            <startTime>Wed, 18 Mar 2026 18:00:00 GMT</startTime>
            <endTime>Wed, 18 Mar 2026 23:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 18 Mar 2026 20:48:05 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28476 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Vienna I Datacenter Scheduled Maintenance - zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28471</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Vienna I (VIE1) Data Center.&amp;nbsp; During the maintenance window the services through VIE1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 16, 1:00 pm PST (March 16, 8:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 16, 7:00 pm PST (March 17, 2:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 17 Mar 2026 00:20:57 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 13 Mar 2026 17:09:15 GMT</pubDate>
                                                            <startTime>Mon, 16 Mar 2026 20:00:00 GMT</startTime>
            <endTime>Tue, 17 Mar 2026 02:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 17 Mar 2026 00:21:08 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28471 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Manchester I Datacenter Scheduled Maintenance - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28466</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Manchester I (MAN1) Data Center.&amp;nbsp; During the maintenance window the services through MAN1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 17, 11:00 am PST (March 17, 18:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 17, 6:00 pm PST (March 18, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/17: Extending maintenance&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 18 Mar 2026 01:01:38 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 13 Mar 2026 16:57:31 GMT</pubDate>
                                                            <startTime>Tue, 17 Mar 2026 18:00:00 GMT</startTime>
            <endTime>Wed, 18 Mar 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 18 Mar 2026 01:01:52 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28466 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Manchester I Datacenter Scheduled Maintenance - Service Expansion - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28461</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Manchester I (MAN1) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 2, 2:00 pm PDT (April 2, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 2, 7:00 pm PDT (April 3, 2:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/17: Extending Maintenance&lt;/li&gt;&lt;li&gt;Update 3/17: Maintenance Postponed&lt;/li&gt;&lt;li&gt;Update 3/31: Maintenance Rescheduled&lt;/li&gt;&lt;li&gt;Update 4/1: Time Adjustment&lt;/li&gt;&lt;li&gt;Update 4/2: Extending Maintenance&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 03 Apr 2026 01:24:30 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 13 Mar 2026 16:55:47 GMT</pubDate>
                                                            <startTime>Thu, 02 Apr 2026 21:00:00 GMT</startTime>
            <endTime>Fri, 03 Apr 2026 02:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 03 Apr 2026 01:24:45 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28461 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Taipei II Datacenter Scheduled Maintenance  - zscaler.net, zscalertwo.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28456</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Taipei II (TPE2) Data Center.&amp;nbsp; During the maintenance window the services through TPE2 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 17, 9:00 am PST (March 17, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 17, 2:00 pm PST (March 17, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 17 Mar 2026 21:46:05 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 13 Mar 2026 16:47:13 GMT</pubDate>
                                                            <startTime>Tue, 17 Mar 2026 16:00:00 GMT</startTime>
            <endTime>Tue, 17 Mar 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 17 Mar 2026 21:46:14 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28456 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Taipei II Datacenter Scheduled Maintenance - Service Expansion - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28451</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Taipei II (TPE2) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is April 8, 9:00 am PDT (April 8, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is April 8, 4:00 pm PDT (April 8, 23:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/17: Maintenance Postponed&lt;/li&gt;&lt;li&gt;Update 4/3: Maintenance Rescheduled&lt;/li&gt;&lt;li&gt;Update 4/8: Maintenance Extended&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 08 Apr 2026 22:32:14 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 13 Mar 2026 16:43:01 GMT</pubDate>
                                                            <startTime>Wed, 08 Apr 2026 16:00:00 GMT</startTime>
            <endTime>Wed, 08 Apr 2026 23:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 08 Apr 2026 22:32:23 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28451 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Paris IV Datacenter Scheduled Maintenance - zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28441</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Paris IV (PAR4) Data Center.&amp;nbsp; During the maintenance window the services through PAR4 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 16, 10:00 am PST (March 16, 17:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 16, 3:00 pm PST (March 16, 22:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 16 Mar 2026 20:03:56 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 13 Mar 2026 16:20:07 GMT</pubDate>
                                                            <startTime>Mon, 16 Mar 2026 17:00:00 GMT</startTime>
            <endTime>Mon, 16 Mar 2026 22:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 16 Mar 2026 20:04:02 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28441 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>China Premium and China Premium Plus Datacenters Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28426</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Beijing IV, Beijing V and Shanghai VI DCs network providers have advised maintenance work as below. During the maintenance window, China Premium and China Premium Plus services within these data centres may experience intermittent disconnections.&lt;/p&gt;&lt;p&gt;Start Time: 2026-03-20 18:00:00 UTC&lt;br&gt;End Time: 2026-03-20 20:00:00 UTC&lt;br&gt;&lt;strong&gt;(Datacenters&#039; Local Time &amp;nbsp;2026-03-21 02:00 - 2026-03-21 04:00 China Standard Time (UTC+8:00))&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;Reason of Maintenance: Provider advised maintenance.&lt;br&gt;Impact During Maintenance: Intermittent connectivity might be observed during the maintenance period&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 20 Mar 2026 19:39:55 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 16 Mar 2026 18:22:20 GMT</pubDate>
                                                            <startTime>Fri, 20 Mar 2026 18:00:00 GMT</startTime>
            <endTime>Fri, 20 Mar 2026 20:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 20 Mar 2026 19:41:10 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28426 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on Los Angeles, Los Angeles II, Seattle, San Francisco IV, and Denver III datacenters - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28421</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the Los Angeles, Los Angeles II, Seattle, San Francisco IV, and Denver III datacenters on the zscalertwo.net cloud. This maintenance is scheduled for Thursday at 11:00 PM Pacific Time on Mar 12, 2026 (Friday, Mar 13, 2026 06:00 AM UTC), and can take up to 3 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 13 Mar 2026 09:06:34 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 12 Mar 2026 23:02:39 GMT</pubDate>
                                                            <startTime>Fri, 13 Mar 2026 06:00:00 GMT</startTime>
            <endTime>Fri, 13 Mar 2026 09:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 13 Mar 2026 09:07:03 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28421 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on Atlanta II, Atlanta III, Washington DC, Washington DC IV, Miami III, and Boston I datacenters - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28416</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the Atlanta II, Atlanta III, Washington DC, Washington DC IV, Miami III, and Boston I datacenters on the zscalertwo.net cloud. This maintenance is scheduled for Thursday at 5:00 PM Pacific Time on Mar 12, 2026 (Friday, Mar 13, 2026 12:00 AM UTC), and can take up to 3 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 13 Mar 2026 02:37:42 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 12 Mar 2026 22:42:42 GMT</pubDate>
                                                            <startTime>Fri, 13 Mar 2026 00:00:00 GMT</startTime>
            <endTime>Fri, 13 Mar 2026 03:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 13 Mar 2026 02:37:51 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28416 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Planned Maintenance Activity for ZPA authentication service - zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/28411</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p class=&quot;p1&quot;&gt;We will be performing planned maintenance on our&amp;nbsp;ZPA authentication platform&amp;nbsp;infrastructure to enhance availability and resiliency. &amp;nbsp;Some customers may witness below impact during this maintenance window:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;span class=&quot;s1&quot;&gt;&lt;/span&gt;Brief retries or elevated latency for new auth requests might be seen during connection re‑establishment.&lt;/li&gt;&lt;li&gt;&lt;span class=&quot;s1&quot;&gt;&lt;/span&gt;Transient errors during auth is possible; retry should succeed.&lt;/li&gt;&lt;/ul&gt;&lt;p class=&quot;p1&quot;&gt;Important Note: &lt;strong&gt;No action is required from customers &lt;/strong&gt;and this communication is only intended to inform in advance.&lt;/p&gt;&lt;p class=&quot;p1&quot;&gt;Please reach out to support if you have any questions or require further clarification.&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 15 Mar 2026 16:15:56 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 13 Mar 2026 09:49:30 GMT</pubDate>
                                                            <startTime>Sun, 15 Mar 2026 15:00:00 GMT</startTime>
            <endTime>Sun, 15 Mar 2026 19:00:00 GMT</endTime>
                                    <ResolvedDate>Sun, 15 Mar 2026 16:16:17 GMT</ResolvedDate>
                                          <customerImpact>Brief retries or elevated latency for new auth requests during 
connection re‑establishment.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28411 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Release Upgrade for Zscaler Data Security Posture Management (DSPM) - app.eu.zsdpc.net</title>
                <link>https://trust.zscaler.com/posts/28401</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;Zscaler Data Posture Control (DSPM) Operations team will be performing a planned upgrade activity on March 12th, 2026. These service updates are applied in regional off-peak hours and should not result in any downtime for customers. Please reach out to Customer support for more information about the changes.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&amp;nbsp;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 12 Mar 2026 06:03:05 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 12 Mar 2026 04:00:26 GMT</pubDate>
                                                            <startTime>Thu, 12 Mar 2026 03:57:27 GMT</startTime>
            <endTime>Thu, 12 Mar 2026 06:00:30 GMT</endTime>
                                    <ResolvedDate>Thu, 12 Mar 2026 06:03:22 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28401 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Rio de Janeiro I Datacenter Scheduled Maintenance - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28396</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Rio de Janeiro I (RIO1) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 12, 6:00 pm PST (March 13, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 12, 11:00 pm PST (March 13, 6:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 13 Mar 2026 06:04:13 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 11 Mar 2026 19:54:37 GMT</pubDate>
                                                            <startTime>Fri, 13 Mar 2026 01:00:00 GMT</startTime>
            <endTime>Fri, 13 Mar 2026 06:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 13 Mar 2026 06:04:19 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28396 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zscalerone.net</title>
                <link>https://trust.zscaler.com/posts/28391</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on zscalerone.net cloud. This maintenance is scheduled for Thursday at 1:00 AM Pacific Time on Mar 12, 2026 (Thursday, Mar 12, 2026 8:00 AM UTC), and can take up to 3 hours to complete.&lt;/p&gt;&lt;p&gt;During maintenance, the Zscaler Client Connector Portal will be in maintenance mode. As a result, access to policy management and reporting will not be available. Existing devices that are already enrolled will not be affected, but there may be intermittent failures in registering new devices. Rest assured, all logs will be collected and made available once the maintenance mode window concludes.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 12 Mar 2026 10:57:34 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 11 Mar 2026 16:15:36 GMT</pubDate>
                                                            <startTime>Thu, 12 Mar 2026 08:00:00 GMT</startTime>
            <endTime>Thu, 12 Mar 2026 11:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 12 Mar 2026 10:57:54 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28391 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Planned Maintenance Activity for ZPA platform service - private.zscaler.com</title>
                <link>https://trust.zscaler.com/posts/28386</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p class=&quot;p1&quot;&gt;We will be performing planned maintenance on our&amp;nbsp;platform&amp;nbsp;infrastructure in the Prod US region to enhance availability and resiliency. &amp;nbsp;Some customers may witness below impact during this maintenance window:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;span class=&quot;s1&quot;&gt;&lt;/span&gt;Momentary disconnect and auto-reconnect of zcc.&lt;/li&gt;&lt;li&gt;&lt;span class=&quot;s1&quot;&gt;&lt;/span&gt;Any active session will be disconnected and logged under ZPA User Activity logs as “MT_CLOSED_TLS_CONN_GONE_SCIM_USER_MOVED”&lt;/li&gt;&lt;/ul&gt;&lt;p class=&quot;p1&quot;&gt;Important Note: &lt;strong&gt;No action is required from customers &lt;/strong&gt;and this communication is only intended to inform in advance.&lt;/p&gt;&lt;p class=&quot;p1&quot;&gt;Please reach out to support if you have any questions or require further clarification.&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 15 Mar 2026 05:02:19 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 12 Mar 2026 06:08:28 GMT</pubDate>
                                                            <startTime>Sun, 15 Mar 2026 02:00:00 GMT</startTime>
            <endTime>Sun, 15 Mar 2026 05:30:00 GMT</endTime>
                                    <ResolvedDate>Sun, 15 Mar 2026 05:07:05 GMT</ResolvedDate>
                                          <customerImpact>Users might experience a momentary disconnect-and-reconnect.
No action is required from our customers.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28386 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on Dallas I, Dallas II, New York III, New York IV datacenters - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28376</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the &amp;nbsp;Dallas I, Dallas II, New York III, New York IV datacenters on the zscalerthree.net cloud. This maintenance can take up to 2 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 11 Mar 2026 10:02:18 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 11 Mar 2026 05:44:23 GMT</pubDate>
                                                            <startTime>Wed, 11 Mar 2026 09:00:00 GMT</startTime>
            <endTime>Wed, 11 Mar 2026 11:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 11 Mar 2026 10:02:35 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28376 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance on AMER region&#039;s Egress NAT nodes - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28371</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing a scheduled maintenance on the AMER region&#039;s Egress NAT nodes on zscalerone.net, zscalertwo.net, zscalerthree.net, zscloud.net and zscaler.net clouds. This maintenance is scheduled for Saturday at 6:00 PM Pacific Time on Mar 14, 2026 (Sunday, Mar 15, 2026 01:00 AM UTC), and can take up to 4 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;latest-update&quot;&gt;&lt;p class=&quot;zs-update-latest zs-update&quot; id=&quot;resolved-update&quot;&gt;&lt;strong&gt;Latest Update - &lt;/strong&gt;&lt;span class=&quot;report-time&quot;&gt;Fri, 10 Apr 2026 15:00:57 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;div class=&quot;update-list update-1&quot;&gt;&lt;p class=&quot;zs-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 11 Mar 2026 23:50:18 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This maintenance is now scheduled for Sunday at 2:00 AM Pacific Time on Mar 15, 2026 (Sunday, Mar 15, 2026 09:00 AM UTC), and can take up to 4 hours to complete.&lt;/p&gt;&lt;/div&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 10 Apr 2026 15:00:57 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity was completed within the mentioned timeframe. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 11 Mar 2026 00:48:12 GMT</pubDate>
                                                            <startTime>Sun, 15 Mar 2026 09:00:00 GMT</startTime>
            <endTime>Sun, 15 Mar 2026 13:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 10 Apr 2026 15:01:25 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28371 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance on APAC region&#039;s Egress NAT nodes - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28366</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing a scheduled maintenance on the APAC region&#039;s Egress NAT nodes on zscalerone.net, zscalertwo.net, zscalerthree.net, zscloud.net and zscaler.net clouds. This maintenance is scheduled for Saturday at 6:00 AM Pacific Time on Mar 14, 2026 (Saturday, Mar 14, 2026 01:00 PM UTC), and can take up to 4 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 14 Mar 2026 15:30:48 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 11 Mar 2026 00:43:53 GMT</pubDate>
                                                            <startTime>Sat, 14 Mar 2026 13:00:00 GMT</startTime>
            <endTime>Sat, 14 Mar 2026 17:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 14 Mar 2026 15:31:38 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28366 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance on EMEA region&#039;s Egress NAT nodes - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28361</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing a scheduled maintenance on the EMEA region&#039;s Egress NAT nodes on zscalerone.net, zscalertwo.net, zscalerthree.net, zscloud.net and zscaler.net clouds. This maintenance is scheduled for Friday at 6:00 PM Pacific Time on Mar 13, 2026 (Saturday, Mar 14, 2026 01:00 AM UTC), and can take up to 4 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;latest-update&quot;&gt;&lt;p class=&quot;zs-update-latest zs-update&quot; id=&quot;resolved-update&quot;&gt;&lt;strong&gt;Latest Update - &lt;/strong&gt;&lt;span class=&quot;report-time&quot;&gt;Sun, 15 Mar 2026 06:28:13 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;div class=&quot;update-list update-1&quot;&gt;&lt;p class=&quot;zs-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 11 Mar 2026 23:43:08 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This maintenance is now scheduled for Saturday at 6:00 PM Pacific Time on Mar 14, 2026 (Sunday, Mar 15, 2026 01:00 AM UTC), and can take up to 4 hours to complete.&lt;/p&gt;&lt;/div&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 15 Mar 2026 06:28:13 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 11 Mar 2026 00:40:59 GMT</pubDate>
                                                            <startTime>Sun, 15 Mar 2026 01:00:00 GMT</startTime>
            <endTime>Sun, 15 Mar 2026 05:00:00 GMT</endTime>
                                    <ResolvedDate>Sun, 15 Mar 2026 06:28:43 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28361 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance on Oceania region&#039;s Egress NAT nodes - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28356</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing a scheduled maintenance on the Oceania region&#039;s Egress NAT nodes on zscalerone.net, zscalertwo.net, zscalerthree.net, zscloud.net and zscaler.net clouds. This maintenance is scheduled for Friday at 2:00 AM Pacific Time on Mar 13, 2026 (Friday, Mar 13, 2026 09:00 AM UTC), and can take up to 4 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;latest-update&quot;&gt;&lt;p class=&quot;zs-update-latest zs-update&quot; id=&quot;resolved-update&quot;&gt;&lt;strong&gt;Latest Update - &lt;/strong&gt;&lt;span class=&quot;report-time&quot;&gt;Sat, 14 Mar 2026 12:56:39 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;div class=&quot;update-list update-1&quot;&gt;&lt;p class=&quot;zs-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 11 Mar 2026 23:27:26 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This maintenance is now scheduled for Saturday at 2:00 AM Pacific Time on Mar 14, 2026 (Saturday, Mar 14, 2026 09:00 AM UTC), and can take up to 4 hours to complete.&lt;/p&gt;&lt;/div&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 14 Mar 2026 12:56:39 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 11 Mar 2026 00:37:42 GMT</pubDate>
                                                            <startTime>Sat, 14 Mar 2026 09:00:00 GMT</startTime>
            <endTime>Sat, 14 Mar 2026 13:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 14 Mar 2026 12:56:59 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28356 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Manchester I Datacenter Scheduled Maintenance - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28351</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Manchester I (MAN1) Data Center.&amp;nbsp; During the maintenance window the services through MAN1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 13, 11:00 am PST (March 13, 18:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 13, 800 pm PST (March 14, 03:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/13/26: Extending Maintenance&lt;/li&gt;&lt;li&gt;Update 3/13/26: Extending Maintenance&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 14 Mar 2026 03:02:43 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 10 Mar 2026 20:54:21 GMT</pubDate>
                                                            <startTime>Fri, 13 Mar 2026 18:00:00 GMT</startTime>
            <endTime>Sat, 14 Mar 2026 03:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 14 Mar 2026 03:02:52 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28351 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Manchester I Datacenter Scheduled Maintenance - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28346</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Manchester I (MAN1) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 13, 11:00 am PST (March 13, 18:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 13, 4:00 pm PST (March 13, 23:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 13 Mar 2026 21:48:10 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 10 Mar 2026 20:52:36 GMT</pubDate>
                                                            <startTime>Fri, 13 Mar 2026 18:00:00 GMT</startTime>
            <endTime>Fri, 13 Mar 2026 23:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 13 Mar 2026 21:48:21 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28346 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Singapore IV Datacenter Scheduled Maintenance - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28341</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Singapore IV (SIN4) Data Center.&amp;nbsp; During the maintenance window the services through SIN4 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 12, 9:00 am PST (March 12, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 12, 2:00 pm PST (March 12, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 12 Mar 2026 21:11:37 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 10 Mar 2026 18:25:39 GMT</pubDate>
                                                            <startTime>Thu, 12 Mar 2026 16:00:00 GMT</startTime>
            <endTime>Thu, 12 Mar 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 12 Mar 2026 21:11:47 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28341 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Singapore IV Datacenter Scheduled Maintenance  - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28336</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing planned maintenance at our Singapore IV (SIN4) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream access lists (ACLs) to allow all IP address ranges for this DC.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 12, 9:00 am PST (March 12, 16:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 12, 2:00 pm PST (March 12, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 12 Mar 2026 21:12:25 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 10 Mar 2026 18:23:18 GMT</pubDate>
                                                            <startTime>Thu, 12 Mar 2026 16:00:00 GMT</startTime>
            <endTime>Thu, 12 Mar 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 12 Mar 2026 21:12:36 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28336 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Hong Kong III Datacenter Scheduled Maintenance - zscaler.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28331</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Hong Kong III (HKG3) Data Center.&amp;nbsp; During the maintenance window the services through HKG3 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 19, 7:00 am PST (March 19, 14:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 19, 2:00 pm PST (March 19, 21:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li data-list-item-id=&quot;e015eebde11f747f330bc43df3e45076b&quot;&gt;Update 3/12: Extending Maintenance&lt;/li&gt;&lt;li data-list-item-id=&quot;ea5fbbbbf9d8e1064a6ecf1e54d7cb083&quot;&gt;Update 3/12: Maintenance Postponed&lt;/li&gt;&lt;li data-list-item-id=&quot;e920cf4176c285c0a13620d1315c7b8a8&quot;&gt;Update 3/13: Maintenance Rescheduled&lt;/li&gt;&lt;li data-list-item-id=&quot;e77bf8a1bfa988ef55f7cbfc2ac75b52d&quot;&gt;Update 3/19: Extending Maintenance&lt;/li&gt;&lt;li data-list-item-id=&quot;e7d8b4476f323daaf5fa0b81bcc940a50&quot;&gt;Update 3/19: Maintenance Postponed&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 10 Mar 2026 18:14:16 GMT</pubDate>
                                                            <startTime>Thu, 19 Mar 2026 14:00:00 GMT</startTime>
            <endTime>Thu, 19 Mar 2026 21:00:00 GMT</endTime>
                                                                                            <Status>Cancelled</Status>
                                                <guid isPermaLink="false">28331 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Hong Kong III Datacenter Scheduled Maintenance - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28326</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing planned maintenance at our Hong Kong III (HKG3) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 12, 7:00 am PST (March 12, 14:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 12, 1:00 pm PST (March 12, 20:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/12: Extended Maintenance&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 12 Mar 2026 20:24:25 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 10 Mar 2026 18:11:34 GMT</pubDate>
                                                            <startTime>Thu, 12 Mar 2026 14:00:00 GMT</startTime>
            <endTime>Thu, 12 Mar 2026 20:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 12 Mar 2026 20:24:44 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28326 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Mumbai VI Datacenter Scheduled Maintenance - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28311</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing planned maintenance at our Mumbai VI (BOM6) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 11, 10:30 am PST (March 11, 17:30 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 11,&amp;nbsp; 4:30 pm PST (March 11, 23:30 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 12 Mar 2026 00:12:54 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 09 Mar 2026 23:41:21 GMT</pubDate>
                                                            <startTime>Wed, 11 Mar 2026 17:30:00 GMT</startTime>
            <endTime>Wed, 11 Mar 2026 23:30:00 GMT</endTime>
                                    <ResolvedDate>Thu, 12 Mar 2026 00:13:14 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28311 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Singapore V Datacenter Scheduled Maintenance  - zscaler.net, zscalertwo.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28306</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Singapore V (SIN5) Data Center.&amp;nbsp; During the maintenance window the services through SIN5 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 10, 10:30 am PST (March 10, 17:30 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 10, 5:00 pm PST (March 11, 00:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/10: Extending Maintenance&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 10 Mar 2026 23:59:37 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 09 Mar 2026 17:31:11 GMT</pubDate>
                                                            <startTime>Tue, 10 Mar 2026 17:30:00 GMT</startTime>
            <endTime>Wed, 11 Mar 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 10 Mar 2026 23:59:44 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28306 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Singapore V Datacenter Scheduled Maintenance - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28301</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing planned maintenance at our Singapore V (SIN5) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;The new VIPs for&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://help.zscaler.com/zia/about-extranet&quot;&gt;&lt;span&gt;Zscaler Extranet Application Support&lt;/span&gt;&lt;/a&gt;&lt;span&gt; are 167.103.60.134 &amp;amp; 2400:7aa0:2310::3a&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream access lists (ACLs) to allow all IP address ranges for this DC.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 10, 10:30 am PST (March 10, 17:30 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 10, 5:00 pm PST (March 11, 00:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/10/26: Extending Maintenance&lt;/li&gt;&lt;li&gt;Update 3/9/26: Correcting UTC date + Added ipv6 Extranet VIP&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 11 Mar 2026 00:00:01 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 09 Mar 2026 17:26:02 GMT</pubDate>
                                                            <startTime>Tue, 10 Mar 2026 17:30:00 GMT</startTime>
            <endTime>Wed, 11 Mar 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 11 Mar 2026 00:00:07 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28301 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Brussels II Datacenter Scheduled Maintenance - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28296</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing planned maintenance at our Brussels II&amp;nbsp;(BRU2) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 11, 10:00 am PST (March 11, 17:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 11, 6:00 pm PST (March 12, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/11/26: Extending Maintenance&lt;/li&gt;&lt;li&gt;Update 3/11/26: Extending Maintenance&amp;nbsp;&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 11 Mar 2026 23:41:45 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 09 Mar 2026 16:17:46 GMT</pubDate>
                                                            <startTime>Wed, 11 Mar 2026 17:00:00 GMT</startTime>
            <endTime>Thu, 12 Mar 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 11 Mar 2026 23:41:55 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28296 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Paris IV Datacenter Scheduled Maintenance - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28291</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing planned maintenance at our Paris IV (PAR4) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 10, 10:00 am PST (March 10, 17:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 10, 3:00 pm PST (March 10, 22:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 10 Mar 2026 20:10:26 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 09 Mar 2026 15:53:04 GMT</pubDate>
                                                            <startTime>Tue, 10 Mar 2026 17:00:00 GMT</startTime>
            <endTime>Tue, 10 Mar 2026 22:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 10 Mar 2026 20:11:09 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28291 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance Extended - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28286</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance of the zscalerthree.net cloud by 1 hour. As part of our standard maintenance process, all logs will be collected and available after maintenance has been completed. Please contact Zscaler Support if you have additional questions.&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 08 Mar 2026 06:54:21 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sun, 08 Mar 2026 06:04:06 GMT</pubDate>
                                                            <startTime>Sun, 08 Mar 2026 06:00:00 GMT</startTime>
            <endTime>Sun, 08 Mar 2026 07:00:00 GMT</endTime>
                                    <ResolvedDate>Sun, 08 Mar 2026 06:54:30 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28286 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance Extended - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28281</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance of the zscloud.net cloud by 1 hour. As part of our standard maintenance process, all logs will be collected and available after maintenance has been completed. Please contact Zscaler Support if you have additional questions.&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 08 Mar 2026 06:01:26 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sun, 08 Mar 2026 05:50:19 GMT</pubDate>
                                                            <startTime>Sun, 08 Mar 2026 06:00:00 GMT</startTime>
            <endTime>Sun, 08 Mar 2026 07:00:00 GMT</endTime>
                                    <ResolvedDate>Sun, 08 Mar 2026 06:01:38 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28281 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on Oceania and AMER datacenters for DLP services - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28276</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the Oceania and AMER datacenters on the zscaler.net cloud. This maintenance is scheduled for Sunday at 1:00 AM Pacific Time on Mar 8, 2026 (Sunday, Mar 8, 2026 9:00 AM UTC), and can take up to 3 hours to complete. We expect minimal to no impact to DLP - EDM and IDM functionality during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 13 Apr 2026 14:22:42 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity was completed within the mentioned timeframe. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 07 Mar 2026 21:24:05 GMT</pubDate>
                                                            <startTime>Sun, 08 Mar 2026 09:00:00 GMT</startTime>
            <endTime>Sun, 08 Mar 2026 11:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 13 Apr 2026 14:23:28 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28276 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on APAC and EMEA datacenters for DLP services - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28271</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the APAC and EMEA datacenters on the zscaler.net cloud. This maintenance is scheduled for Saturday at 2:00 PM Pacific Time on Mar 7, 2026 (Saturday, Mar 7, 2026 10:00 PM UTC), and can take up to 3 hours to complete. We expect minimal to no impact to DLP - EDM and IDM functionality during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 07 Mar 2026 23:48:17 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 07 Mar 2026 21:12:20 GMT</pubDate>
                                                            <startTime>Sat, 07 Mar 2026 22:00:00 GMT</startTime>
            <endTime>Sun, 08 Mar 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 07 Mar 2026 23:48:35 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28271 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance Extended - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28266</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance of the zscalertwo.net cloud by 2 hours. As part of our standard maintenance process, all logs will be collected and available after maintenance has been completed. Please contact Zscaler Support if you have additional questions.&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 07 Mar 2026 07:46:17 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 07 Mar 2026 06:23:22 GMT</pubDate>
                                                            <startTime>Sat, 07 Mar 2026 06:00:00 GMT</startTime>
            <endTime>Sat, 07 Mar 2026 08:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 07 Mar 2026 07:46:29 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28266 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Cloud Connector Repo Update - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28261</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;Zscaler operations will be performing a planned Software repository update (version 1.146.5_6.2.51633) for the Cloud Connectors on March 7th, 2026 between 9 AM PST to 11 AM PST (March &amp;nbsp;7th, 2026 between 17:00 to 19:00 UTC). To minimize disruption, we will be rolling out these changes gradually to all customers in 2-3 weeks. The service upgrade will deploy in accordance with the customer configured &lt;a href=&quot;https://help.zscaler.com/cloud-branch-connector/managing-cloud-branch-connector-upgrades&quot;&gt;upgrade schedule&lt;/a&gt;. Workloads may experience a brief connection interruption. Customers should ensure that services are configured with recommended &lt;a href=&quot;https://help.zscaler.com/cloud-branch-connector/understanding-high-availability-and-failover&quot;&gt;high availability&lt;/a&gt; to minimize traffic disruptions.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&amp;nbsp;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 08 Mar 2026 22:58:49 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 07 Mar 2026 02:17:49 GMT</pubDate>
                                                            <startTime>Sat, 07 Mar 2026 17:00:00 GMT</startTime>
            <endTime>Sat, 07 Mar 2026 19:00:00 GMT</endTime>
                                    <ResolvedDate>Sun, 08 Mar 2026 22:58:58 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28261 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Kuala Lumpur II Data Center online - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28256</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;You are receiving this notice in accordance with the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://help.zscaler.com/zia/zscaler-service-continuity-customer-notification-protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt;.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;As part of our effort to enhance our Security Cloud’s robustness and performance, Zscaler will be bringing online a new Kuala Lumpur II (KUL2) data center. This facility will be added to the public resolution service (Auto Geo Proximity) on March 9, 2026&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;What if I have more questions?&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Contact Zscaler Support via the “Support” link at the top-right of the Zscaler Administration U.I page.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll-Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 09 Mar 2026 20:37:17 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 06 Mar 2026 17:55:52 GMT</pubDate>
                                                            <startTime>Mon, 09 Mar 2026 19:00:00 GMT</startTime>
            <endTime>Mon, 09 Mar 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 09 Mar 2026 20:37:24 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28256 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance Extended - EMEA Region - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28241</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance of the EMEA region&#039;s datacenters on zscloud.net cloud by 3 hours. During this extended maintenance window the ZIA Admin Portal, including policy management and reporting access, and new user authentication should be successful. As part of our standard maintenance process, all logs will be collected and available after maintenance has been completed.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 11 Mar 2026 18:10:01 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity was completed within the extended maintenance window. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 05 Mar 2026 22:50:47 GMT</pubDate>
                                                            <startTime>Thu, 05 Mar 2026 23:00:00 GMT</startTime>
            <endTime>Fri, 06 Mar 2026 02:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 11 Mar 2026 18:10:43 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28241 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Vienna I Datacenter Scheduled Maintenance - zscaler.net, zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28236</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be enabling IPv6 at our Vienna I (VIE1) Data Center.&amp;nbsp; During the maintenance window the services through VIE1 Data Center will be restarted in phases to minimize the service impact.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Other Zscaler sites and Zscaler Services will continue to operate normally.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 9, 1:00 pm PST (March 9, 20:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 9, 7:00 pm PST (March 10, 2:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 10 Mar 2026 00:56:53 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 05 Mar 2026 21:28:25 GMT</pubDate>
                                                            <startTime>Mon, 09 Mar 2026 20:00:00 GMT</startTime>
            <endTime>Tue, 10 Mar 2026 02:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 10 Mar 2026 00:56:58 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28236 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Upcoming New Data Centers and Expansions - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/28226</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Zscaler Customer,&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and per email notification sent on&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/support-notification-upcoming-new-data-centers-and-expansion.html?version=0&quot;&gt;&lt;span&gt;March 3, 2026&lt;/span&gt;&lt;/a&gt;&lt;span&gt;, we would like to notify you of the upcoming new data centers and expansions at the locations listed below. These would be available anytime on or after May 2, 2026; 60 days or more from the date the first email notification is sent.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists (ACLs) to allow the new IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;CIDR&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Bogota II&lt;/td&gt;&lt;td&gt;205.220.57.0/24&lt;/td&gt;&lt;td&gt;New RS* data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Americas&lt;/td&gt;&lt;td&gt;Bogota II&lt;/td&gt;&lt;td&gt;205.220.68.0/24&lt;/td&gt;&lt;td&gt;New RS* data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai II&lt;/td&gt;&lt;td&gt;205.220.122.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai II&lt;/td&gt;&lt;td&gt;205.220.124.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Chennai II&lt;/td&gt;&lt;td&gt;205.220.126.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong IV&lt;/td&gt;&lt;td&gt;175.107.170.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong IV&lt;/td&gt;&lt;td&gt;175.107.172.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong IV&lt;/td&gt;&lt;td&gt;175.107.174.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong IV&lt;/td&gt;&lt;td&gt;175.107.176.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong IV&lt;/td&gt;&lt;td&gt;175.107.178.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong IV&lt;/td&gt;&lt;td&gt;2400:7aa0:2e00::/40&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hyderabad I&lt;/td&gt;&lt;td&gt;101.2.252.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hyderabad I&lt;/td&gt;&lt;td&gt;101.2.254.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Jakarta I&lt;/td&gt;&lt;td&gt;162.128.187.0/24&lt;/td&gt;&lt;td&gt;New RS* data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Shanghai II&lt;/td&gt;&lt;td&gt;116.196.192.0/24&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;159.254.242.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;159.254.244.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;159.254.246.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;159.254.248.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;159.254.250.0/23&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;2a03:eec0:3900::/40&lt;/td&gt;&lt;td&gt;New data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Abu Dhabi II&lt;/td&gt;&lt;td&gt;147.161.174.0/23&lt;/td&gt;&lt;td&gt;Allocation removed from this data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;London III&lt;/td&gt;&lt;td&gt;170.85.60.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;London V&lt;/td&gt;&lt;td&gt;159.254.222.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;London V&lt;/td&gt;&lt;td&gt;159.254.224.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Frankfurt IV&lt;/td&gt;&lt;td&gt;159.254.226.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Frankfurt IV&lt;/td&gt;&lt;td&gt;159.254.228.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Frankfurt IV&lt;/td&gt;&lt;td&gt;159.254.230.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Frankfurt VI&lt;/td&gt;&lt;td&gt;159.254.232.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Frankfurt VI&lt;/td&gt;&lt;td&gt;159.254.234.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Manchester I&lt;/td&gt;&lt;td&gt;159.254.236.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Manchester I&lt;/td&gt;&lt;td&gt;159.254.238.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Marseille I&lt;/td&gt;&lt;td&gt;159.254.252.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing data center&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;em&gt;*RS - Regional Surcharge (An additional subscription is required in order to use these data centers)&lt;/em&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;We recommend that you add the IP address ranges listed in the ‘Zscaler Aggregate IP Address Ranges’ section of the CENR pages (refer applicable links below) to your access lists, firewalls, and application allow lists to avoid service disruption. The IPs from these ranges can be put in use by Zscaler for Web and Internet Application communication and dynamic service resolution.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zpatwo.net/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 04 Mar 2026 00:12:17 GMT</pubDate>
                                                            <startTime>Sat, 02 May 2026 00:00:00 GMT</startTime>
            <endTime>Sat, 02 May 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 03 Mar 2026 23:59:55 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28226 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Mumbai VI Datacenter Scheduled Maintenance - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28221</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing planned maintenance at our Mumbai VI (BOM6) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 6, 10:00 am PST (March 6, 18:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 6, 2:00 pm PST (March 6, 22:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 06 Mar 2026 22:28:01 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 02 Mar 2026 23:06:51 GMT</pubDate>
                                                            <startTime>Fri, 06 Mar 2026 18:00:00 GMT</startTime>
            <endTime>Fri, 06 Mar 2026 22:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 06 Mar 2026 22:28:08 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28221 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Reminder Notification for Upcoming Data Center Expansions - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net, private.zscaler.com, zpatwo.net</title>
                <link>https://trust.zscaler.com/posts/28216</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Dear Customer,&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;In accordance with the&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://support.zscaler.com/hc/en-us/articles/215106086-Zscaler-Service-Continuity-Customer-Notification-Protocol&quot;&gt;&lt;span&gt;Zscaler Service Continuity Policy&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and as previously announced via&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://info.zscaler.com/rs/306-ZEJ-256/images/zscaler-support-notification-upcoming-data-center-expansions-jan-26.html?version=0&quot;&gt;&lt;span&gt;email notification&lt;/span&gt;&lt;/a&gt;&lt;span&gt; and&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;https://trust.zscaler.com/zscaler.net/posts/27466&quot;&gt;&lt;span&gt;Trust&amp;nbsp;&lt;/span&gt;&lt;/a&gt;&lt;span&gt;on January 16, 2026, we would like to remind you of the upcoming data center expansions at the locations listed below. These would be effective anytime on or after March 17, 2026.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream access control lists to allow the new IP address ranges to avoid any service disruption.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;table&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Region&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Location&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;CIDR&lt;/strong&gt;&lt;/td&gt;&lt;td&gt;&lt;strong&gt;Notes&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;APAC&lt;/td&gt;&lt;td&gt;Hong Kong III&lt;/td&gt;&lt;td&gt;101.2.242.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing DC&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Helsinki I&lt;/td&gt;&lt;td&gt;159.254.210.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing DC&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Munich I&lt;/td&gt;&lt;td&gt;159.254.212.0/22&lt;/td&gt;&lt;td&gt;Expansion of existing DC&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;EMEA&lt;/td&gt;&lt;td&gt;Stockholm III&lt;/td&gt;&lt;td&gt;165.225.238.0/23&lt;/td&gt;&lt;td&gt;Expansion of existing DC&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;/div&gt;&lt;p&gt;&lt;span&gt;We recommend that you add the IP address ranges listed in the “Zscaler Aggregate IP Address Ranges’’ section of the CENR page to your access lists, firewalls, and application allowlists to avoid service disruption. The IPs from these ranges can be put in use by Zscaler for Web and Internet Application communication and dynamic service resolution.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;span&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/private.zscaler.com/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/private.zscaler.com/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zpatwo.net/zpa&quot;&gt;&lt;span&gt;https://config.zscaler.com/zpatwo.net/zpa&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;If you have any questions, please contact Zscaler Support via the “Support” link on the Zscaler Administration U.I. or contact us by phone:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;USA Toll Free: +1-844-971-0010&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Global Direct: +1-408-752-5885&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 02 Mar 2026 21:04:20 GMT</pubDate>
                                                            <startTime>Tue, 17 Mar 2026 00:00:00 GMT</startTime>
            <endTime>Tue, 17 Mar 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 02 Mar 2026 21:00:52 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28216 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance Extended - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28191</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance of the zscloud.net cloud by 2 hours. As part of our standard maintenance process, all logs will be collected and available after maintenance has been completed. Please contact Zscaler Support if you have additional questions.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sun, 01 Mar 2026 07:07:16 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sun, 01 Mar 2026 05:27:53 GMT</pubDate>
                                                            <startTime>Sun, 01 Mar 2026 06:00:00 GMT</startTime>
            <endTime>Sun, 01 Mar 2026 08:00:00 GMT</endTime>
                                    <ResolvedDate>Sun, 01 Mar 2026 07:07:34 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28191 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zscalerone.net</title>
                <link>https://trust.zscaler.com/posts/28181</link>
                                <description>&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the zscalerone.net cloud. This maintenance is scheduled for Sunday at 1:00 AM Pacific Time on March 1, 2026 (Sunday, March 1, 2026 9:00 AM UTC), and can take up to 4 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 28 Feb 2026 20:34:53 GMT</pubDate>
                                                            <startTime>Sun, 01 Mar 2026 09:00:00 GMT</startTime>
            <endTime>Sun, 01 Mar 2026 13:00:00 GMT</endTime>
                                                                                            <Status>Upcoming</Status>
                                                <guid isPermaLink="false">28181 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on Capetown, Capetown IV, Johannesburg II, Johannesburg III, Lagos, London III, and New York III datacenters - zscalerone.net</title>
                <link>https://trust.zscaler.com/posts/28176</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the Capetown, Capetown IV, Johannesburg II, Johannesburg III, Lagos, London III, and New York III datacenters on the zscalerone.net cloud. This maintenance is scheduled for Saturday at 2:00 PM Pacific Time on February 28, 2026 (Saturday, February 28, 2026 10:00 PM UTC), and can take up to 3 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 28 Feb 2026 23:53:28 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 28 Feb 2026 20:27:07 GMT</pubDate>
                                                            <startTime>Sat, 28 Feb 2026 22:00:00 GMT</startTime>
            <endTime>Sun, 01 Mar 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 28 Feb 2026 23:54:03 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28176 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Scheduled Maintenance Extended - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28161</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;&lt;span&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance of the zscaler.net cloud by 4 hours. As part of our standard maintenance process, all logs will be collected and available after maintenance has been completed. Please contact Zscaler Support if you have additional questions.&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;latest-update&quot;&gt;&lt;p class=&quot;zs-update-latest zs-update&quot; id=&quot;resolved-update&quot;&gt;&lt;strong&gt;Latest Update - &lt;/strong&gt;&lt;span class=&quot;report-time&quot;&gt;Sat, 28 Feb 2026 11:27:44 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;div class=&quot;update-list update-1&quot;&gt;&lt;p class=&quot;zs-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 28 Feb 2026 09:15:38 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance of the zscaler.net cloud by 3 hours.&lt;/p&gt;&lt;/div&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Sat, 28 Feb 2026 11:27:44 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 28 Feb 2026 05:27:52 GMT</pubDate>
                                                            <startTime>Sat, 28 Feb 2026 06:00:00 GMT</startTime>
            <endTime>Sat, 28 Feb 2026 13:00:00 GMT</endTime>
                                    <ResolvedDate>Sat, 28 Feb 2026 11:27:53 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28161 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Osaka I Datacenter Scheduled Maintenance - zscaler.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28156</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Osaka I (OSA1) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 4, 9:00 am PST (March 4, 17:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 4, 3:00 pm PST (March 4, 23:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 3/3/26: Corrected UTC date &amp;amp; time&lt;/li&gt;&lt;li&gt;Update 3/4/26: Extending Maintenance&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 05 Mar 2026 02:04:55 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 28 Feb 2026 01:56:13 GMT</pubDate>
                                                            <startTime>Wed, 04 Mar 2026 17:00:00 GMT</startTime>
            <endTime>Wed, 04 Mar 2026 23:00:00 GMT</endTime>
                                    <ResolvedDate>Thu, 05 Mar 2026 02:06:08 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28156 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Denver III Datacenter Scheduled Maintenance - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28151</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Denver III (DEN3) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 3, 5:00 pm PST (March 4, 1:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 3, 11:00 pm PST (March 4, 7:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 04 Mar 2026 06:44:10 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 28 Feb 2026 01:26:21 GMT</pubDate>
                                                            <startTime>Wed, 04 Mar 2026 01:00:00 GMT</startTime>
            <endTime>Wed, 04 Mar 2026 07:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 04 Mar 2026 06:44:20 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28151 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Vienna I Datacenter Scheduled Maintenance - zscaler.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28146</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing planned maintenance at our Vienna I (VIE1) Data Center. &amp;nbsp;&lt;br&gt;We expect minimal to no impact to services during the maintenance window.&lt;/p&gt;&lt;p&gt;Maintenance Window:&lt;br&gt;Start time is March 3, 12:00 pm PST (March 3, 20:00 UTC)&lt;br&gt;End time is March 3, 5:00 pm PST (March 4, 1:00 UTC)&lt;br&gt;&amp;nbsp;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 03 Mar 2026 21:29:10 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 27 Feb 2026 22:11:22 GMT</pubDate>
                                                            <startTime>Tue, 03 Mar 2026 20:00:00 GMT</startTime>
            <endTime>Wed, 04 Mar 2026 01:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 03 Mar 2026 21:29:33 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28146 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Brussels (BRU2) Datacenter Network Maintenance - zscaler.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28126</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in the Brussels II (BRU2) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-03-02 03:00 UTC&lt;br&gt;End: &amp;nbsp; 2026-03-02 05:00 UTC&lt;br&gt;(2026-03-02 04:00 - 2026-03-02 06:00 Local time)&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 02 Mar 2026 05:29:35 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 27 Feb 2026 02:08:36 GMT</pubDate>
                                                            <startTime>Mon, 02 Mar 2026 03:00:00 GMT</startTime>
            <endTime>Mon, 02 Mar 2026 05:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 02 Mar 2026 05:30:05 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter. However, intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28126 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Manchester II Datacenter Scheduled Maintenance  - zscaler.net, zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28121</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Manchester II (MAN2) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscloud.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscloud.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 2, 10:00 am PST (March 2, 18:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 2, 4:00 pm PST (March 3, 00:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 02 Mar 2026 23:39:04 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 26 Feb 2026 21:41:49 GMT</pubDate>
                                                            <startTime>Mon, 02 Mar 2026 18:00:00 GMT</startTime>
            <endTime>Tue, 03 Mar 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 02 Mar 2026 23:39:17 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28121 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance - zscalerone.net</title>
                <link>https://trust.zscaler.com/posts/28116</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on zscalerone.net cloud. This maintenance is scheduled for Friday at 12:00 AM Pacific Time on February 27, 2026 (Friday, February 27, 2026 8:00 AM UTC), and can take up to 4 hours to complete.&lt;/p&gt;&lt;p&gt;During maintenance, which includes the control plane, the Admin Portal might be temporarily placed into read-only mode, making the following unavailable: configuration changes, new user provisioning, and existing user updates through SCIM, LDAP, and SAML. A brief impact to new user authentication might occur. However, all the logs that are collected during this period will be available after the maintenance ends.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;latest-update&quot;&gt;&lt;p class=&quot;zs-update-latest zs-update&quot; id=&quot;resolved-update&quot;&gt;&lt;strong&gt;Latest Update - &lt;/strong&gt;&lt;span class=&quot;report-time&quot;&gt;Fri, 27 Feb 2026 13:43:04 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;div class=&quot;update-list update-1&quot;&gt;&lt;p class=&quot;zs-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 27 Feb 2026 11:55:48 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;The Zscaler Site Reliability Engineering team will be extending the scheduled maintenance of the zscalerone.net cloud by 2 hours.&lt;/p&gt;&lt;/div&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 27 Feb 2026 13:43:04 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 26 Feb 2026 20:26:05 GMT</pubDate>
                                                            <startTime>Fri, 27 Feb 2026 08:00:00 GMT</startTime>
            <endTime>Fri, 27 Feb 2026 14:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 27 Feb 2026 13:43:15 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28116 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on Los Angeles II datacenter. - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28106</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the Los Angeles II on the zscaler.net cloud. This maintenance can take up to 3 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 26 Feb 2026 09:12:45 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 26 Feb 2026 06:13:19 GMT</pubDate>
                                                            <startTime>Thu, 26 Feb 2026 06:30:00 GMT</startTime>
            <endTime>Thu, 26 Feb 2026 09:30:00 GMT</endTime>
                                    <ResolvedDate>Thu, 26 Feb 2026 09:12:50 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28106 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Urgent Maintenance on Chicago II, San Francisco IV datacenters. - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28101</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p class=&quot;post_body&quot; id=&quot;post_body&quot;&gt;The Zscaler Site Reliability Engineering team will be performing an urgent maintenance on the Chicago II, San Francisco IV on the zscalertwo.net cloud. This maintenance can take up to 3 hours to complete. We expect minimal to no impact to services during the maintenance window. All logs will be collected and available after maintenance is complete. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Thu, 26 Feb 2026 09:12:32 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 26 Feb 2026 06:08:52 GMT</pubDate>
                                                            <startTime>Thu, 26 Feb 2026 06:30:00 GMT</startTime>
            <endTime>Thu, 26 Feb 2026 09:30:00 GMT</endTime>
                                    <ResolvedDate>Thu, 26 Feb 2026 09:12:42 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28101 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Chennai II Datacenter Scheduled Maintenance  - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28096</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Chennai II (MAA2) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is March 2, 9:00 am PST (March 2,, 17:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is March 2,, 2:00 pm PST (March 2,, 22:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 2/26: Maintenance Date Update&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 02 Mar 2026 22:09:36 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Thu, 26 Feb 2026 00:45:32 GMT</pubDate>
                                                            <startTime>Mon, 02 Mar 2026 17:00:00 GMT</startTime>
            <endTime>Mon, 02 Mar 2026 22:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 02 Mar 2026 22:09:43 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28096 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>San Francisco IV (SJC4) Datacenter Network Maintenance - zscaler.net, zscalerone.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28086</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in San Francisco IV (SJC4) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window:&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-02-27 02:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp; 2026-02-27 04:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-02-26 18:00 - 2026-02-26 20:00)&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Mon, 02 Mar 2026 14:30:22 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Wed, 25 Feb 2026 02:50:19 GMT</pubDate>
                                                            <startTime>Fri, 27 Feb 2026 02:00:00 GMT</startTime>
            <endTime>Fri, 27 Feb 2026 04:00:00 GMT</endTime>
                                    <ResolvedDate>Mon, 02 Mar 2026 14:30:33 GMT</ResolvedDate>
                                          <customerImpact>During the maintenance, traffic will failover to redundant devices in the same datacenter, however intermittent connections and connection reestablishment may be observed.</customerImpact>
                                                  <Status>Completed</Status>
                                                <guid isPermaLink="false">28086 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Tel Aviv II (TLV2) Datacenter Network Maintenance - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28076</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;Zscaler will be performing urgent hardware maintenance in the Tel Aviv II (TLV2) Datacenter.&lt;/p&gt;&lt;p&gt;Maintenance window,&lt;br&gt;Start: 2026-27-2 21:00 IST&lt;br&gt;End: 2026-27-2 23:00 IST&lt;br&gt;(i.e. 2026-27-2 19:00 - 21:00 UTC)&lt;/p&gt;&lt;p&gt;During the maintenance, traffic will failover to redundant devices in the same datacenter. However, intermittent connections and connection reestablishment may be observed.&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 27 Feb 2026 20:25:16 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 24 Feb 2026 21:58:44 GMT</pubDate>
                                                            <startTime>Fri, 27 Feb 2026 19:00:00 GMT</startTime>
            <endTime>Fri, 27 Feb 2026 21:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 11 Mar 2026 17:25:59 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28076 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Vienna I Datacenter Scheduled Maintenance - zscloud.net</title>
                <link>https://trust.zscaler.com/posts/28066</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be performing planned maintenance at our&amp;nbsp;Vienna I (VIE1) Data Center.&amp;nbsp;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;We expect minimal to no impact to services during the maintenance window.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is February 26, 12:00 pm PST (February 26, 20:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is February 26, 7:00 pm PST (February 27, 3:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 2/26: Extended Maintenance&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 27 Feb 2026 02:46:58 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Tue, 24 Feb 2026 00:30:57 GMT</pubDate>
                                                            <startTime>Thu, 26 Feb 2026 20:00:00 GMT</startTime>
            <endTime>Fri, 27 Feb 2026 03:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 27 Feb 2026 02:47:07 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28066 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Melbourne II Datacenter Scheduled Maintenance - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28061</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Melbourne II (MEL2) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalerthree.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalerthree.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is February 25, 6:00 am PST (February 25, 14:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is February 25, 11:00 am PST (February 25, 19:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 25 Feb 2026 18:06:56 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 23 Feb 2026 21:19:41 GMT</pubDate>
                                                            <startTime>Wed, 25 Feb 2026 14:00:00 GMT</startTime>
            <endTime>Wed, 25 Feb 2026 19:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 25 Feb 2026 18:07:11 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28061 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>China Premium Access Plus Datacenter (Beijing V) Network Maintenance - zscaler.net, zscalertwo.net, zscloud.net, zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28056</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Beijing V DC network providers have advised maintenance work as below. During the maintenance window, China Premium Access Plus Services within this data center may experience intermittent disconnections.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start Time: 2026-03-20 16:00:00 UTC&lt;/span&gt;&lt;br&gt;&lt;span&gt;End Time: 2026-03-20 20:00:00 UTC&lt;/span&gt;&lt;br&gt;&lt;strong&gt;(Datacenter Local Time&amp;nbsp;&amp;nbsp;2026-03-21 00:00 - 2026-03-21 04:00 China Standard Time&amp;nbsp;(UTC+8:00))&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Reason of Maintenance: Provider advised maintenance.&lt;/span&gt;&lt;br&gt;&lt;span&gt;Impact During Maintenance: Intermittent connectivity might be observed during the maintenance period&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Fri, 20 Mar 2026 21:35:34 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 23 Feb 2026 17:59:09 GMT</pubDate>
                                                            <startTime>Fri, 20 Mar 2026 16:00:00 GMT</startTime>
            <endTime>Fri, 20 Mar 2026 20:00:00 GMT</endTime>
                                    <ResolvedDate>Fri, 20 Mar 2026 21:35:54 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28056 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Tokyo V (TYO5) Datacenter Network Maintenance - zscalerthree.net</title>
                <link>https://trust.zscaler.com/posts/28051</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;div id=&quot;post_body_wrapper&quot;&gt;&lt;p&gt;Zscaler will be performing hardware maintenance in Tokyo V (TYO5) Datacenter.&lt;/p&gt;&lt;p&gt;Scheduled Maintenance window,&lt;br&gt;&amp;nbsp; &amp;nbsp;Start: 2026-02-24 15:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;End: &amp;nbsp; 2026-02-24 19:00 UTC&lt;br&gt;&amp;nbsp; &amp;nbsp;(Local Time 2026-02-25 00:00 - 2026-02-25 04:00 JST)&lt;/p&gt;&lt;/div&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Tue, 24 Feb 2026 16:49:23 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Mon, 23 Feb 2026 10:05:34 GMT</pubDate>
                                                            <startTime>Tue, 24 Feb 2026 15:00:00 GMT</startTime>
            <endTime>Tue, 24 Feb 2026 19:00:00 GMT</endTime>
                                    <ResolvedDate>Tue, 24 Feb 2026 16:49:29 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28051 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Hyderabad I Datacenter Scheduled Maintenance - zscalertwo.net</title>
                <link>https://trust.zscaler.com/posts/28046</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Hyderabad I (HYD1) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscalertwo.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscalertwo.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is February 24, 9:00 am PST (February 24, 17:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is February 24, 4:00 pm PST (February 25,&amp;nbsp; 00:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 25 Feb 2026 00:08:32 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Sat, 21 Feb 2026 05:35:19 GMT</pubDate>
                                                            <startTime>Tue, 24 Feb 2026 17:00:00 GMT</startTime>
            <endTime>Wed, 25 Feb 2026 00:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 25 Feb 2026 00:08:48 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28046 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
          <item>
        <title>Frankfurt VI Datacenter Maintenance - zscaler.net</title>
                <link>https://trust.zscaler.com/posts/28041</link>
                                <description>&lt;div id=&quot;post_body_wrapper_main&quot;&gt;&lt;p&gt;&lt;span&gt;Zscaler will be expanding its global data center footprint and performing maintenance at our Frankfurt VI (FRA6) data center. We expect minimal to no impact to services during the maintenance window.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Please update your firewall policy rules and any upstream Access Control Lists to allow all IP addresses for this DC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;For more information, please visit:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://config.zscaler.com/zscaler.net/cenr&quot;&gt;&lt;span&gt;https://config.zscaler.com/zscaler.net/cenr&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Maintenance Window:&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;Start time is February 24, 9:00 am PST (February 24, 17:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span&gt;End time is February 24, 6:00 pm PST (February 25,&amp;nbsp; 2:00 UTC)&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Update 2/24: Maintenance Extended&lt;/li&gt;&lt;li&gt;Update 2/24: Maintenance Extended&lt;/li&gt;&lt;/ul&gt;&lt;div class=&quot;post-updates&quot; id=&quot;post-updates&quot;&gt;&lt;p class=&quot;zs-update&quot; id=&quot;resolved-update&quot;&gt;Update - &lt;span class=&quot;report-time&quot;&gt;Wed, 25 Feb 2026 01:55:06 UTC&lt;/span&gt;&lt;/p&gt;&lt;p&gt;This activity has been completed. Please contact Zscaler Support if you have additional questions.&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;</description>
                <pubDate>Fri, 20 Feb 2026 21:39:08 GMT</pubDate>
                                                            <startTime>Tue, 24 Feb 2026 17:00:00 GMT</startTime>
            <endTime>Wed, 25 Feb 2026 02:00:00 GMT</endTime>
                                    <ResolvedDate>Wed, 25 Feb 2026 01:55:12 GMT</ResolvedDate>
                                                                          <Status>Completed</Status>
                                                <guid isPermaLink="false">28041 at https://trust.zscaler.com</guid>
        <category domain="https://trust.zscaler.com">Scheduled maintenance</category>
      </item>
      </channel>
</rss>
